Software
Houzz Logo Print
hannahelizabeth05

Advice needed for an unfinished basement


Hello all! My husband and I bought a fixer upper in a less than desirable area-i.e. we realize it is likely that we will not get our money back. However, we do plan on staying in the home for the next 3-5 years. We have a pretty large yet low-ceiling basement that we would like to make functional (and pretty). We do not want to finish it completely due to not getting the money back for it. My questions are as follows:

A-Do we paint the ceiling and give it an "industrial feel" or leave it alone? If so, should we go with a lighter color to keep it from feeling closed in or should we go with a darker color to make it all blend together?

B-What do we do about the floors?!!! The basement is predominately dry (we had some water issues that I believe we have taken care of). Yet, I still want to make sure that we get as close to waterproof flooring as we can without breaking the bank. The basement has a drain in the center so I would think that it has some slope as well.


Please disregard the mess, it has been our holding chamber since we moved in.


Thank you in advance!

Comments (14)