maucelil

Need help with contractor fee

11 years ago

Hi - We are remodeling a home that we purchased and have a question on contractor fees. We received a bid from our contractor with a 20% fee based on the total cost of work (approx $28k). However, in the total cost were significant allowances for appliances and cabinets. We were planning on handling the purchase and install of those items. When we told the contract that he said that was fine and would he remove them from the total, but it would not change his contractor fee. Does that seem right? Why should we pay him 20% on work that he isn't doing? I'm just wondering what's common practice in these situations before I discuss with him. Thanks for your help.

Comments (4)

  • 11 years ago
    last modified: 11 years ago

    We were planning on handling the purchase and install of those items.

    Is this occurring while the contractor is still on the job or after he's done and gone?

    The reason I ask is that if he's required to schedule his stuff around the stuff you're doing, then that can potentially be a huge hassle and liability issue and is therefore a justification for the fee. Lots of contractors wouldn't even take on a job where they aren't in control of everything from start to finish.

    Plus, his desire to do the job might be based on his total fee. If you take a chunk out of it, maybe he doesn't want the job anymore.

  • 11 years ago

    Yes, those things would be done while he is doing his work.

  • PRO
    11 years ago

    You're essentially removing him as the general contractor of the job if you hire individual trades specifically and remove the supervisory fee from the contract. That would leave you totally responsible for your subs that you hire, including the headaches and quality control. If your granite sub drops the slab on your new floors, and shatters the stone and breaks the floor, it would be your problem to work out about replacement slabs, replacement floors, and replacement labor.

    He has to coordinate the different trades around yours. He has to coordinate installation requirements with a third party that doesn't really report to him, or listen to him. That 20% says that he supervises those guys just like the ones he hires. What would give him real supervisory power would be if you asked him to use those contractors as his subs, and let him pay them instead of you. People listen to those that write them a check and not so much to those who don't.

  • 11 years ago
    last modified: 11 years ago

    If this is a lump sum bid, why would the fee not be a lump sum? A % of cost fee is normally used for a Cost of the Work contract. Mixing these contract provisions can lead to the dilemma you are asking about. Nevertheless, this separation of work should have been made clear in the bid documents and not been included in an allowance.

    The OP is only talking about appliances and cabinets. It's not unusual for these items to be provided by an owner and they would normally be removed from a fee calculation. The contractor might want to add a small fee for coordination of this work.