Software
Houzz Logo Print
bonsterone

Need someone to explain

8 years ago

We are building a bar with a sink, an undercounter glasswasher and an undercounter fridge. The plans are in place as to where these appliances are to go, and the plumbers and electricians are scheduled to come in next week. My contractor is requesting that I provide the specs of the exact model of dw and fridge I'm going to purchase to him by tomorrow, so he can consult the cabinet-maker BEFORE the plumbing and electrical is done. If the locations are set for the pipes and hookups, why is it necessary to consult the cabinet maker before the plumbers and electricians can work? Can't cabinets be built around existing plumbing?

Comments (12)

  • 8 years ago

    The contractor has their name on the project. Depending how busy they are, they might want to have the holes drilled/cut before arriving so they don't have to clean up sawdust. It might seem a usual part of construction until a grouch is looking for anyone and everyone to give bad yelp reviews. Sawdust is like glitter and sand from the beach. It'll be found days/weeks after.

    The other thing is maintenance access. If another contractor/plumber shows up to fix your dishwasher , difficulty to access its parts might lead to questioning ' who did this work". It reputation and fit-and-finish details; soo I'd get to finding that info.

    bonsterone thanked Mikki Bench
  • 8 years ago

    Why didn't you ask your contractor these questions? If you don't trust him/her maybe s/he's not the right person for the job.

    bonsterone thanked sheloveslayouts
  • 8 years ago

    Perhaps he wants to provide the dimensions to the cabinet maker.

    bonsterone thanked User
  • 8 years ago

    We had a custom vanity built for a bathroom remodel. It was constructed and finished offsite. I don't see the harm. All the pieces need to fit perfectly.

    bonsterone thanked tdemonti
  • PRO
    8 years ago
    Your contractor is taking steps to avoid future issues. Most likely your appliance choices will fit in the design you have confirmed without issue, however if for some reason your choices differ from those design elements then your contractor has avoided a tremendous headache. This falls under the good practices category. Even if your were given short notice, it's much better than no notice.

    Good luck with your project.
    bonsterone thanked Tri-County Lumber
  • 8 years ago
    last modified: 8 years ago

    You can’t cram appliances next to each other like birds on a wire. There have to be cabinet panels and fillers between them (or actual cabinets) to support the countertop. That affects spacing. You cannot do any of this without a completed master plan that allows for everything needed for cabinets, counters, appliances, and clearance requirements for traffic, ventilation, and electrical and plumbing placement. It all has to be on the documented design plan. Or you end up with expensive mistakes.

    Who is creating the design plan for you here? Do you have a designer involved to provide elevations and a floor plan?

    bonsterone thanked User
  • 8 years ago

    I think that asking you these questions shows the contractor is thorough. For the reasons people said above, and also avoids any miscommunications re gas vs electric, etc. I chose all appliances but didn’t but any until the contractor and cabinet guy had both reviewed. Resulted in everything going smoothly!

    bonsterone thanked Sue 430
  • 8 years ago

    Thanks everyone for your answers. I gave the contractor the specs when he asked for them, I was just curious why the exact model specs had to be used, when most of the undercounter appliance sizes are more or less standard. If they use EXACT specs, down to like fractions of an inch, doesn't that mean that if an appliance needs to be replaced later, it'll have to be replaced with another one of the exact same specs?

  • 8 years ago

    benjesbride, it's an unusual situation. There's a small group of us, and I don't have direct contact with the contractor. None of the rest of the group were able to answer my question, so I asked you folks. Houzz is a great place to find answers!

  • 8 years ago

    It's not that they will size opening down to 1/16th inch, but that they want to ensure there is nothing unusual about the install requirements that would potentially require modifications to cabinetry. Appliance size is not the only thing they have to look for - location/type of electrical connections, support structure, etc is also important.

    bonsterone thanked User
  • 8 years ago
    Well, I do know that there are different configurations for wine fridges - some are much narrower but taller than the one we got, and some can't be fitted under countertops at all. Dishwashers can differ as well. And even though euro style front load washing machines are fairly standard, we had problems with that as well - it didn't fit under the counter either - builder goof, again (and he was actually a very good builder, but slip ups happen). Fortunately for us, Miele makes a steel plate that allows you to take the top off a Miele washer and replace it with the plate, reducing height by about 3/4" - just enough! Moral of the story: contractors cannot have too much info about specs!
    bonsterone thanked jmm1837