Have you used any type of form or written format (and if so, how detailed) that you give to a contractor you have visit your home to give you an estimate so that you are actually asking each the same questions? I do realize too that personality and references (hopefully) also play a role...but I know when someone comes to look at a job and a conversation starts and ideas thrown around...sometimes the original idea gets changed. I did see somewhere that there are forms for sale. Would like to hear how you handled the "estimate" process....ANY advice or information would be very much appreciated. Thanks!

Comments (5)

  • 18 years ago

    My guess is that the estimate process (as opposed to the bid process) is so unreliable to begin with that you can't worry too much about comparing the results. I tried to address this problem initially by typing up a kind of scope of work (what was going to happen to each room, size of the addition, etc.). But ultimately I went into it with a conceptual drawing by an architect so that the estimate was based on which walls were being changed etc. (This leaves a lot to the imagination due to no structural engineering, no detail on finishes, etc.)

    We got one estimate on which to base how to go forward (as opposed to which contractor to use). The estimate was off by 50% which made it, in retrospect, a lousy basis for making any decisions. I was told later that the architect expected it to be off by 20%.

    My conclusion: estimates are not worth very much to begin with so working too hard to get them to be based on the same assumptions may be asking too much of a lousy process.

  • 18 years ago

    If you're getting "estimates" for building on a fixed cost basis, they can, in fact, be "bids". As a builder selling from my plans, that's the way I prefer to work.

    But unless you've pinned down every last construction and finishing detail, no general contractor can provide you with anything more than an estimate. And with the tendency of homeowners to continually upgrade and change as the process continues--my experience anyway--they will typically be lower than your actual finished cost.

  • 18 years ago

    Fern4 and Worthy - thanks so much for responding and providing good info. This is very challenging for me...and I want to try to be as prepared as possible to cause the least aggrevation to all involved! I'm getting the sense that it is obviously an evolving process and always be prepared to pay more than you expect. Thanks again!

  • 18 years ago

    We are just about to go to bid for a room addition project, and our first two (of 4) contractors are coming tomorrow. I put together bid instructions and a bid form after reading a book recommended here. I'll post in a few days and let you know how it went. But yes, we're using the same forms, instructions, and plans with everyone.

  • 18 years ago

    I'm looking forward to see how your process goes....sounds like it is off to a great start! All (?) I want is a tear-down of an outside wall with a big brick fireplace in it, then add on a family room with only a gas fireplace. Thanks for responding and good luck after interviewing all your contractors. Will check this message board in a few days.