Realistically: How long will i take?

18 years ago

to redo the kitchen?

Replacing everything - floors, cabinets, appliances, building a new pantry.

How long will the misery alst?

Three kids and one husband in the house :) got to know

Comments (12)

  • 18 years ago

    For us(used a design build) est. was 12 weeks it took about 16. That was from demo to usable kitchen. Good luck

  • 18 years ago

    DIY - you don't want to know - the worst of it for us was only about a month or two till the kitchen was working. A year later we still haven't finished - we still have to paint and do a few other little things. Once we gutted the kitchen, the cabinets went in quickly to give us a working kitchen. Appliances are quick and easy and that was with moving the range, fridge, sink issues, etc. and new floor, although I choose vinyl for easy cleaning. It really depends on who is doing it, what is done and if they work on it daily. Someone good, who knows what they are doing, should be able to get it done in a few weeks.

  • 18 years ago

    We are just finishing up a total kitchen remodel. All new custom designed cabinets, new sink, faucet, granite counters and bar, SS appliances, recessed, under cab, display cab, dining area and hall lighting, and new wood flooring in entry, office, kitchen, dining and hall. The only thing left is the backsplash and that has been ordered.

    Today (1/16) was work day 14. Projected finish date was 1/18. Our indecision on the backsplash is the only thing keeping the contractor from meeting their deadline.

    And the quality of work and overall look is beautiful.

    Jodi-

  • 18 years ago

    structural work on the kitchen started just after Thanksgiving and we are in the home stretch this week with finishing details. They took the holiday week off, and lost a couple of days to attend to a couple of other jobs here and there, so probably a total of 10 days was "downtime". Our project had significant structural work in taking down and beaming a wall and also included rewiring, moving plumbing/gas, install cabs and appliances including building some custom cabinet details, backsplash tile, all new floors (hardwood and tile) which entailed some slightly complicated levelling between the two rooms, some drywall framing, painting and all the finishing details (which is where we're at now - baseboards, trim painting, thresholds caulking etc etc etc).

    My guys are pretty fast though, and they don't sub anything out - they do everything themselves.

  • 18 years ago

    We started officially on Dec 13 and they came inside on the 31st or so. We demo'd the kitchen bath and spare room down to the studs. We had new wiring, new plubming, new everythign, plus stuff from upstairs moved. Today would be about 2 weeks since they came inside and all the plumbing and wiring is done, rough framing is done and the plasterers are expected on monday. I'd call it about halfway there. So probably all in all 8-10 weeks.

  • 18 years ago

    so many factors from how much structural work is being done to size of kitchen to who is doing it to how many surprises or wrong orders or delayed orders turn up (hopefully none, but...).

    i am projecting two months for my small galley ..but who really knows. i am not using a contractor, who might be able to schedule things more tightly than i. i am also going against advice of many and having demo done before the cabinets arrive -- that in itself could lengthen the process substantially, but i'm willing to take that risk.

  • 18 years ago

    It can be very quick.

    We had a down to the subfloor and studs remodel of our kitchen (roughly 12 x 19), including new layout, running new plumbing and gas lines, new floors, semi-custom cabinets, counter tops, backsplash, all new appliances, new lighting, etc.

    Working time was 3.5 weeks from demo to completion, plus an extra day when my painter came in to paint.

    My GC is a fairly large operation, and they don't start a lick of work until every component -- other than countertops, which need to be templated -- is sitting in their warehouse, inspected and ready-to-install. We paid a little more, but to limit the disruption and intrusion to such a short time period was worth it.

  • 18 years ago

    DIY down to the lathe, no structural changes: demo began the friday before Labor Day as of this past weekend 90% finished (posted pics earlier this week). We took up the floor tile 1 year prior to demo because it was coming loose...not a good thing for ceramic tile. The actual amount of working time on the major components was probably about 4 weeks (life kept interrutping).

    We hooked up a utility sink until we could get the granite installed. It wasn't bad, the weather was warm - we grilled lots of dinner outside and put everything else in the microwave.

  • 18 years ago

    I think it all depends how custom it is and how far away a specific item/items need to be shipped. Years ago when we were building a home in IL, there was a dock strike in CA. I had to wait 6 months for my ceramic tile. It may not be the builder, but outside sources that slow things up. Just an FYI. ;o)

  • 18 years ago

    So many things to factor in! We started demo one month ago today, December 17. We expected to be doing minor finish work at this point. Our big delay has been the cabinet maker. In the big picture, he really isn't taking that long (slightly less time than I would have waited to order cabinets from elsewhere), but he is taking longer than he told us he would. That means that we started demo earlier than we should have. If he had been finished on time, we'd be a week into using our functional kitchen. As it stands, we're still waiting for him to finish our cabinets. He's now scheduled to install at least all the base cabinet boxes on Monday. The counters will be installed Tuesday and Wednesday. He may need to continue to work on getting doors, drawer fronts, pantry cabinets, and shelving done, but he promises to have everything necessary done so the counters can be installed. So, even with delays, it looks like I could very well have a functional kitchen (still needing some finish work, backsplash, etc.) approximately one month and one week from start to finish.

  • 18 years ago

    We started our remodel on September 19. We took down 5 walls, put in new hardwood floors, tore down all the cabinets, put in electrical, etc. We lived around it (we did have a kitchen in the basement) and it was a pain, but we were able to function and we had everything in (but the pendant lights and a little painting) by Thanksgiving. So, 8-9 weeks. Officially we were not done till just before Christmas.

  • 18 years ago

    depends on how many people are on the crew, and how many other jobs there are going on for them. We have one guy (plus DH, who is doing all of the plumbing and electrical). Work started (we did all demo ourselves before this) Monday after Thanksgiivng. We are on the homestretch, after wall removal, beam placement, entire sub-floor replacement, new cabinets, new rooms created, new appliances, door moving. Todd took the week of Christmas off, and has lost maybe 3 other days to our indecision and weather. So we will be in the 10 week range by the time all is said and done.

    HTH