Cabinet modification project

15 years ago

First part of getting the soapstone installed is making room for the apron front sink.

We have to move the DW cabinet over 5/8" so that meant taking the DW out and dismounting the cabinet. Then we took the sink out and dismounted that cabinet too.

Needed to remove the top of the face frame and install a wider cross piece. Next step will be to cut down the back - the sink goes all the way to the wall.

Here is the cabinet all fixed up - we made shims that match the height of the soapstone.

And at this point, it's past lunch time so we're heading to DH's favorite Mexican restaurant.