The consistent reaction I get to,"We're building a house!"is "OMG it was so stressful, awful, draining,etc I'd never do it again!" I was expecting congratulations. What part of building a house was most stressful to you? Our contractor tells us getting the basement in is the most stressful part. We're nearly through that and it hasn't been bad. Tell me what we have to look forward to!

Comments (33)

  • 12 years ago

    Right at this moment...

    The hole is collapsing and our neighbour's yard is falling into the space around our foundation. So far, the damage is minimal. We were ready to backfill anyway. And what has fallen on the neighbour's side is just gravel and mulch. Minimal to replace. However, until it's fully backfilled, there's a possibility that more will collapse, and we could be replacing their air conditioner, and damage to the actual house.

    I've hired a framer who seems to good to be true. What's the catch?

    The city has decided that we need to provide more info, and will be asking us to stop work.

    Am I going to be able to get the supplies delivered on time to keep my framer working?

    And we're just at the same spot as you.

    The stress factors also depend on the contract you have with your builder. I AM the builder. So I have to deal with the minutia, as well as the big things. But there will be no surprises to me. I have heard other people who are buying from a builder. They don't hear about things like the beams arriving 2 weeks late. But they also deal with things like the wrong window was installed, and there's nothing they can do about it. Several friends have had this happen, and the response is "too bad, if you don't want the house as we build it, we'll sell it to someone else."

    There's also delays, which can cause stress for everyone. Knowing when you're going to get to move is a giant question mark.

  • 12 years ago

    I agree with @kayakboy. You'll scratch your head at some of the crazy things they do that require rework. Examples in my case were putting the hose bib in a totally inaccessible area and then having to cut out a long chunk of the cinderblock to move it and installing the range hood too low, then having to rip it out to move it up and also fix something they screwed up with the venting. It's nerve wracking but a normal part of building, so don't get too stressed out about it. The important thing is that it gets caught early enough to fix. Keep an eye out for things like that; the builder caught the range hood, but I caught the hose bib.

  • 12 years ago

    Since I'm doing most of the work on our home, I have different stresses, but many of the ones I have apply to everyone. I had some work done by contractors, and the delays really stressed me out. Weather is another one- extended periods of bad weather can delay the build more than you would imagine. Right now, we're stressing out over things like paint and tile selections. You'd think that part would be fun, but it drives me crazy.

    DIY stresses include trying to finish the high parts of the house with on-and-off vertigo, and wondering if the inspectors will be happy with my work. It was some months from the time I ordered my windows until I installed them, and with solid concrete walls, I had a few sleepless nights wondering if I had done all my math right, and if the windows would fit. They all did!

    Maybe I'm a control freak, but i can't imagine having other people do all of this work. I spotted mistakes in everything done by others, even though it was only a small fraction of my build.

  • 12 years ago

    The decisions, decisions, and more decisions. And then second-guessing those decisions! Innumerable weekends spent at tile, plumbing, appliance, and lighting showrooms, not to mention the internet research. Having to specify every.last.thing. Ditto some of the "fix it later" attitude. Our GC is great, but some of the subs leave me scratching my head and thinking "you HAVE done this before, right?" Others do great work, but are less than reliable with regard to showing up, etc. Plus we are doing time and materials, so I am not convinced that we don't pay for people to fix their mistakes as the invoices are not that detailed.

  • 12 years ago

    I was the builder on my house. The single most stressful part were deadlines imposed by others. Besides this it was a great time for me.

  • 12 years ago

    But isn't anyone having fun?I mean you're building a house for crying out loud! So far it's been great. A dream realized.

  • 12 years ago

    It would be a LOT of fun, to see your idea come to life! If you plan carefully, don't make changes, pay strict attention to your budget and anticipate for (most) of the problems you may encounter...it should be FUN! :)

    Most people (not necessarily on this forum) stretch the budget to the breaking point in the planning stage, run into problems and are forced to cut back on their plans. More problems...more cuts, compromises and choices, every time they turn around.

    Most people seemed to get completely burned out about six months into the process and start choosing any detail in front of them...just to get finished!

    If you can learn from their mistakes, maybe you can keep that enthusiasm you start with...all the way through the build. I hope so! Have fun and make choices now, while you're excited and have time to do it.

    One idea I would use...approach the house like a wedding. Carry a planner book with you everywhere, with swatches and other samples. Choose every faucet, light fixture and floor covering as soon as possible! If you start out (and stay) organized...that's half the battle. Budget is the other. Those are two things you do have control over! Hopefully your crew will be great and everything will go as smoothly as possible :)

  • 12 years ago

    I am having fun! Designing and building my own house has been #1 on my 'bucket list' for most of my life. I am blessed with a unique opportunity to do this, and enjoy every day. That just makes the stress worthwhile and tolerable.

  • 12 years ago

    pay strict attention to your budget

    For some people, this can be the source of the stress. Having to decipher 5 quotes on EVERYTHING to ensure that you're saving as much as you can gets exhausting. That's not even necessarily because our budget is tight. If we go over by $50k, it's not the end of the world. But we don't want to go over by $50k just because we were not paying attention.

    Also, as much as you try to get everything settled early, that can also be part of the stress. My build has been delayed by almost a year. We JUST got the foundation finished, and my bathroom floor tile is discontinued and out of stock. The alternative I had picked out for a back up, also OOS. Time to look for another alternative. Nobody has anything similar. Okay, this one is nice. But it doesn't work with the wall tile. So I gotta pick a new wall tile. And now the vanity needs to be changed. But I was prepared! I shopped around! I knew what I wanted! Why am I going through this again?!? (Slightly dramatized, but you can see how neither approach is going to 100% prevent stress.)

    Someone I know is buying a builder tract home. She had to pick all her finishes within a couple of weeks of signing the contract. Done. She's happy and excited. They selected some stone for the kitchen counters and designed the entire rest of the house around that stone. Several months go by, and she now goes to choose her slab. It's COMPLETELY different from the sample. Instead of a grey/blue stone, it's now a beige/brown stone. Apparently they are cutting from the other side of the quarry now. And she's not allowed to change any of her other options because the builder has ordered everything else already.

  • 12 years ago

    It's definitely been fun for me, and that outweighs the stress. I've visited my house in progress so many times that it already feels like home, and I feel even more invested in it from being so closely involved in the process. I didn't get to pick most of the interior items because it was spec, but I don't mind the choices and have had a blast buying decor items that go with it. It's like pregnancy in a way. Stressful yet exciting, leading up a big moment. Don't let the stress overshadow the happy anticipation.

  • 12 years ago

    And yes, it's still fun. But I love this stuff. It's an experience that many never get to have, and I love the opportunity. But I can't imagine doing this if I wasn't really into it, because that would just be drudgery.

  • 12 years ago

    Lavender that's exactly what I've done. And I did it with my wedding too! It has made it much easier to pick the shop color when we have rock samples with us, then we can see which garage doors look best with that rock and the shingles...etc etc etc. I'm lucky that I'm more practical than dreamy and my tastes are in line with DH so when decisions need to be made we are mostly in agreement and I will get a functional and pretty house, not one that looks great, but the doors are in all the wrong places!

  • 12 years ago

    how much will it really cost ....... we'll find out friday (moving in saturday)
    other than that, everything looks absolutely perfect-no problems at all with the build......

    biggest problem dh and i had regarding the home: we had discussed slate for the kitchen, mud room and laundry room we wanted the grout lines to be minimal i wanted 12x18 rectangular he told the flooring people we wanted as large a tile as possible.....we ended up with 16 inch squares i was furious for at least an hour......that's it no other disagreements......

  • 12 years ago

    When you select counter stone it should never be from a sample. You should choose a slab in the warehouse that is then reserved until it is time to measure, template and cut. Someone took your friend for a ride and she should not be obligated to use that supplier.

  • 12 years ago

    Vendors not returning calls or emails.

    Days going by with nothing happening on the home.

    Being over budget from the start because Builder under estimated the cost of Lumber and Sheet rock rising.

    Poor communication with sub contractors.

    and we've only just beguuuuunnnn (carpenters song) pun intended.

  • 12 years ago

    Ah, yes, Juniper. The vendors not returning calls. That's so normal to me now, I don't even stress about it. I contact 10 with the hope of hearing back from 3. If they don't, they aren't interested in taking my money. Move on.

    And R8, I am well aware that's how it SHOULD be done. But we're talking about a big builder here. (She swears it's a custom build, but by "custom", she means she gets to choose finishes.) They wanted to know that she wanted Antique Brown granite (or whatever she chose) within a week of signing a contract. Maybe even before the contract, as that would eliminate the allowance issue that you hate so much. But then they didn't even break ground for another 2 months. And they've probably got 200 houses on the go at any time, so they aren't going to store and track all those slabs for 8-12 months until they're ready for them. And she's limited to that supplier, because that's who the builder uses for his 200 homes, so the price and delivery isn't going to be matched anywhere else.

  • 12 years ago

    and rain rain rain.

  • 12 years ago

    Build it, then fix it: I remember my grandmother saying about road construction, "If they built it right in the first place, they wouldn't have a job next year."

    Lavendar Lass, I agree with the "keep your eyes open everywhere" concept -- just yesterday I went into a Chinese take-out place that was new to me . . . and what did I see? MY built-in banquette seating! Okay, it wasn't really mine -- I mean, I didn't take it home along with my Sesame Chicken, but it was exactly the same size /shape /backed up to a window in the same way. I loved seeing it, and I did some measuring and even took a picture with my phone. I'm pretty sure the staff thought I'm nuts, but I don't care: It let me know that my sizes and measurements are dead-on.

    Amberm -- Isn't your friend within her rights to demand that they find her something similar to her first stone choice? I think I'd push that.

  • 12 years ago

    She's more an acquaintance than friend. And I think she's got some kind of resolution now. But it was stressful for her at the time.

  • 12 years ago

    Ah, so being an aquaintance-rather-than-friend, you probably just got the outskirts of the story rather than the day-by-day details. I'm sure the builder would've been quite glad to tell her, "What you want is impossible. You've just gotta understand", in hopes that she'd be compliant and give up.

    But, yeah, that situation is not acceptable!

  • 12 years ago

    Weeks of no shows and sloppy work.

    Hiring sub-contractors, chasing them to finish their work, firing them, hiring new guys and firing them too because of same problems.

    Chasing subs to correct their mistakes, again more delays, and living with other mistakes that can't really be corrected.

    That's the joys of self-contracting. The only consolation is at least I don't have all my eggs in one basket, and can fire whoever I want. All my sub-contractors had good references.

  • 12 years ago

    Out of curiosity, why did so many of you choose to be your own GC. We got 3 bids from GC's and then bid it out to 3 different suppliers and various subs directly, like we would be GCing it ourselves and working with a contractor was actually cheaper. Doing the GC myself sounds like it would be incredibly stressful!

  • 12 years ago

    "Out of curiosity, why did so many of you choose to be your own GC."

    It is cheaper. A GC will charge roughly 20% of the cost of the build. He does sometime get better deals, though, so the actual savings of DIYing might only be about 10%.

    But I'm not working at another job right now, so I have the time. And I'm a bit of a control freak. Being my own GC lets me decide what vendor to use, not limited to the ones my GC likes to use, whether they can do what I need or not. And it's an experience I find interesting.

  • 12 years ago

    My experience was very different. Got quotes from several GC and subs, and the GC rate was consistently more than 20% of the cost. One was actually double, cause it was a per sq ft estimate, but my house is very simple.

    I'm quite hands on, so don't mind putting some sweat equity into it. I took the contractor's supply quote directly to the vendor and got the same deal. We just finished framing and roofing. I'm on budget but not on time. So based on this experience hiring a GC will help if you want the house done faster. But then again, I have also seen houses run by a GC sitting empty for many days.

  • 12 years ago

    Is everything too simple of an answer? The budget, trying to pick out things w/o delaying as we need to move in by a certain date.

    Long story short, we're (well he is) GC'ing things ourselves, makes me a little worrisome.

  • 12 years ago

    But then again, I have also seen houses run by a GC sitting empty for many days.

    That's true. GCs don't necessarily care more about your house than the other 3 (or 12) he's working on right now. If the sub says he's not coming until Friday, nothing happens until Friday. When someone tells me there's going to be nothing done for several days, I look for other things that can be done in the meantime, or I find a way to get him there sooner.

  • 12 years ago

    I'm just starting out. So my stresses are:

    1) Clearing a 1 acre lot of trees!
    2) To Septic or not? Worried about odors, not so much of the maintenance.
    3) The taxes i will have to pay on the house once its done! living in NJ is not ideal to build.

    any suggestions on the above?

  • 12 years ago

    1) Push the trees over with a big excavator. Much safer than felling with a chainsaw, and the stump is already out.

    2) There won't be any odor with a properly designed and installed septic system. The rules have gotten much tougher in recent years.

    3) Don't build in New Jersey!

  • 12 years ago

    We're doing a septic, brother-in-law has one, no odor issues.

  • 12 years ago

    Started design in September 2013, broke ground in March 2014. Hope to be completed before Thanksgiving. There have been a lot of stressful parts and I started putting together a blog to vent them and provide some lessons learned. Hopefully it helps someone else from making some of the mistakes I have.

    Here is a link that might be useful: Custom build blog

  • 12 years ago

    The workers kept doing something wrong! Hubby went there every day after work and almost always found something done wrong. They used the wrong plans. We had 1 acre so the house had to be a little wider to satisfy the county. We had half moon window planned and they put in a normal window. We had a men's bathroom with a tan tub and they put in a blue one. Our back porch was stopped in the middle of the kitchen window. The worker's were smoking pot and drinking on the job. The next house we had build wasn't any better problem wise.

  • 12 years ago

    1. Gazillion decisions, things you never even thought about. (Carpenter: ''Do you want soldiers?'' Me: ''Yea, I'm a fan of the military, dad was a USAF pilot.'' Carpenter: ''No, soldiers here where the staircase turns.'')
    2. Second guessing your decisions. (I really should have made them change that shower pan. Wonder how much it will cost to rip out & replace.)
    3. Having to select things from online pictures & descriptions, because you cannot find them in a brick & mortar retail stores.
    4. Trying to find a KD willing to spend time trying out different floor plans, make suggestions and provide expert advice.
    5. Spending an enormous amount of time researching things, so you can make an informed decision - knowing you will never use that knowledge again. (At least at work when I research the best treatment for some condition, future patients benefit.)
    6. Do-overs = wasted resources, labor, time & frustration to me. (They built my staircase 3 times,)
    7. Days - weeks no one doing anything at the house. (Hello, remember me, I know I am not your multi-million $ project, but you did take my job, so can we finish it?)
    8. Needing to (but not being able to be at the house all the time) to make sure things are done how you want them to be.
    9. Trying to decide what to splurge on and what to save on.

    1. Not having the ''vision'' my builder does, to know how it will look when it is done. (When I sew up your hand laceration, I know how it will look even before I start.)
    2. Missed deadlines.
    3. Me having to point things out, they should have recognized needed addressing. (''Is that open square area under the doorway, the mouse door?'')