Software
Houzz Logo Print
esand323

Trouble leveling paver base

7 years ago
last modified: 7 years ago

Hi,

I'm building a 440 sqft paver patio in my backyard. We dug 7" (4" gravel, 1" sand, 2" pavers) down. For the gravel, we are using #53 crushed limestone as recommended by multiple contractors and stores here in the midwest. We started by excavating the area but a few areas were dug a bit to deep. So the ground isn't completely level. We were told this was okay, and to not fill in with dirt, but to instead just add more gravel.

After excavating, we laid out our string lines 7" above grade with a 1/2" slope every 4'. We then began spreading gravel and measuring down 3" from the string to get our 4" base as close to the correct height as we could. This proved to be a lot harder than we expected. When we finished compacting with a plate compactor, the area looked pretty level and does have a slope to it (although it is a little less than 1/2" every 4' which is slightly concerning). It's not completely level though and there are a few small dips here and there. I can fill in some of the dips, but I don't think we are going to get it as leveled as it should be. Is there anything we can or should do at this point? Every DIY video made the gravel leveling seem very easy and simple, but I'm not sure why we struggled with it. I thought about screeding the gravel, similar to how you screed the sand, but with our dirt not being leveled very well, it wouldn't be possible (which the dirt not being leveled is perhaps our biggest issue). Majority of the videos and guides I watched, they just spread the gravel with a rake and it seems to come out perfectly.

I'm including a few pictures (ignore the tarps, we decided to tarp because of all the rain the midwest has been getting). I'm not sure they really show the imperfections in the gravel though.

https://imgur.com/UiXUBFn 1

https://imgur.com/a/ohEwZgD 2

Comments (3)