Can a realtor do this?

11 years ago
last modified: 11 years ago

So we put an offer on a house that was in the process of being built. The offer was accepted and all parties signed the contract.

A couple of days later, the selling agent sent my agent an addendum indicating that any upgrades made to the house would be charged at a 20% premium. We, of course, told our agent that we would not be paying that since it wasn't a part of the executed purchase agreement.

My agent has spoken with her broker, and her broker and spoken with their lawyers, and the broker has told my agent that the additional fee should have been disclosed on the purchase contract. Furthermore, since my agent and the sellers agent work for the same real estate company, our agent's broker has spoken with the seller's agent's broker about this too.

What hasn't happened yet, though, is getting confirmation that we will not be charged the 20% premium.

I'm quite honestly not sure how we could be responsible for paying any additional fees since it was never disclosed until after the executed purchase agreement and we never signed anything agreeing to pay the 20% premium.

What I'm not getting, however, is the same level of confidence from my agent and I'm not sure why. It seems very black and white to me that we should 100% not be resposible for that fee, and there shouldn't be any discussion about it.

Other perspectives?

Comments (170)

  • 11 years ago

    Although, I like the idea of renegotiating I wouldn't consider it before talking to an attorney. The problem is, at this point you are more vested in the deal than he is. He is actually in a better position than he would have been without you, he now has a house that is wired for home theater stuff, and $6,000. Where you are in a much worse position. So negotiations will strongly favor him, and while you will probably get some peace of mind, you are most likely going to codify the things you are currently objecting to. Furthermore, I think it will limit the future actions you can take against the realtor and/or the seller.

  • 11 years ago

    Have to agree with bry911 on that one.

  • 11 years ago

    @ cpartist

    I am not sure you are correct on the 20%. While, charging a premium on upgrades was not in the contract but neither was the right to have upgrades. The builder is not changing the contract any more than the OP.

    It is just a signed offer. I mean if I offer to buy your house for $250,000 contingent on the leaky faucet in the kitchen getting fixed. I can't then call up and say, I would like it replaced with a special order faucet from Germany. I will pay the difference if you need. The contract is for the faucet getting repaired so replacing it is your idea. I can then turn around and say, OK but I want more money if I am going to do that.

  • 11 years ago

    Chris, man, you have my sympathies. I could only tolerate to read about 2/3 of this thread and then had to stop. I'm really not feeling the vibe to place blame on you; your RE agent absolutely should have protected your interests by getting a complete buit-to-spec contract executed rather than a vague "simple" agreement. This move by the builder to spring a 20% up charge on you after the fact was calculated and deceitful. Of course everyone is correct that builders make a ton of profit on up charges, but those are instances where the up charges are permitted by the contract. ncrealestateguy has given you some excellent advice, IMO, and I encourage you to carefully consider all he's had to say. I would like to add a couple of other thoughts for you to consider: Most (if not all) courts will only read the "four corners" of the contract. In other words, they will not consider verbal agreements, outside evidence, etc. Insofar as the posts I read are concerned, there is a lot of speculation /paraphrasing about what the contract says, or what the industry practice is, but the actual language is not included in any of the posts. It may be that there is no language as to a lot of these points. However, to the extent some term is included in the contract, it controls. For example, if the contract says you are permitted to select upgrades, get a credit from the base price, and owe the difference to the builder but makes no mention of a 20% up charge for this service, then you do NOT need to pay the up charge! The court is not going to impose an up charge where none existed in the contract. You can take that to the bank. Similarly, you cannot use your visit to the base model home as evidence of what the builder grade materials should be in your home, in the event the builder decides to use poorer quality materials. The contract must spell those things out.

    If I were in your position, I would pursue a couple of options: 1. sit down with your RE agent and create an amendment to the contract that specifies what finishes and upgrades you want included on your home. Make this list as detailed as possible and know what the cost of materials for these finishes would be. Figure out the difference between these costs and the standard costs and offer to pay this to the contractor 2. determine a fair price to pay the contractor for the additional work and any related costs (wiring, painting, labor, etc. that is above and beyond what would be required of the standard finish.) 3. present this list and fee schedule to the builder for his concurrence. Expect some pushback and be willing to do some negotiation if the builder points out reasonable expenses you've not considered. 4. Do not agree to a 20% flat fee up charge. That is just total BS. 5. Know your bottom line and stick to it. Alternatively, walk away and insist that you be returned your deposit and compensated for the costs of the wiring you've already paid for. For the contractor to simply think he can retain the wiring would be unjust enrichment and you could pursue a legal claim against him.

    Out of curiosity, did your RE agent or his/her company ask you to sign any sort of document waiving a potential conflict of interest in representing both parties to this sale? If not, and things start to go south, I'd sure be expecting the RE firm to be ponying up some $$ for their contribution to this whole fiasco.

    Good luck to you, and I hope your experience on this thread does not keep you away from this site - there are tons of helpful people here and all those who posted did so not to frustrate you but out of a sincere desire to be helpful.

  • 11 years ago

    Chris, If you waiting on an answer has been since April 9th, then either you, your agent or both are not being pushy enough. You need to demand that you get answers to ALL of your questions w/in 24 hours. These are not difficult questions to answer.

    And I think Greg has it right... the listed specs in your original contract are not upgrades! They are what the builder has agreed to install at the agreed upon contract price. You do have an agreed upon contract price, no? You do not have to pay an overage plus 20% on these listed items, no matter what the allowance sheet says now. They are spelled out in your contract, plain and simple.

    And, yes, both parties have to sign and date all addendums in order for them to be executable.

    Like another poster said, you need to get another contract executed, because this one lacks soooo many details that both you and the builder need to be spelled out. I am telling you right now, if you do not do this, there will certainly be more miscommunications and expectations later in the build.

    Tell your agent that you want a new contract to be signed and all questions answered w/in 24 hours. After all, you have been strung along since April 9th. And tell that office Broker In Charge to take his greedy $295 "office fee" and shove it! 99% of offices do not charge this fee anyhow. I bet this agent did not even give you a "Working With Agents" brochure at first substantial contact either, did they?

    Sorry for being harsh, but agents and offices like this one give us decent, professional agents a bad name, and I call them out any chance I get.

  • 11 years ago

    A big problem with Chris's side of the argument against the fee, is that he didn't even know what the upgrade costs would have been until after he'd been informed of the fee.
    So it isn't like he was quoted $1000 for upgrade 'X' and then the fee was sprung on him and it's suddenly $1200. That would not be acceptable.
    He had no idea what the cost was. He signed the contract. If the cost turned out to be $2000, he would have happily paid that. It turns out that the cost is $1200. He's objecting to it because of the breakdown, not because of the actual cost.
    So if the builder hadn't been so transparent in his pricing, he could have asked Chris what upgrades he wanted, gone to the subs and found out what they would bill, tacked on whatever he wanted and handed a different bill to Chris. That would probably have been a fine scenario under the original contract because there was nothing specified about how the upgrades would be handled.
    In that case, the definition of the cost of the upgrade is a sum of the cost of the sub plus the builder's fee.
    Just like the cost of the sub is the sum of the materials plus a labour fee plus possibly an extra little something. Who knows what the cost that the sub quoted is composed of. He wasn't being transparent. Maybe if he had been, Chris would have objected to that quote too. Or maybe not. We'll never know.
    If the builder hadn't been transparent, then Chris probably would have happily paid and nobody would be the wiser.

    I honestly don't think the builder is trying to be shady. I think he's just inexperienced.

  • 11 years ago

    greg_2015 so if you were buying a new car and wanted upgrades and you signed a contract and agreed with the dealer that you could have upgrades for extra but it wasn't specifically written in the contract...... then your hit a few days with a notice saying, "oh by the way if you pick upgrades I'm also charging you an extra 20%" and this was after putting 6K down on the car that you can't get back..... would be be all, "sure no problem"? I have a feeling that you might feel like you're being shafted a little bit.
    And yes I know that is a total run-on sentence.

    And yes I am also aware it doesn't work like that with car sales, just using it as an example.

  • 11 years ago

    Car dealers do the exact thing you are saying they don't. Xzilon coatings cost about $125.00 for enough to do several cars, dealers charge $375 - $600 per car. Did you really think that the cargo net costs the dealer $99? Some dealers will install your own trailer hitch for specialty trailers. Their installation charge is about double what they charge for installing a trailer hitch they provide.

    There is a reason that on a cost plus build, that builders add a markup to the product. It has been discussed many times but jump over to the building a home forum and ask how many of those people didn't have markup on their overages. A few will, but far more will pay cost of merchandise plus a percentage regardless of where you got it.

  • 11 years ago

    Oh believe me, I'm not saying they don't mark that sh&t right up. I know they do and we walk away from more than one dealer when the finally tally was crazy and we weren't even asking for upgrades and when we pressed one dealership we found stuff was snuck in there AND that was the mangager too. Needless to say we did not sign the contract, however those prices were given before anything was finalized and signed.

    It's not the fact that there is a cost or percentage, it's that it wasn't disclosed. I think you aren't understanding what myself and some others are trying to say. It's principal of the matter.

  • 11 years ago

    Most of the above back and forth is moot if the deal is not executed on a proper contract.

  • 11 years ago
    last modified: 11 years ago

    While it is true, I might not be understanding what you and the others are trying to say. I suspect the opposite is also true. So many people are harping on the fact that the percentage wasn't disclosed, and why would it be? I mean there wasn't even an allowance written in. I think many people are forgetting that he supplied the contract to the builder. After all, it was his realtor that filled out the contract, and the builder accepted it, but still they are both equally responsible for its creation. He didn't put how upgrades would be handled in the contract either. I am not sure why everyone assumes that since it wasn't specified how upgrades should be handled the builder should go against the industry standard and assume more financial risk with no financial reward. I sure as hell hope my insurance company charges more to insure a Bugatti Veyron than they do a Ford Focus.

    What you are saying is the builder is being a bad guy for saying, "Yep, we didn't talk about upgrades but if you want any I have a 20% upcharge." What if you say, "I am not signing that." Then he responds with, "Great then I will make the selections for you, I hear shag is coming back, and just so you know my favorite colors are deep purple, brown and avocado." You then say, "OK, you win." and he responds with, "NOPE! I am not going to sign any changes to the contract, you specified glass tile and I will pick a glass tile for you, the contract states that you will 3/4 Oak so I will see if I can find some lower grade flooring for you, if you wanted better you should have written it into the contract." He can then say no to every item that you didn't put in the contract. Why should he allow you to modify the contract that you wrote when you won't allow him?

    Your realtor has gotten you into a mess, he was the person who should have protected you from this happening and he didn't. Be upset with anyone you want, just be more upset with your realtor. I agree and said it before, this contract may not even hold up in court as it is so vague. I don't know but I am not sure I would talk to the realtor's attorney about it to find out. Might want to look into your own at this point.

  • 11 years ago

    bry911 No I actually do 100% get what you are trying to say. You're just looking at it from more of a legal view while I am looking at it from a moral view. Legal the builder saying that the buyer can do upgrades won't hold up against the written contract. Legal the builder has every right to hand the buyer an addendum for a 20% fee for any upgrades. Morally, discussing upgrades but not disclosing that there would be an additional fee on top of the difference in value, is just plain wrong. When someone feels like they have no choice because if they walk away they loose money, if they agree to it they spend more than what was the agreed price or if they say no they risk having a shoddily built house, how is that right? I'm not saying the builder is out to get anybody, how would I know that? I'm just saying that OP has every right to feel angry that it wasn't disclosed before hand.

  • 11 years ago

    OK I understand now. Since it was not disclosed in the contract, the contractor shouldn't follow industry standard and is wrong for attempting to. Did you specify that the hardwood floors should be installed using nails or glue? Since we think industry standards are unreasonable unless specifically noted, maybe twine is an option for him, will it be OK if drywall is sanded smooth...

    I know I am being flip and over the top and the contractor may well be a crook. But it is your realtor that is most responsible for getting you into this mess. The contractor may be just as annoyed as you are. And I am not stuck on the legal part either. I just don’t see how doing the things that are standard in almost every build are wrong because the OP didn't include it on the contract he offered. Your beef seems to be that the percentage is OK if revealed ahead of time. Well then the OPs realtor should have written it in. The bad thing is this contract can go soo much farther south than 20% on a few items.

  • 11 years ago

    Thank you to you all for your time, and your insight. I have learned so much, and I hope to never make these same mistakes again. For now, I have learned that the seller's agent has a meeting scheduled with the builder tomorrow, presumably to discuss this issue. I'm still hopeful that I will not be charged the 20% premium, so for now I'm going to wait to find out the result of that meeting. I will follow up and let you all know the result as soon as I'm informed. I'll figure out my next move once I have their decision.

  • 11 years ago

    Chris - What percent would you be comfortable paying? I ask because I do agree with bry that adding a percentage to the subcontractor's cost is industry standard. In fact, lots of subcontractors will not give you a price but rather will give the cost to the builder and let him tell you what the cost to you will be, these two costs will not be the same. For example, if you go to Fergusons to pick out your plumbing fixtures, they will not tell you how much they will cost. They may tell you the MSRP, but not what it will cost you. They will send the pricing to your builder and your builder will tell you how much it will cost you for those fixtures.

  • 11 years ago

    First I spoke to my soon to be builder today and confirmed the following that was in the contract he sent us to look over. This contract is not the final contract but the one he uses, so we could give it to our lawyer to look over before we actually fill in the contract blanks. We are doing a completely custom home. We were given a range of what it will cost us to build and we have agreed on a price for the lot we want.

    So far all we have put down was a small good faith amount saying that we (the builder and us) would come up with a house plan within 30 days and if not, we'd get our money back. If we agree to go over the 30 days, as long as we are working on the design we still have the option to pull out.

    We are a few days past 30 days but have a house design we are very happy with so are continuing on. For the past two weeks I've been running around with his designer so they could get a good idea of what exactly I want in the home. What moldings, coffered ceiling or not, types of windows, sliding doors, fireplace, floors, tile, appliances, how I want the pool to look, pool cage (this is Fl), etc, etc. This past week I met with the pool designer and the kitchen designer. Tomorrow I go to show the designer the tile I like, and the plumbing fixtures I might want. His reasoning for doing this is he said he tries to avoid change orders. He said his clients usually have very few change orders because they do all the preliminary work before even signing the contract. He also said that the contract will have everything spelled out room by room, including the size and shape of trim work, etc.

    We have talked to his clients and everyone has nothing but positive things to say about him and his work is impeccable. In fact we went to one of his developments during the week unannounced and talked to his clients who were out walking, etc.

    If we do have an upgrade, then yes, we too will be paying a 20% fee for any upgrade. The 20% is NOT on the entire order but only the difference between the allowance and the new price. So for an example, after all this preliminary work, I decide that a $1000 dishwasher will work well for me. However 3 months from now, after the contract is signed and a $1000 allowance is allowed for a dishwasher. However, when it's time to let my builder know what exactly I want, I decide that I actually want a $1500 dishwasher. I would then owe my builder $500 for the upgraded dishwasher PLUS $100 (20% of $500) for the change fee.

    Conversely if the contract says I have an allowance of $1000 for a dishwasher, and then decide that a $500 dishwasher is good enough, then we will be refunded the $500 difference.

    The good thing for me is I have a fairly good idea of what I am looking for in terms of house style, and house fixtures, etc. This might be more difficult for someone who starts without a clear vision of what they want.

    Of course his number might come in widely different than he said he thought it would cost but when I talked to him the other day, he said I was still well within the number he had figured for our build.

    The difference between ourselves and Chris is our builder is disclosing all fees now before we have even started. We will be signing a build contract. He will base his allowances on what it is I am choosing now. Granted I may change my mind as we get closer to installation of all items, but we shouldn't be too far off. Then it will all be spelled out in the contract that both of us will sign. If we want any changes at all, it has to be agreed to and signed off on by both of us. None of this happened with Chris. He and the builder had different assumptions.

    Reading through this thread again, I realize as someone else said, that Chris's builder sounds like a novice building custom homes, whereas this is all my builder does.

  • 11 years ago

    funny I just wrote my builder asking him what the upgrade % is based on. His cost or retail or a combination of the two.

  • 11 years ago

    @ Chris - I just want to clarify that I don't think you have done anything wrong. I think you hired a real estate professional to guide you through the transaction and he should have done so. If there were areas that he needed assistance he should have gotten that assistance and if there were areas where you needed an attorney he should have pointed that out to you. He didn't and now here you are.

    However, I don't think you are even aware of the trouble you are in. At times during this thing you have been like a guy on an airplane plummeting to the ground complaining because you had to pay $2 for the headset. Your risk exposure seems monumental to me and you keep worrying about whether 20% is fair. You have none of the protections that a traditional build contract would give you, while getting none of the advantages of a simple sales contract. If it goes completely south, it is not out of the realm of possibility that you could be left holding the bag for hundreds of thousands of dollars, and you ending up on the wrong end of tens of thousands in repairs or modifications is more than possible. You have a giant problem and I think a lot of that problem has to do with your agent. Now you are letting your agent go back in and negotiate some more. Unless you happen to be very serious long term friends with your agent then your agent is not your agent anymore. Right now, if he has a brain in his head is currently in the process of covering his ass as fast as he can.

  • 11 years ago

    @cpartist - I messed this up myself a few months ago so I remember. Cost plus is his cost plus the percentage and is based on what he actually paid. Any kind of trade discount, volume discount or rebate should be deducted from the cost before the percentage is added.

  • 11 years ago
    last modified: 11 years ago

    agree bry911 ^^ x 1000000000%

  • 11 years ago

    Bry911, so what I think you're saying and I think what he tried explaining to me in my email today is that if he gives me a $750 allowance for a dishwasher and I find one for $1500 retail but his cost to purchase it is only $1000, then I am paying $1000 plus 20% of $250?

    I assume he'll be giving me allowances based on his cost.

  • 11 years ago

    And I too agree 1000% with what bry911 said about the mess you are in Chris.

  • 11 years ago

    @ cpartist - Yes that is right. You should ask if your builder will also let you net allowances together. So if you are under 500 on one and over 500 on another they will net out.

  • 11 years ago

    Thanks bry911. I'll ask.

  • 11 years ago

    What's the basis/cost that you pay the 20% on? Is it builder's cost price, contractor's cost price? Resale price? Maybe that's what you could negotiate, i.e. 20% on builder's cost, which sounds reasonable.


  • 11 years ago

    It seems to me that it is actually the OP that is "modifying" the contract, not the builder or realtors. By definition the addition of "upgrades" is a contract modification... The builder is simply codifying the cost.

  • 11 years ago

    Nosoccermom and Saltidawg -- those points keep being raised but fall on deaf ears. I gave up trying to follow this thread between that and the new and changing details. And things that weren't making sense. Continuing to stir the pot here is not productive.

  • 11 years ago

    Chris what was the outcome?

  • 11 years ago

    cpartist - still no answer.

    My realtor asked me to meet with her broker, so I'm guessing they've requested the meeting to break the bad news. The meeting is at 12:00 today, so I should find out shortly. I'll reply again after the meeting.

  • 11 years ago

    Good luck!

  • 11 years ago

    Well surprise, surprise - still no answer. The broker is out of town next week, so she said she's trying to get things resolved by week end. She mentioned a meeting later today with the builder's agent, so hopefully this will be resolved soon.

  • 11 years ago

    Well, sounds kind of like they are stalling. Get far enough along on the house and they probably figure you will become too invested to object and you will just cave in order to keep things on track.

  • 11 years ago

    If I were you I'd let them know that if you don't have an answer by Friday at the latest, you'll let your lawyer take up the issue. Then find yourself a lawyer who deals in litigation. No one is afraid of RE lawyers but are scared silly of litigators. Also, litigators take no money UNLESS you win.

  • 11 years ago

    It has been since April 9th! You deserve an answer today! You need a new contract drawn up today!

    How can your agent have set up a meeting with the Broker In Charge, only to find he is out of town for a week?

    He has a cell phone doesn't he?

  • 11 years ago

    They really are stringing you along. You need to start acting like a Nu Yawkah.

  • 11 years ago

    How can your agent have set up a meeting with the Broker In Charge, only to find he is out of town for a week?

    The broker is out of town next week. Chris actually met with the broker yesterday and the broker hopes to wrap up the problem before the end of this week.

    What I don't understand is why they wanted to meet with him to tell him that nothing has been decided. What was the point of the meeting?

  • 11 years ago

    I agree 100% that the builder is trying to string you along. How do I know this??? Our builder is doing the exact same thing. Not to the extent that yours is but, in similar structure. We are building a tract house with a lot of customization. We asked the agent representing the builder a zillion questions about the build and costs associated. Many were asked over email to have proof of her answer. Well, that agent quit and we got a new one the day before we were starting the upgrade option selection.

    In our contract, it talks about the builder potentially charging extra for fill removal. We asked several times what this would cost and were told one estimate (mind you in an email so we have proof of her answer). Well, after they dug our basement and laid down the foundation, we got a bill for THREE times what we were told. This was in the beginning of March. We asked many questions about this charge - we wanted proof of the charge from the excavating company, we want to know how the builder determines regular fill removal from 'extra' fill removal (how do they decide this???), we want to make sure they were not selling the fill to another builder (as they often do this). Mind you we didn't get any answers yet. We keep getting the run around and no one has answered our questions in TWO months. They keep making up excuses - oh we will talk to the VP or the agent or our grandmother in Kentucky or yada, yada. I'm annoyed and pissed but they know that we don't have much of a choice. yes, we could refuse to close on the house until we get an answer and I've thought of doing this. We didn't do a construction loan so they are financing the home (besides the down payment). I don't think this is a viable option though because we want the house.

    What they don't realize is word of mouth gets far and I'm a loud mouth so will tell everyone I know about my experience. It sucks you are going through this and I agree with cpartist - talk to a litigator. Sometimes the threat of lawyering up will make them magically find a more reasonable solution. Otherwise, you need to figure out if this is worth it for you. How much do you have in the home already? What does your contract say about backing out? Read it very carefully and know what you agreed to. I would definitely seek counsel on this.

  • 11 years ago

    As I mentioned yesterday, my wife and I met with our agent and her broker. I have been expressing multiple concerns to my agent, so she thought it would be a good idea to discuss those concerns with her broker, along with discussing the 20% premium issue.

    During the meeting, the broker indicated that they have been spending a lot of time on this issue, and they're continuing to do so until it's resolved. The broker seemed to be completely on my side, so I feel good about that.

    So the 3:00 meeting between my agent's broker and the seller's agent and/or broker must have made some progress. They have called a meeting with both agents and their brokers, the builder and us. The bad part is that the meeting isn't until Friday, but I really hope some final decisions will be made at or before that meeting.

    So at this point, I'm still waiting, but everyone is telling me that it's going to be resolved. We'll see.

  • 11 years ago

    I'm hopeful for you but, this is the exact tactic that has been used for us too. We did not have a buyers agent so it's just us trying to get answers but, we've been told multiple times "they are meeting with the owner, or the VP or this person or that". Hopefully the builder will actually care about you as a client. Is he a volume builder or a small builder. The volume builder will care less but probably has more financial backing to help pad a loss. The custom builder will likely care more but may have less financial backing to change.


    Good luck on your meeting, let us know how it goes.

  • 11 years ago

    Please let us know how it goes on Friday and if it's still not resolved, let them know you'll be talking to your lawyer. Then do it. That will have them finding a solution very quickly.

  • 11 years ago

    I am curious what the BIC has to say about them using an entirely incorrect contract for the new construction. Has this issue been brought up?

  • 11 years ago

    So was anything decided on Friday?


  • 11 years ago

    Yeah, something was decided. I begrudgingly accepted to pay 10% instead of 20%, and I'm still not happy with myself that I did that.

  • 11 years ago

    I guess 10% is better then nothing. How did you get the builder to offer that?

  • 11 years ago

    My realtor's broker asked them in the meeting if they would be willing to accept 10% instead of 20%. I don't think they liked it either, but they accepted it. I guess none of us are very happy with the outcome, but I guess paying 10% is better than 20%.


  • 11 years ago

    I would be worried because now when you ask for something, he's not going to feel the need to do his best work. So while you both gave a little, I worry that you're going to lose in the end.

  • 11 years ago

    So, what is going to happen about the other dozen of issues that are going to arise which are not addressed by the incorrect contract?

  • 11 years ago
    last modified: 11 years ago

    What nc said. For some reason you keep thinking you have a price problem. You have a grossly deficient contract problem. There are so many ways that your builder can screw you over, I would have walked into that meeting and begged to pay 30% if he signs a real contract. You have a contract that essentially surrenders all your rights after the sale, now you have gone and given the builder a reason to cut corners....well played.

    If you don't fix your contract then you deserve everything that is getting ready to happen to you. You are playing Russian roulette with five barrels loaded.

  • 11 years ago

    10% of what?


  • 11 years ago

    exactly what bry and nc said.