Software
Houzz Logo Print
rmlsll

Moving shower drain

17 years ago

I'm finishing out the basement in my 7 year old home. The original builder roughed in the plumbing for a full bath. I want to move the shower drain about 10". The attached photo shows where the new shower wall will go and what now exists. The sketch shows what I plan to do. Questions are: Will my intentions meet code (IRC, zip 30114), and/or will the configuration cause trouble? Obviously, I'm trying to avoid the mess and trouble of taking out more concrete.

Comments (6)

  • 17 years ago

    Whether you can do what you propose depends on several things.

    First, you must have a cleanout for every 90 degree turn in your waste pipes...except that you only need 1 for every 40 feet (despite how many 90 degree ells are placed in the drain).

    Your set-up shows NO cleanouts.

    Second, you must provide a vent within at least 8 feet of the trap for this shower drain.

    Again, you show none.

  • 17 years ago

    Sorry, I didn't make it clear that all the other rough plumbing for the bath is already in and approved. There's already a toilet, sink, cleanout and vent (about 4 feet away). What I hope to do will result in a water path similar to any tub system with a "shoe" connection to the overflow, i.e., two 90 degree turns befor the p-trap.

  • 17 years ago

    The silence out there is deafening. Anyone care to share an opinion?

  • 17 years ago

    Since you have to break up the concrete anyway, its just as easy to relocate the trap. I don't see what effort you are saving going with your proposed solution.

    Bob

  • 17 years ago

    I used a chisel and hammer to break out the small amount shown in the photo. It wasn't easy. I'll have to rent a jack hammer to get enough room to move the trap. Not looking forward to the dust and mess. Beginning to look inevitable tho.

    Thanks, Ron

  • 17 years ago

    I just saw this thread today. You Can Move ten inches, as you drew it, if you have the height to do it. The first bend in the drain as redrawn is a tight bend. You are indeed allowed to have a tight bend (or "tight elbow" or "tub shoe") as the first bend. Just like a WC / toilet / closet bend / elbow. I'm writing out all the synonyms I can think of.

    The second bend is downwards to the P trap. Not good for future maintenance.

    You can also search on "offset drain" to see how two one-eight bends (135 degrees) are sold as a solution to the same problem you are facing.

    The amount of concrete to cut is minimal in my view, no matter which geometry drain you build. I'll vote now that you replace the P trap entirely so that you can run it differently, so that it folds back upon itself to give you pretty much the drain you want. Then you could use an offset as described above, if it still was necessary.

    Having written all this out, I'll now say that you are on your own and I'm not going to handhold you through this, and I'm not a plumber, so doublecheck everything twice elsewhere.