Software
Houzz Logo Print
virginia_linesprodanova

Tile floor and backsplash underlayment or backer

6 years ago
last modified: 6 years ago

Hello. I'm installing porcelain on my kitchen floor and a white, subway ceramic backsplash in my mid-century bungalow. I haven't had tile here before as floors are wood, except for the bath. I had a large, kitchen fire, so needed to replace the kitchen, but these are the last things.

So, to my questions- and thanks in advance for your advice.

Is there any way to install tiles for somewhat easy removal in the future? Tastes change and mine surely does. Durarock is already installed for the floor but there is room for an 8th or quarter inch of something between that and the tile if I find something suitable. I am especially cautious about the removal because minor mistakes were made installing the first, small section of subway tile backsplash and we weren't able to remove it without doing a bit of damage that needs repair. That was after just 24 hours and without grout.

I'd like to install something between the tile and surfaces I'm tiling on, just nail or screw down some membrane or thin wood backer or something. I have seen it said that showrooms often lay tile in thin set over tar paper or wall paper. Anyone have eperience or suggestions in this area? Thanks in advance for your two cents.

Comments (3)

  • 6 years ago

    Tile is meant for a lifetime installation. If you want something less permanent, don’t install tile. Install floating vinyl or laminate.

  • 6 years ago

    Live wire is on to something here. Tile is supposed to be 20+ years of service. That's why you pay SOOOO MUCH for install. It is one of the most expensive products to install. It is labour intensive and material intensive. After paying $10+ per square foot for labour, you do not want to replace this anytime soon.


    Same thing for hardwood. Once a solid hardwood is installed and site finished (and you paid $15+ per square foot to do this) you do NOT want to remove it in the next 60 years.


    The longevity of tile is what you are paying for. Because tile can easily run 20+ years without an issue (assuming your subfloor is thick enough...BTW cement board does NOTHING to help with deflection rating...it is just something smooth to lay tile down on).


    So why would anyone voluntarily cause another $15-$20/sf installation of materials inside of 20 years if they didn't have to? Which begs the question, why install tile in the first place if you know, in your heart, you want another floor in 5-7 years?


    Tile is permanent. It is meant to take ++++effort and cause +++ damage when removed. That's the sign of a GREAT install. The harder it is to remove, the better the original work. That's why Saltillo and Terracotta tiles are SOOOO tough to remove. The CEMENT they use to lay the tiles is almost impossible to remove. And that's why they are so expensive to install. These handmade natural tiles such as Saltillo and Terracotta (and clay tiles in England) are LIFE-TIME floors. That is to say they will survive the death of several owners. In some settings they are hundreds of years old (ahem...some medieval churches in England have their ORIGINAL clay tiled floors). Those floors are INTENSELY expensive to replicate.

  • PRO
    6 years ago
    last modified: 6 years ago

    Question. How long should a properly installed tile installation last?

    Answer. The life of the structure.

    Agree with L_W_O and SJ as to the thought process based on our past experience & knowledge.

    To take a step out of the box and focus on the OP"s scenario. There is a way to achieve their goal. Deflection & flatness requirements must be followed.

    https://www.youtube.com/watch?v=pUNEWAtvd-4

    https://www.ardexamericas.com/product/ardex-ui-720-flexbone/

    Yes it goes against everything we have practiced over the years. I have seen it successfully installed multiple times.

    A concern from OP"s statement about Durarock is installed and they wish to be able to change floors down the road. If that cement board is installed as required by being set in mortar you won't be changing things out easily. If it's not set in mortar you have a failure already and need to change out the contractor.