juneega

finishing garage how much is too much

8 years ago
Ok so we finally decided to get our garage finished with insulation drywall and to smooth and paint. My husband is doing all the rewiring and light installation and we hired someone to drywall 3 walls and half a ceiling. There was some reframing done to make out a loft area for extra storage as well. The guys are charging $4500 for the insulation, drywalling and finish to paint. They bought most materials other than lumber and paint. Do you think $4500 is a fair price for 2 man to do for 2 weeks? I thought it was too much but maybe I’m wrong.

Comments (12)

  • 8 years ago
    Bump
  • 8 years ago

    That’s about $200 per man, per day. I assume they are skilled, so, sounds about right, but would depend where you live. If they did a good job, I’d be happy to pay it. It sounds like your garage is much nicer and more functional.

  • 8 years ago

    I thought it was too much

    Then why didn't you get a second bid?

  • 8 years ago
    I did get 3 bids but the other guy was $5k and the one guy was $4k. This guy originally quoted us $3800 and then asked us for $700 extra after he already started the job which we were ok with but then he also ended up keeping one original wall( not drywalling it, just plaster on top of original wall). Anyway, we agreed on the extra $700 just to get it over with but thought it was too much considering he ended up with less work than we planned on doing.
  • 8 years ago
    last modified: 8 years ago

    This guy sounds shady. What does your contract say? You both should be sticking to it. The contractor for what work is to be completed, and you for what to pay. Any changes need to be re-agreed upon with an adendum. Looks like you chose the cheapest bid (perhaps other reasons besides price), and it seems you might have gotten the shadiest guy because of it. It sounds like $4k to 5k is the going rate for your area, so the price for the full work to be done sounds reasonable. Since he didnt do the job as discussed, he doesnt get paid until its done to the contract. Or fire him and get someone else to fix it. He took you, starting by not bidding the job correctly, and then raising his price. If there was no contract, he took you there too.

  • 8 years ago

    After supplying materials and covering their overhead costs, these guys aren't getting rich.

  • 8 years ago
    last modified: 8 years ago

    Looking at that picture, looks like the guy with the chop saw is Mexican, and I can see a Mexican child on the ladder (left hand side of picture). I doubt there's any written contract. I can't imagine a child on the job-site, and the liability if that kid gets hurt.

  • 8 years ago

    WTH Geoffrey??????

  • 8 years ago
    last modified: 8 years ago

    I'm in SoCal, too, and that was just a bizarre comment. You cannot possibly know or have any idea if a person of color is Mexican or anything else. There are people of all colors around here who are licensed AND unlicensed. I won't call people (or you) names, because it's not nice. But saying things like what you said *seems* like it's meant to insult and hurt others. We don't need to do that.

  • 8 years ago
    Ceilings should be hung before walls.
  • 8 years ago

    drywall in my area is 25/sq ft finished.