Software
Houzz Logo Print
andrea_reo80

Bathroom floor tile - sticking up

8 years ago
last modified: 8 years ago

Hello friendly advice givers. This is my first bathroom Reno ever, there seem to be some corners of the large format tiles sticking up. I see some in the shower walls, which dont bother me too much, but I’m wondering if I should make a fuss about this one floor tile.

Sadly, it’s the second tile in from the doorway, and right in front, I feel like it’s a sharp corner sticking up too much. If it were in the back I wouldn’t mind. I feel like the rest of the floor looks great, and then this...

The first pic is a close up of said tile. The second pic is an overall view. And the third, you can see the tile in the bottom left corner.

Am I being too picky? Advice? Please help!!

should I mention it to the contractor?

Thanks






Comments (37)

  • PRO
    8 years ago

    It is called "lippage" and yes you should mention it. It could be a warped tile , and it could be simple error. Call him back. Overall, it looks nice. Get the obvious fixed. Check that he used the prescribed spacing for your tile as well.

  • 8 years ago

    Thank you, I appreciate the feedback!

    I agree that overall it looks nice, this one tile is just a bit of a sharp corner sticking up. I will mention it.

    I believe he used 1/4 inch spacing. It’s pretty large.

  • PRO
    8 years ago

    Again....... what was the recommended spacing?That is not to be ignored.

    Andrea Reo thanked JAN MOYER
  • PRO
    8 years ago

    Make sure the contractor addresses the ones in the shower too. It's better to get them fixed now rather than wait.

    Andrea Reo thanked Sina Sadeddin Architectural Design
  • 8 years ago

    When you see stuff like this it makes one wonder what else they are trying to pass over on you. Whats underneath the mess?

  • 8 years ago
    last modified: 8 years ago

    Right? Well I thought thy were taking up the peel and stick tile that was there, but it looks like they just put the backer board on top! Huh? Idk... I’m not an expert but seems odd to me.

  • 8 years ago

    Looks like the recommended grout line is 3/16. I’ll have to measure it when I get home. I mentioned it to the contractor.... he said he’d look at it. Haven’t heard back yet.

  • 8 years ago
    last modified: 8 years ago

    are you laughing along or infuriated? there is absolutly noexception to covering peel and stick with backerboard on a tile install. ZERO. you are getting skee-roood but im guessing you took a chance on a song and didnt take the time or have the budget to hire A tile professional. Thats a tuff town

    Andrea Reo thanked User
  • 8 years ago

    I just was looking at the leveling systems, and wow, they look great! I think I might ask about it for my master bathroom.

  • 8 years ago
    last modified: 8 years ago

    Well, I suppose I’m inexperienced in this - as this is my first project like this ever. I was annoyed when I discovered that they put backer board on top of the flooring which I thought they were going to take down to the subfloor. I don’t know what to do now....

  • 8 years ago
    last modified: 8 years ago

    fire them. Stop payment unless you have a binding contract. Your floor will fail sooner than later and youll be sadder than than you are now. To be clear there is no TCNA or industyry approved NOR advised way to bond backerboard over a peel and stick not possible. No approved specification for tile over peel and stick covered w/backer. You have a mountain to stand on if you choose to fire them.

    A proper Wood structured floor build up IS

    Sound joist system , "Underlayment" of either 5/8" or 3/4" ply, second layer is Ply "subfloo"r to achieve deflection rating and then either a membrane or backer board. All of which has very specific paramaters of meeting proper installaion and very particular types of plywood. In rare cases we can get away with one layer 3/4" ply. RARE.

    Andrea Reo thanked User
  • 8 years ago

    I will take a pic of what’s under there, and get back to you. I believe it’s a large format peel and stick that was on the floor before. I thought they were going to do it right, I was shocked when I got down on my knees and looked under the backer board, and discovered they did not actually remove the tile or whatever it was that was there. Shocked. But again. I didn’t know better.

  • 8 years ago

    Always tons of fun to learn these things the hard way, huh? I would stop everything, gather your evidence and information and look at your contract.

    It's so sad that we have to remodel "defensively"...that said, now you know. Don't beat yourself up about it. Ask questions, learn and put one foot in front of the other...

    Andrea Reo thanked User
  • 8 years ago
    last modified: 8 years ago

    "It's so sad that we have to remodel "defensively".

    Nobody should have to. The trick is in hiring smart and doing a lot of homework (not on this forum typically) and not engaging in projects if you find they are too expensive to do them PROFESSIONALLY and sourcing information in the right place like going straight to the industry standards/sources.TCNA for tile.

    Op said as much she or he is newbie and its a kick in the teef for sure. No pictures needed OP. jobs junk.


  • 8 years ago

    Yes. It is a kick in the teeth. I went in there tonight for the first time. It’s worse than I thought. I also peeled back the tape they had covering what they had done...

    I know you said you didn’t need pics, but here they are. I’m going to have to tell them tomorrow.

  • 8 years ago

    the next hurdle.?

    You arent happy and want it redone and they are given A stab at round 2 thats the classic GW/houzz drama right there BAM round two is always a poo poo. OK not always, perhaps 80%

  • 8 years ago

    Well, that’s encouraging. Lol

    so just fire them??

  • 8 years ago
    last modified: 8 years ago

    I cant answer that question without meeting them knowing every detail of your agreement and budget, locale etc. who can . You came here with woes of quality and i know you have been advised correctly. Movng fwd is your call.

  • 8 years ago
    last modified: 8 years ago

    no grout should go in the joints of walls (where two walls meet in the corners) or where the shower floor meets the wall. all of those joints should be done w/100% silicone caulk. the walls move slightly, different from each other. if there is grout in the joint, it will eventually crack and pull from the tile. Plus, grout is not waterproof. The vertical and horizontal meeting joints should be caulked w/the silicone after digging out that grout.

    Andrea Reo thanked Beth H. :
  • 8 years ago
    last modified: 8 years ago

    Thank you for the helpful tips Beth! I mean... the tile is already not fully attached to the grout as it is. Where the tub meets the tile. I don’t want to have this discussion today.

  • 8 years ago

    How about today ?

  • 8 years ago

    It’s a gut. Whether you want to face that truth or not.

  • 8 years ago

    They gutted it... the tile guy showed me where the walls weren’t plumb. He told me they will do it right this time. We’ll see.

  • 8 years ago

    how do you feel today!

  • 8 years ago
    last modified: 8 years ago

    Now that you are gutting out the tiles, I figured I would chime in. Your tiles look like the ones from Home Depot. They look like the ones I used to tile my bathroom floor and I had some issues with small cracks. All my tiles were leveled out just fine though. I think maybe they are just manufactured with poor quality control. I didn’t notice the cracks until a few months after the tile work was done. And since they were manufactured this way and I chose to buy the tiles from HD, it is on me. It will cost me more money in labor to replace them so I haven’t. I went back to HD and was told the crack in the baked finish does happen from the manufacturer and if I find my tiles have cracks, don’t install and then I can bring it back to HD and return. But too bad mine are already installed. I didn’t imagine that when I bought boxes and boxes of tile that I would need to evaluate each and every tile before the contractor installs. Here is a photo of what the crack in the baked finish looks like. I have three tiles like this total. Hope that helps you going forward.

  • 8 years ago

    I feel annoyed that I had to go through all of this. I had enough stuff going on, and to loose my bathroom like this for 2 months is ridiculous. I’m frustrated, and pissed, and doubtful that they’ll do a much better job this time around....


    thanks for sharing the cracked tiles. I didn’t see any of that. I’m not changing them now either. But I appreciate the share, and I’m sorry that happened to you.

  • 8 years ago

    Can someone tell me please... is this acceptable?? This is the tub line....

    is there supposed to be a 1/4 inch gap?

  • 8 years ago
    last modified: 8 years ago

    yes,,,but is there any plastic behind that board?

    when he lays the tile, the tile should come down, over the flange.

    I sure hope those screws/holes aren't protruding. going to be hard to lay tile flat on top of those. run your finger over them and make sure they're smooth/flat.

  • 8 years ago

    THEY had only 2 pieces of backer board up yesterday, and I did not see any plastic sheeting behind it...

    I will check the screws... womp womp.

  • 8 years ago
    last modified: 8 years ago

    You don't want plastic sheeting behind there! They redguarded it that's waterproofing! Look up mold sandwich and Google redguard

    Andrea Reo thanked Elizabeth B
  • 8 years ago
    last modified: 8 years ago

    And yes there should be a gap between backerboard and tub. Tile then covers that gap for the most part then silicone caulking goes under tile to prevent water from getting back there and wicking up the backerboard

  • 8 years ago

    not seeing tape and thinset in the corner redgard doesnt count

  • 8 years ago

    that's fine if there's no plastic. you don't need the vapor barrier.

    do you know if the seams were taped and had thinset applied before they did the Redgard??

  • 8 years ago

    In one corner I saw a mesh tape, but no thinset.. the mesh tape is coming up on one of the corners... it looks like they applied extra reguardnto that corner to try to get the tape down.

  • 8 years ago

    Not the best pics of the 2 corners... but I think you can see the tape on one of them...


  • 8 years ago
    last modified: 8 years ago

    Youve had enough advice ! good luck in the year to come