Contractors' Estimates: Which on do I choose?

10 years ago

I am in Bathroom Remodel hell. I initially interviewed 7 companies for our remodel - 1 design-build, 3 designers, and 3 contracting companies. For two full bathrooms, the estimates ranged from $50,000 - 90,000 (the design-build). In the end, we chose a company that was in the higher price because he made the softest sell, asked such important questions that no one else asked specific to our home, and had actually formulated a plan to minimize dust (we have plaster walls) and minimize impact so we could live there with our two small children. Also, I really like him and I like his work. However, after architect's drawings, our budget blew up to $96,000* for the two bathrooms (*represents a final price barring serious structural damage and does not include $20K of fixtures, vanities, tiles, etc.) My lender has asked me to get two new estimates because this one is too high. One came in at $55,000 ($40K less than my contractor). The second initial estimate was $65K but a more formal walk-through with a plumber and electrical is scheduled for this week and I believe it will go up to $75,000 at least. Each contractor has roughly about the same size company so why the huge discrepancies in estimates? How do I know which price is most accurate / honest / and represents the most quality work? I believe for our market and our house, going over $90,000 is really pushing resale value vs. value of our home in our market so what do I do?

Comments (3)

  • PRO
    10 years ago

    First off, you need to know the average price for a full bath renovation. That's a start. The next place to start is to find out the average price in your neighborhood for the same work. And remember: average price INCLUDES the $16K quick flip bathroom reno. And it also includes the $90K full swap reno with moving walls,etc.

    The US average price for a bathroom renovation = $30K. Your area MIGHT have a higher than average price for labor (as much as 60% of the costs) which drives the whole thing up-up-up.

    You have a quote on the table for 2 baths: $96K + $20K. That puts TWO baths into $116K (or roughly $58K each). The contractor you like had to bring in an architect! Wow. Lots of things happening? Moving walls? Moving plumbing? Moving electrical? Reinforcing subfloors? Support beams? Stuff that required an architect - that is some pretty serious renovation work going on.

    The quote you have is complete. That is your bench mark. It i probably the upper level...but still a bench mark. I would look at the person who offers a slightly better deal than the $96K...but don't get too cheap. If you have plenty going on, it means s/he is going to cheap out on the expensive stuff: like professional plumbers and electricians (in Canada an Red Seal Electrician bills out at $180/hour...if you can find one).

    I would say you need to look at the numbers that make sense...if ALL 7 of them come back in the $85K - $95K range...it means everyone is on the same page. You can THROW OUT the "low ball" bid of $65K. That person missed something. Like dust control and working around a family that is living "in home" during major construction. Or architectural oversight...or something expensive like that. Throw out the high-ball and the low ball bids. Then work with the people you like the most.

  • PRO
    10 years ago

    Agree BIG time with Cancork floor Inc., He put it right there! Throw out the high ball and low ball! The higher one can give great results but will get by and make the money. The lower bid on missed something or says he can do it but later find out probs down the road. The price you are mentioning are a high dollar home remodel. That is high for a bathroom remodel. You would have to have a million dollar valued home which would give the reason for the high bid. (Money here!) 30 thousand per bath gives a WOW to a home which most go 15 to 20 thousand.

    Ken

  • PRO
    10 years ago

    I guess the above is about as smart advice as you could receive; throw out the high and low.

    That said, those numbers just seem really high to me. Are they extremely large bathrooms? And are there lots of structural changes etc...?