Software
Houzz Logo Print
heathmichael86

New Home Construction Incentives

11 years ago
last modified: 11 years ago

I am looking at buying a home with M/I Homes in Columbus, Ohio in one of their brand new communities (literally, still a field). We have priced a home with a max budget of $420,000. Their "grand opening offer" was $8,000 in free upgrades. They are also offering $4,000 towards closing costs if I used their preferred in-house lender (Yes, I will shop rates & total fees). This seems very low to me relative to the purchase price. Homes "start at" the low $300s, but realistically, most homes will be between $350-450k.

Why types of incentives have you seen for new home construction? What types of discounts can I ask for? I feel comfortable negotiating with them as I am fine walking away if the value doesn't seem right. Thanks for all your help!!!

Comments (19)

  • 11 years ago
    last modified: 11 years ago

    Word of advice based on unfortunate experience. If you plan on selling...ever...get the cheapest new thing or buy an existing used home less than 5 years old in the last place they built out. They will always keep finding fields to build on. Trying to compete with a new build is really difficult.

  • 11 years ago

    Excellent advice nightowl. I see it happening all the time in FL. The exception is if you're building in a small area of a downtown area where most of the land has already been built on, but when you're talking open fields, unless you plan on living their for the next 20+ years, listen to nightowl.

  • 11 years ago

    "Their "grand opening offer" was $8,000 in free upgrades."


    Yeah they will include screens for the windows or a lock on the front door as an "upgrade". Pure BS.............

  • 11 years ago

    Look at the company website to determine what they are offering in other areas. Also carefully read what they consider closing costs. They maybe excluding some things that would make it difficult to reach $4000 in costs or maybe underestimating things like tax escrows. Make sure they are not charging you for the owner's title insurance, if this is typically paid for by seller's in your area.


    We used a large builders lender years ago when we bought our first house. They were pretty straightforward about everything as it was an FHA loan, but you should just be aware of how the builder's preferred lender costs compare to other lenders.

  • 11 years ago

    As my builder said to me frankly, "Either way I need to make my profit".

    In one case, the homeowner was building a home for $600,000 and wanted to purchase all the fixtures, windows, etc themselves. The builder said, "that's fine as long as you give me the invoice so I can add my profit." The homeowners were incensed over the idea that the builder took a profit on those items.

    Then he mentioned that he had another customer who was building a 1.6 million dollar home and the homeowner asked to bring three fixtures of their own. As the builder said to me, "They worked through me for everything except those two items. I'm not going to charge them a profit on those two items. I'm making plenty already."


  • 11 years ago

    New construction is very tricky and very local as to what type of deals you can expect. Where I am from half the builders in my city will include lawyer fees. Rrah mentioned already to get them to discuss what that includes. Those closing costs being included is money in your pocket when compared to buying something used.

    As for promotions that price point of 350-420 is the hottest portion of my market and you won't see discounts larger than you mentioned unless its a horrible location, bad floor plan or a builders desperate to be finished in an area. In my area grand opening weekends don't typically translate into sales. Don't be offended if the builder refuses your offer. They have their limits that they won't go past and in a lot of cases the prices are non negotiable.

    With that said the reason they want to discount upgrades is because it gives them better margins.

  • 11 years ago

    Those allowance amounts are way too low. When you see the cheap stuff they want to put in you'll quickly upgrade to something at least a bit better. That $8000 will be gone in a flash. You usually have to figure 15% more for the finished home.

  • 11 years ago

    I think your confusing a custom build vs buying from a builder in a new community. $8000 could be gone quickly but if the builder already has a high standard spec than who knows. Without details you couldn't be positive. Regardless like I said every city will be different with discounts when it comes to new construction. In my area that would be a very reasonable discount on the home.

  • 11 years ago

    cpartist: The builder said, "that's fine as long as you give me the invoice so I can add my profit." Why does a builder need to make a profit on something that he didn't source, design, or help negotiate? I believe he should be paid fairly for installing the items and any design consultation he may have provided, but I don't understand the profit on top of purchase. I ran into similar when doing a remodel: I researched, negotiated, and purchased all the fixtures for 5 bathrooms and the kitchen. The builder said the plumber had to make a profit on the fixtures. What? I was paying him to install them because that's all he did. He didn't offer any design advice or discounts on the items if I sourced through him; in fact sourcing through him the price was higher. Why isn't paying him fairly for the work he actually did good enough?

    Sorry to get OT - but this is an issue the OP might face too.

  • 11 years ago

    Because chicago he is the one who is putting it into the house, and he is the one who will be responsible for it if something happens. He is the one telling the sub how to put it in, and then checking to make sure the work was done correctly. He makes a profit on the whole house.

    I am a full time artist. I sell through galleries. Galleries take 50%. Why? Did they spend weeks painting the picture? No, but they hopefully will spend a few minutes convincing a patron that my drawing is the best to buy. They will insure it while in their care, ship it back to me if I need it, hang it on their walls, turn the lights on so customers can come in. That allows me to spend the time painting more paintings. It's really no different.

    It's just like how everyone picks up a pencil and makes a drawing for the first time and then thinks they are an artist who can sell. Everyone seems to think they can be a GC and save themselves tons of money.

    That is how he makes his profit. He takes a percentage on every item that is put into the building.

    And in the case of the builder, most of the time he can get it cheaper.

    Additionally when he said that, he also said that if I stay within the allowance, there is no additional percentage. It only kicks in if I go over my allowance. So if my plumbing allowance is $10,000 and I decide to source it all myself and still come in under 10k, I'm fine because he's already built his profit in at the $10k mark. However if I spend 11k, then I have to pay a percentage on the amount I'm over or in the example, $1000. Why? Because he is taking a risk with a more expensive item.

  • 11 years ago

    I think you can negotiate anything you want before the contract is signed. We supplied the appliances outside of the contract to save the builders markup. Then we took responsibility for them and paid for installation. We did a couple other things like that. The $$ saved was ok but small potatoes compared with the whole.

    I think the problems come after the contract is signed. The numbers can be massaged in myriad ways during the process, but the builder has a certain amount they want to make and coming in after the fact and reducing it...the builder typically can't make that up on a different line item.

    Get a solid contract and specify everything.

  • 11 years ago

    Exactly.

  • 11 years ago

    In some ways, this is like buying a new car that loses value the minute you own it -- and more value once the 'new models' come out.

    "New" sells, even when it costs more than a home in an established neighborhood. Homeowners there aren't living with construction noise and dirt for years. The market for the 'old' home is set by other existing homes; when you sell, those are your competition, not a builder's new models. Existing homes usually come with improvements, like mature landscaping.

    I'm remembering the projects abandoned in the last recession. Early buyers were living amid tumbleweeds and half-constructed hulks left to rot. There's a reason for a builder to offer incentives. You're joining his risky venture.

  • 11 years ago

    Thanks for all the feedback. Really appreciate it!

  • 11 years ago

    We are currently building with a national builder in AZ and those seem fairly close to what we were offerred. $10,000.00 towards upgrades and $3,000.00 in closing costs thru preferred lender. We also received an additional $1,000.00 for having built with them on a previous home. The specs were pretty nice at base, especially the cabinets and granite counters, so in our situation the 10k was significant as we used it basicaly for structural options, like extending the garage, adding a garage service door, pre-plumbing for a future utility sink in garage, adding additional structured wiring and surround sound, and converting a flex space to an additional bedroom. All things that would be difficult to do post build. Good Luck!

  • 11 years ago

    I've seen incentives like free finished basement or finished bonus room with bath. $8K is peanuts in incentives, given the ridiculous mark-ups building use. My guess is that would barely cover one level of cabinet upgrade and one level of carpet/pad upgrade.


  • 11 years ago

    mary_md7,


    Maybe in our area... not in many, many other areas.

  • 11 years ago

    I work with an urban infill builder here in the Tampa Bay area - builds ones or twos or four, eight - biggest one is 15 homes. Very different from the "national" builders; not huge subdivisions with hundreds of homes, so not sure how it compares. Their business model is about the customer experience, areas that are up-and-coming (not the established areas that most cannot afford), quality programmed construction. By that I mean they build the homes typically in 120 days from permit to COO by following a phased program which means, for example, they are ordering the cabinets when the footer is poured so that they arrive on time to be installed - no waiting on materials.

    The base level home is much higher than the standard big builder base home. They build to a higher spec so that if they don't have a buyer by the time the home is completed, there is still a nice, semi-custom home for sale, not one where a buyer walks in and says, "this is nice, but...." There is a page in the contract which states all the base level features. Most of the homes have a landscaping package which is already included in the sale price.

    Also, we go over the things that are not included: refrigerator, ceiling fans (although they will pre-wire), coach lights (although they are pre-wired), towel rods, toilet paper holders, etc. It's mostly things that are highly personal and they just can't offer the huge selection that people want.

    We also offer a $5000 incentive for using the preferred lender. Using them is so much easier than other lenders that don't necessarily understand new construction, won't secure the rate for 120+ days, don't know when to order the appraisal, etc. It's well worth it for the builder because from what I've seen, all the outside lenders have been exceedingly difficult (these are mortgages, not construction loans). If the buyers find a better rate and terms, they usually can match it, but it rarely happens, to be honest.

    After the builders contract is ratified, the buyers make an appointment to the design center where they choose finishes. Depending on what stage the build is, they may have fewer and fewer choices, obviously. As the home is finishing each stage without a buyer, the designer is going in and spec-ing the home. So the home that is finishing next week, pretty much only add-ons such as blinds, garage door openers, maybe a fence. The upgrades are all pretty reasonable IMO. For example, it's about $2200 for all the blinds in a 2900+sf house installed. Cabinet upgrade in the kitchen only is about $2300. It's about $800 for interior paint colors (standard is white) in the same house. Wood flooring on the bottom floor is about $4500. $1800 to put in a frameless shower. I usually recommend that they hold off on stuff they can easily do later, such as a backsplash, lights, stuff like that, because it can add up very quickly when you see all the cool stuff that you can add to your new home - one couple recently accidentally added $25K in upgrades - sort of got carried away choosing the top end everything.

    The buyers get four inspections with the construction manager throughout the build. The best one is pre-drywall where you can take pictures of everything before the drywall covers it up. May come in handy 10 years from now when you want to remodel something. They have the typical 1-2-10 warranty.

    As the homes near completion without a buyer, the incentives are often increased. Right now we're adding $5000 generally to homes when they pass the drywall stage with no contract.

    Nearly all of our homes close with equity by the time they are completed, but that is partly because of the business model and where they are building. Their homes elevate the prices all around the neighborhood. Unfortunately, in at least one of the neighborhoods where they've been building for several years, this effect is starting to price out the very buyers that they were building for.

    So I hope this perspective helps you decide what to do. I'd be glad to answer any questions.