rotting threshold

19 years ago

Hi,

We had a new deck built about 4 years ago at which time we poured a big concrete slab which the deck was built over. It extends the footprint of the deck and serves as a footing for the stairs etc. The problem is that the slab runs right up to the door to our basement and was poured so high that the threshold sits right against the threshold for the basement door and has caused it to rot. We could replace the threshold but this does not resolve the problem that the concrete is contact with the threshold, framing for the door and the siding of the house and I believe will continue to cause rot if not corrected. I am wondering what our options are for addressing this? We thought about jackhammering out the section in front of the door but that will look rather messy. I am thinking we need to have the concrete cut but will that be very expensive? Also would it be difficult to find someone given it is a pretty small job that I am guessing would require some signficant equipment? The slab is probably 6 inches thick.

Any suggestion are much appreciated. Thanks!

Comments (3)