Bruce Crawford
5:48 PM
We're in the home stretch of our 2-yr. K reno that we've done in phases. Ph V, the hutch (left in pic of pantry area) is only partially complete. Our cabinet guy installed the base unit so our tile masons, artisans actually, could install Ph VI, the floor. The field is AZ Tile's new line, Suburb in Pinecrest. The border & baseboard are their Emperador Dark marble tile. The LR, entry & DR have same flooring. I took the pantry pic before floor was finished. In pic of sink wall backsplash, the 2 missing sticks of Sonoma Caspian moulding are now in place. Other pics show oven & fridge wall from pantry, sink wall from entry & the view from DR. Next is Ph VII, the windows, plus finishing hutch when cab guy done w/ his big project.