Software
Houzz Logo Print
dabjg

should there be something between floor and door trim

7 years ago
I was wiping up a spill and noticed the bottom of our door trim.
Is this the way it should look? I know where there is tile they have caulked the ends of trim to flooring. What do you do in this instance ? This looks so sloppy.

Comments (12)

  • PRO
    7 years ago

    It should be the door jamb and casing... They undercut the jambs a bit to high to fit the flooring under. I guess this flooring was installed later on... because in new construction if its a pre-finished flooring the doors and casing will be raised the floor thickness... and if the flooring to be stained at the end of the construction the flooring will be installed first and the doors, casing and base will be installed on top of it this way nothing is being undercut.

    You can caulk to fill the gap but most likely it will look worst because the floor and doors are constantly expending and contracting, so leave it as it.

    Good luck

  • 7 years ago
    last modified: 7 years ago

    We have the same thing after getting new hardwood installed. The casing was undercut a little too high. I was going to try to fill it with something but like the previous poster said, I think it would look worse. What will help is touching up the paint to cover any splintering from the under cutter. This is ours...




    Same spot, different angle.

    Once the shoe molding was on and the paint touched up I decided it was bearable, and I think yours is too!

  • 7 years ago
    Ok - thank you
  • 7 years ago

    You need plinth blocks. They are the magic pieces of trim that visually complete the intersection of baseboard and door casings and I swear it's like they're some sort of lost art or something because no one does them anymore.


    Here's one of my (very Victorian and very scuffed up) plinth blocks:



  • 7 years ago

    ditto what GN said......

  • 7 years ago

    Great idea. But plinth blocks on just a couple of corners may look out of place.

  • 7 years ago

    Then put plinth blocks on all the doorways (what should have been done in the first place).

  • 7 years ago

    My dd did a remodel in her kitchen. She had an ugly pink ceramic that was much higher than her family room hardwood (Right). The skilled tile layer installed the new tile making it flush with the hardwood which left a gap under 3 door jambs. The contractor dropped the door jambs and there is no gap between the tile and the bottom of the jamb. Why couldn’t they do that here? This is the tile and you can see if you zoom in that there is a large gap under that jamb, before it was lowered.



  • 7 years ago
    I don’t know. We had 2 different contractors. The first one installed doors (frame, trim ) and the floors were installed about 5 months later by a different contractor.
    All of our first floor had 4ft of walls(drywall , insulation , doors ) torn down and then replaced . Not sure if that made a difference.
    Our last contractor never checked on work being done. If we didn’t catch something or know about something- then it would not be addressed .

    I just happen to notice the doors as I was wiping something up.

    We also just noticed this - which I know is an easy fix but it is so irritating.
  • 7 years ago

    That is irritating. I’m sorry for your frustration.


    we just finished building. Our trim, doors, etc were installed after the floors.

  • PRO
    7 years ago

    Dabjg, just get the adjustable pipe trim and it will cover that hole. They should have put this from get go, around here this would never pass plumbing inspection.