Hi all,
Need some advice/ sanity check.
So have approval to start with site work on a lot in a very exclusive neighborhood on a vacant lot. There is one small catch- (there's always a catch)

I have permission to construct a 3000 SFH if I keep within less than 5000 ft of soil disturbance area in the lot- about 1 acre. The footprint is 1800 and driveway about 600ft


Theoretically it can be done based on the site engineers calcs. However I had someone play devils advocate and was kinda stumped to answer this nagging question:
While 1) digging up basement, where will I store the dirt? and

2) While building the house, where will I position materials unless i do a JIT schedule that sounds crazy.
(Any GC's or excavators who have done this, please offer your 2 cents)
So picture about 10 feet around the house footprint for this extra space and a 50 ft driveway that slopes down after about 20 feet.
How would this be done without hauling away dirt back n forth and materials.

Thanks

Comments (5)

  • 9 years ago
    last modified: 9 years ago

    While 1) digging up basement, where will I store the dirt?

    Unless you're planning to use it for landscaping hills, the excavator takes it away to wherever. There's always someone looking for "clean fill."If he has got a good eye, he will keep just enough to backfill. And maybe forego that, instead opting for freeflowing fill.

    Interesting restriction. But it sounds like adequate room to work.

    You bring in lumber in stages as needed only, trusses can go directly from delivery vehicle to the roof. Once the first floor is on, you now have additional storage space. Stack the masonry/siding neatly. I built houses with as little as one-three foot sideyards on tight city lots.

    I'm afraid too many diy have the mistaken idea that homebuilding has to be a messy, sloppy business with everything everywhere. (Not that you don't see those sites!)

    Warbro m thanked worthy
  • 9 years ago

    Thanks... thats feels reassuring that it has actually been done. The site engineer planned it that way, but the city inspector had me 2nd guessing when he threw me that curve ball. Yes, I guess most of the dirt will be hauled away and worst case, will just have to get 1 truckload if he estimates wrong.

    Nice to know builders can and do often work in such tight spaces!

    Thanks again!

  • 9 years ago

    if I keep within less than 5000 ft of soil disturbance area in the lot

    How do they define disturbance? If it's to protect tree roots, you have to keep reucks and such out of that area.

    Is a stack of bricks "disturbance"?

  • PRO
    9 years ago

    I'm a custom designer/builder and we've done this type of work. It's the kind of work that you hire an experienced contractor to perform.

  • 9 years ago
    last modified: 9 years ago

    We ran into a similar scenario. We kept as much dirt as we needed to backfill and do our final grade. We are on a wooded lot and the dirt had to be strategically placed to protect the tree roots. Our build site was impeccable. I credit our builder for being on top of his crew for this. The only real downside was it cost a lot of money to have the dirt hauled away. Fortunately our village allowed us to dump some in a vacant village owned area free of charge.

    We had to follow all kinds of disturbance rules in our neighborhood. One day our workers started on site at 7:45 am and the police were called. We have a noise ordinance from 8am-8pm.