danielle00_gw

End in sight! Cabs arrive Friday

17 years ago

The Crown Point cabinets arrive on Friday morning. Unfortunately, my GC will be at another job and will not start installing until Monday (just as well-- if they are late, no sense in him sitting around here).

Yesterday he installed our new back door... My husband picked out an all-glass one. I was skeptical, but it makes the kitchen look so much bigger, lets in a lot of light, and allows me to look out on to the back porch/back yard-- will be nice when the kids go out to play and when we entertain.

Appliances should also be arriving soon. I called Lowes last week to confirm my DW and refrigerator delivery and they said, "Who are you?" THEN they proceeded to tell me that the were on back order until April (that's why I ordered them a month ago!). I got a refund and then ordered them through Eurostove, where I had already ordered my BlueStar and Prestige ventilation system.

Counter template is next Wed (the 18th)... counter install will be the following Monday... DW, range, and fridge hook up will be the next Tuesday (the 24th, I think). Touch ups on the 25... and (DRUM ROLL) inlaw's arrival is on the 28th! I think we'll make it in time (barring some disaster with the cabs or appliances!)

Sorry this got long!

Anyone else about to finish?

Comments (3)

  • 17 years ago

    How exciting for you! I wish I was about to finish, but today is only the second day of demo. I can't wait to see your cabinets (I've been following your remodel). And show us a picture of your new door please.

  • 17 years ago

    My husband is the picture man, so I'll have him take some pictures this afternoon-- it lets so much light in. Our kitchen really had a cave-like feel before (one window and one light fixture.. now we have recessed lights, fixtures, pendants, 2 windows, and the glass door.

    What does your project involve, chachashea? Structural changes? We took everything down to the studs, added a window/door, and moved plumbing.... if all goes as planned, it will be about a month from demo to completion. I'm on scurvy/rickets watch, so it will be a relief to be able to cook healthy food again!

  • 17 years ago

    We've changed the stairs to come out into the dining room instead of the kitchen, giving us two more feet of kitchen (POs had put a hallway in where the stairs came out). We'll also be adding another foot of wall space by enlarging an opening into the back room off the kitchen. All of that and we'll still end up with around a 12x12 kitchen. It is a 1923 brick bungalow.

    The original subway tile (located under the 1960s panelling) was set onto the wall in a concrete and wire mesh bed so demolition is going kind of slowly. Too bad we couldn't save it, but the layout was horrible. We're going down to the studs and getting reworked wiring and non-leaky plumbing. I've enjoyed ordering lights from Rejuvenation for the project.

    The cabinets will be shaker inset in coastal white (not bright, but not yellowish either). The island will have beadboard panels and a butcherblock top. The perimeter will be Minas soapstone.

    No budget for fancy appliances, but still kinda nice stainless steel--KA sxs fridge & dishwasher (boy will it be nice to have a full size, built-in dw!), and a Frididaire range.

    Due to size constraints the island overhang will be less than recommended, and the pantry behind it will only be 18" deep. That's okay because we always eat in the dining room now and the kids are little.

    Glad to hear you'll most likely be ready for the parental visit. Can't wait to see it!