Software
Houzz Logo Print
josie724

Getting Closer AND Further.

18 years ago

Well my mural has been set, I'm really happy with the way it came out. Back splash tiles will go up tomorrow. When my contractor tried to permanently install my cabinet depth Viking FD fridge with the side panels and Vent on top, it would not fit into the cutout. Part of the problem is that the floor is off level. The doors on top of the fridge will hit the vent and there was no room to move the cabinet doors, they are full overlay. So he called the cabinet installer, who luckily was in the area, he came right over. There were two solutions, raise the entire bank of cabinets which include a 36 inch pantry and a 21 inch cabinet with a glass floor to ceiling cabinet on top of the counter. Or ordering smaller doors, which would involve the KD, which I want to avoid at all costs.

Guess which option we chose? Raising the bank of cabinets, which actually didn't take as long as I thought it would. The installer got here at 10:00, (it's now 4:00pm) and he's almost done resetting the cabinets.

One step forward two steps back....Oh well, I guess it coulda been worse.

Comment (1)