I have a home (built in 1974) on a crawlspace, floor in the bathroom is noticeably sagging at an angle. To the point I am now noticing cracks in the walls, trim, even the caulking between the vanity and the wall. Upon inspection under the house, I found that one of the concrete blocks holding up that area has more or less crumbled and is just barely hanging on at an odd angle. It almost appears as if something impacted the block and nearly knocked it out of place. ?? I had a concrete form out of 4x4's and rebar made, planning to place this next to the column of teetering concrete blocks and fill with QuikCrete. Once it dries I plan to replace the old crumbling block with new blocks and a screw-type jack (kind sold at home depot, about $25 and 18"-24") set on top of the new concrete pad. My question is this: When I go to install the screw jack thing, would a piece of treated-lumber 4x4 (2x4?? or is it strong enough???) be sufficient to put between the jack and the floor joist or would I need a steel plate ??? If the steel is required, where would I get something like that?? Home Depot/Lowes don't appear to have any steel plate... and what kind of steel, thickness etc. ??? The plan is to jack up the floor joists, then put new block on top of the newly poured concrete... then lower joist back down at some point. (Or I might leave the jack thing use both that *and* new concrete blocks). Any advice on this will be appreciated. -Mike in Frankfort, Kentucky USA

Comments (8)

  • 19 years ago

    Didn't the screwjack come with steel plates for each end? Mine did.

    I assume you are only looking for a way to distribute the point load at the head of the scerwjack and joist, not a support beam to spread the load across multiple joists.

  • 19 years ago

    Most Lowe's/HD/hardware stores etc have a rack of assorted metal stock (plate, channel, bar, etc) where you should find what you need. 1/4" should be plenty.

    You "can" use a chunk of wood instead but be certain the joist/scrap/jack are aligned properly. Even a slight misalignment can result in the jack tipping under load, that could be a real exciting event.

    If you have a significant distance to raise the joist (more than, say, 1/2"), you probably want to do it in several increments instead of all at once. If you raise it the entire distance at one go, you may find that, while you have closed up some of the old crackx, you may cause new ones. Other issues that often come up in leveling floors are doors and windows that are jammed or won't close afterward. Raise the structure in increments, with at least a couple of days between each, to let the structure adjust gradually. Inspect carefully after each lift, to see what is happening.

  • 19 years ago

    Yes, I just need to jack up one single floor joist.
    The column of concrete blocks put under it when the house was built is about to collapse...one block has disentigrated (poor quality concrete?) and also appears to have been hit and knocked out of place. By what, I don't know-- I wouldn't think you could crawl around and just inadvertently hit a block and knock it ajar but that's what it looks like. Like somebody kicked it or hit it carrying something in the crawlspace. Definitely strange. I guess the unusual load stress is making that cinder block crumble. I am afraid the thing will go and the floor will collapse causing big $$$$ damage.
    My brother made me a 2-foot square concrete form of 4x4's with mitred corners no less, drilled holes in it and ran steel rebar through...looks like a big tic-tac-toe grid. ;) He used this same design to shore up floors in another house and it worked good. Anyway, I'm pouring concrete tomorrow next to the spot with the crumbling cinder blocks, plan to wait a couple weeks for it to dry and then put in the screw jack thing and shore up with new blocks placed on the new concrete pad. Besides, Home Depot doesn't have any jacks at the moment and Lowes doesn't seem to know what I'm talking about...so that part of the project would have to wait anyway.

  • 19 years ago

    You can rent the jacks at most rental places. I would not leave the jack in place, and would probably put in some additional structure to spread the load to other joists, so the jack would be temporary only.

    Airqual's advice is good, though I think you could probably get away with 4 hours between jacks, rather than 1-2 days. If you have the time, though, why not take your time?

    Your plan of using a form should work, but may not be to code. In our area we have to go down 12-18 inches for a footing that size. If the soil in that area under the house is not stable enough to tolerate the load, you'll be right back where you started in no time. I'd advise checking with your local building department for their guidance.

  • 19 years ago

    Use a 24 inch section of lintel used for brickwork to spread the load from the jack onto the joist.
    Jack about 1/8 inch or so per week until everything is back level and flat.
    The typical pipe type jack with a screw at the top requires welding to be permanent.
    The screw collar must be welded to the pipe, and the pipe cross bolts for length adjustment must be tacked in place.
    Some AHJs like to see the screw welded to the collar after final adjustment.

  • 19 years ago

    1/8 inch per week? Curious where that number comes from. That would be a month for a 1/2 inch movement, which is a long time to wait. Depending on the type of framing, I've seen guys do 1/2 inch in a day, with no problems, and these are guys who jack houses all the time. They would wait about 2 hours between jacks, carefully looking for cracks and mis-matched movement (i.e., one part of the house moving faster than another) using string lines while they go. Not saying you're wrong, Brick, but just that my experience is different.

    Balloon framing takes longer to jack merely because you have to make sure all your floors are moving too (in other words, you have to put in some temporary structure from floor to ceiling all the way up to the top of the house, so the walls don't tear away from the floor/ceiling). That type of framing is common in the Northeast, but rare out here in the west. For standard framing, things are all tied together and move as one.

  • 19 years ago

    "1/8 inch per week? Curious where that number comes from."

    Long and sometimes painful experience.
    How long do you think it took to get to the condition it is in? A wwek? A month? 50 years? 100 years?

    Sometimes with older houses the joists will not straighten at all.
    At least with a slow jack you can tell what is happening and take other steps to prevent massive plaster cracking.
    If you are willing to go back and repair plaster damage you can go about as fast as you want.
    I have jacked 1/4 inch, waited 2 weeks, wet the wood to see if it will soften and bend, and then had to tear out floors to preserve walls with ornamental plaster.
    I have even torn out 100 year old floors and used the wood over. Cutting the nails used for every strip of flooring.

    The jobs I do would not tolerate ripping out the ruined plaster and replacing with drywall.

    I have even moved houses, and found it was actually easier than trying to get one back into shape when floors had sagged badly.

  • 19 years ago

    i agree on the slow jacking. From my experience....put the jack in and raise until it gets a little tension. Come back in a few weeks and you can give the jack a 1/2 turn or so with your little finger. Just continue doing that, checking for level in between. I normally get steel plates at metal scrap yards. Usaully a good variety of sizes and thicknesses for cheap.