Software
Houzz Logo Print
axg9504_gw

Help need advice on jacking floor

20 years ago

My two story home is about 25 years old. The flooring is particle board and in my great room the floor is bulging up at the center of the room, right over the center piers. It is more pronounced at the end near the wall. We need a level floor to put carpet down because this is exactly where the seam will be made. The particle board in this area shows some signs of moisture , but looking at the cross section of it at one end, where I have cut out a small piece, I see a bulge but no expansion of the wood. A carpenter who looked at it says it is due to settling and the right way to do it would be to use 4x6 timbers to shore up the floor. He says he will check the level under the house and shore up only what is necessary. Is jacking up the house a safe practice? Is there anything I need to be concerned about. How can I determine that this is the way to go? Thanks for your help.

Comments (23)

  • 20 years ago

    What sort of foundation is under your house? Is there a full basement, or a crawl space?

  • 20 years ago

    It's a crawl space. I'm worried that this might be too radical a solution. Perhaps we should just replace boards and sand down as needed to level the floor in the spot where it is higher. There are water stains on the particle board at this spot. I can see a little bit of the subfloor where we removed a piece of the particle board above it and I can see one plank a little higher than the other. So I can't decide if it is warping of the p. board or something in the subfloor that is causing the slope.

  • 20 years ago

    It sounds like the foundation under the exterior walls has setled and the piers (probably with a smaller load) have not moved.
    Lowering the center is liable to be less costly than raising the entire house.
    A little crawling around under the floor with a level and a tape measure whould reveal if the joist are in line or the house has indeed settled around the beam. (This is a very good place to use a self leveling laser level to create a reference to measure from.)
    Lowering the beam by reducing the height of the piers is a real PITA but may be the best option. On a 25 year old house it has likely moved as much as it ever will.

  • 20 years ago

    brickeyee: thanks. the guy i've hired is going to shore up at the center of the living room using 4x6 on cinder blocks. The only sag we have is away from the center joists in the living room on one side only and it's not more than 1/4" at the worst point. It's been like that for several years and has not become worse. Are there any downsides to jacking, should I just have him sand and level at the top?

  • 20 years ago

    An update: I got a second opinion. This guy first said that the option was probably to lower the center since he thought the floor had settled on both sides. However measurements showed that the deflection was only on one side so that jacking up that side would be the way to go. He also mentioned sistering as the better option than using more piers. Can anyone tell me the difference? Which is better? Or give me a link that explains? Thanks

  • 20 years ago

    Sistering is adding additional wood to strengthen or restore the strength.
    Adding piers wil be a real PITA. Piers need footings at the required depth for the aea, and then have to be built up to the desired height.
    If you shave joist heoght you need to be very aware of how strength is affected. A joist changes strength as the cube of the height. You need to use the actual dimensions, but I will just use nominal here. A 2x10 would have a factor of 10 x 10 x 10 or 1,000. If you take one inch off, the factor is 9 x 9 x 9, or 729. A 10% decrease in height has resulted in a ~30% loss in strength.
    If you sister another 2 x 9 to the shaved one, you have doubled the factor to 1458, or about 50% more than the original 2x10.
    You can see what using actual dimension does. A 2x10 is only 9.25 inches, giving a factor of ~791. An ~20% drop from the nominal 10 inch lumber.
    There are still derating factors for species and such applied along with compressive loading limits, but the basic beam equation does not change.

  • 20 years ago

    Thanks brickeyee for the explanation, I learned something.But I'm still not clear on one thing. He is going to to raise one side using 4x6x12 and 4x6x8 horiz. and vert. timbers using cinder blocks. Would he be cutting or shaving a joist to do this?. Is sistering used to raise or simply to add strength and decrease flex? Or both? Thanks

  • 20 years ago

    "However measurements showed that the deflection was only on one side so that jacking up that side would be the way to go."

    Not clear what "one side" means.
    If you mean one side of the house has settled with the middle beam and other side staying level you need to raise the end of all the joists on the settled side at the same time. This is usually done using large timbers to span across all the joists (perpendicular to the present direction) and then raise the timber with jacks. Cribbing is used to get the jacks into the correct position (the typical hydraulic jacks do not have much lift range and are not very tall) and then hold things temporarily until permanent shoring can be placed between the joist ands and the foundation.
    A typical lift would get the spreader beam in position using cribbing at the very ends. Lumber is then placed under the spreader beam so the jacks have a good bearing surface. Cribbing is then used to get the jacks to the correct height to loft the spreader beam. The spreader beam is then carefully jacked up and all the joist ends lifted. Slow and level is very important to minimize wall damage. The foundation is then extended upwards to hold the joist ends in the new position. This can be masonry or pressure treated lumber to fill in the gap between the joists and the foundation. The jacks, cribbing and beams are then all removed.
    If the joists themselves have sag, they can be sistered when everything is level. The subfloor is removed, new joists sistered, and the subfloor replaced. It will rest on the new joists and not the old ones.

  • 20 years ago

    Yes one side of the ground floor has settled with the other staying level. We see evidence of it only in one room, exactly at the center pier where it is higher by about 1/4". You have given me a lot of good info. I'm going to check with the guy on his procedure. He's working alone, sounds like more than a one person job and more than one jack. He gave me to understand he was using only one jack. Thanks again

  • 20 years ago

    "He gave me to understand he was using only one jack."

    You can do it theis way, it just takes longer. Jack one end up about 1/2 inch, insert cribbing. Move to other end, repeat.
    I have access to all sorts of heavy equipment, and rent or borrow whatever I need. You might encourage him to check the local rental yard. Hydraulic bottle jacks are pretty cheap to rent.

  • 20 years ago

    He has at least 1 20 ton jack. Brickeye, do you do this for a living? I've read some articles on "this old house" and other places where they say raise no more than 1/8" per day or you'll have walls cracking etc. so I've been a little worried. BTW what's cribbing?

  • 20 years ago

    Cribbing is temporary support (usually lumber) used to support the structure during the lifting process, until the new permanent support, or permanent shims to the existing support wall/piers, can be put in.

    I used two 12-ton bottle jacks to reduce a significant out-of-level problem in my older home last summer. They're Chinese-made, cost me under $20 each at the local discount tool outlet. If I did this for a living I would probably have bought better quality tools, but they worked just fine.

    Are you saying that the part of the house above the central pier is 1/4" higher than the outside wall of the house? I find it hard to believe you could even notice this. There is a real risk of some annoying damage to your home by raising one side: cracked wall surfaces, jammed doors and windows. You should consider whether this work is really necessary. You might do better with your idea of sanding the high spot down.

    I am leery of particle board for anything, it just has virtually no resistance to water damage. If you can already see that it is damaged, I would replace it with something more suitable before installing carpet.

  • 20 years ago

    Well guys (assuming) - I've been screwed. Looks like I've been screwed by a flim flam artist, took off with a small deposit. Long story but it's not relevant now. There were lots of red flags in his presentation, but I went by gut feel. I guess I paid for a lesson.

    Airqual: we knew we had this higher spot for quite some time, because a CD storage cabinet at the spot had to be shimmed. When the carpet was taken up to be replaced, we were able to see better. What we have is a slant of about 1'4" at the end of the central pier near the wall and then it tapers off towards the center of the room. At the other end of the pier near the wall it's almost flat. We had another guy (not the one who gypped us) measure and confirm that the slant is only on one side of the house. This guy wanted to do the same thing - jack up one side of the house. He wanted a lot more and there were some contradictions in what he said too. I believe I am taking your advice not to fool with jacking up - replace any paricle boards that are damaged and sand to level.

  • 20 years ago

    A 25 year old house would have been subject to municipal codes in most states. I'd look up the original builder, and start some legal proceedings. A house this age is still a new house. He may have built on filled land, land fill, etc, which you can't do until nature does it's own compacting job usually taking decades. In any case, soil samples would have been taken making note of stability for footing sizes.

    On the problem in question, jacking the house isn't a huge job as it used to be, but you'll need to contact special companies that do it. A good one will leave you with a house with minor drywall cracking, that a few days work wouldn't fix. Also you'd have to handle the reconnection of wiring and plumbing and heat ducting.

    They'll set the house on two "I" beams and let you pour a new foundation, then for the second half of the work they'll come back and will slowly set it down on the foundation. Most will do both jobs.

    I know some codes allow piers for foundations. Again I would suspect pad sizes aren't to code, or posts, of wood, are not graded for continuous soil contact, or the fill problem mentioned earlier.

    I never liked the use of that fibre flooring and couldn't figure out why the stuff ever got the OK from the code people. It can't take moisture, bad(and dangerous) for bathrooms, and for roof sheathing deteriorates for a leaky roof.

    Andy

  • 20 years ago

    "A 25 year old house would have been subject to municipal codes in most states. I'd look up the original builder, and start some legal proceedings."

    Not even worth trying.

  • 20 years ago

    Agree with brickeyee - (I believe the builder has passed on). I'm getting conflicting advice when I call people. Some say don't mess with jacking, it's not needed. All are too busy to work on my job. What about taking off the top floor and using layers of felt to build up the subfloor? The fibre or particle board is fine where it has not been touched by water.

  • 20 years ago

    "Not even worth trying."....my thought exactly, Brickeye.

    I think you're on the right track, axg9504. Pull up the particle board and use felt to level as you reinstall. You'll be putting in a vapor barrier under the carpet, perhaps that will give the particle board some protection from future spills. I concur that jacking up the floor is overkill for the problem you are trying to correct.

    I wonder if you couldn't just replace the damagaed particle board, then use felt ABOVE it to level the floor? That would be a whole lot less work. [And you may find that pulling up the particle board without damaging it is tricky.] I don't see how it would make any difference to the finished carpet installation.

    Good luck.

  • 20 years ago

    Thanks airqual. At least 2 sheets of particle board need to come out. They have been water damaged and have 'exploded'. How do you pry up the nails in the board to get it out? any special techniques or tools?

  • 20 years ago

    Just remove it, destroying it in the process, hammer the nails in flush, and replace it with plywood. This is a good example why particle board shouldn't be used to build houses.

  • 20 years ago

    Go get s handtool called a "cats paw". [You'll see why it's called that when you look at one.] It has a notched, angled head that you drive under the nail head with a hammer, then pry the nail out. It will leave a small gouge where the nail was.

  • 20 years ago

    "Not worth it"

    Still, the minicipality would have to explain why they approved the bad work. Might be something in it.

    Andy

  • 20 years ago

    " Still, the minicipality would have to explain why they approved the bad work."

    unless you have solid evidence of malfeasance (bribes, payoff, etc.) a government inspector is out of reach.

  • 20 years ago

    Hi,
    I'm late to this party, but...
    You have water-damaged p-board underlayment. For now I'll assume that's over at least 1/2" ply subfloor. Said p-board has water damage precisely where the high spot is? Then, to me there's no proof that there's any out-of-level situation here. Best-case is that the blown-apart p-board has gotten repeatedly wet and expanded; 1/4" expansion is nothing- it can double in thickness before dissolving into sawdust. Take up all the underlayment, and then see how bad the out-of-level situation is, then shim as needed. If it is a true case of house settling over uncompacted fill, you would have a legal case, but it'll take more to prove it in court than it would be worth, esp. seeing as how original builder is dec'd.
    Casey