Software
Houzz Logo Print
belvederefarm

Remodel fatigue

6 years ago

Anybody have remodel fatigue? Our counters were supposed to be here this week. Now they’re saying not until January! We have been waiting since end of October. I just want to be done!! Can’t wait to have our house back lol.


Comments (24)

  • PRO
    6 years ago

    Remodel fatigue is a real thing and projects that take north of 2 months tend to cause fatigue for homeowners. There are a few things you can do to expedite the remodeling process.


    1. Hire a professional

    When you hire a professional, they are as committed to finishing your project as you are. They will work hard if the price is right.


    2. Plan accordingly

    If you hired a licensed general contractor, the materials should have been ordered before demo took place. If you are using well-known manufacture, having expedited shipping on countertop should be a breeze. Once you begin demo, the material should be shipped and once you are done demo the materials would arrive for installation.


    You can always remove a contractor and replace them with another contractor that is willing and able to do your project quickly. The contract also matters too, so pay attention to the details.

  • 6 years ago

    Yes, I totally get remodel fatigue. We started our remodel in February! I just want to be done too.

    Belvedere thanked vannjk
  • 6 years ago

    YES. If we could just get the drywall in, I would be thrilled. But my husband has been installing electrical outlets at a rate of about 2 per week, so we'll likely be done around.... 2021?

    Belvedere thanked jslazart
  • 6 years ago

    @Novel Remodeling our contractor is great! The countertop place we are using have stores all over the country. Unfortunately they have been terrible to work with, but we can’t get the product we want through anyone else.

  • 6 years ago

    @vannjk i shouldn’t complain, we started in September.

  • 6 years ago

    @jslazart haha I get it!! I keep saying if we could just....

  • PRO
    6 years ago

    I currently have fifteen remodels/new construction in production. I am also fatigued. Hang in there!

    Belvedere thanked Kristin Petro Interiors, Inc.
  • 6 years ago
    last modified: 6 years ago

    MInimizing down time is where DIY has an edge.
    I went a total of one night without a kitchen sink, and one day without counters.

    Belvedere thanked THOR, Son of ODIN
  • 6 years ago

    We’re right at 2 months and I am oddly both in “I don’t care anymore” mode and slightly sad that it’s coming to an end! This is our second condo and the first time we get to really do things the way we want, and I’ll definitely miss the magic of seeing it all slowly coming together.

    Belvedere thanked recordaras
  • 6 years ago

    I'm only in week two of a kitchen renovation but it's DIY with my father staying with us during the project. The kitchen is in a comical state but so far everything we need accessible to cook is accessible, even if they're in silly places. Plus, we were able to go out of town--at his request to make it easier on us/him--during the floor demo, which I would never have done if was anyone but my own father. That saved a lot of headaches.


    But I know the fatigue will probably set in somewhat eventually. For me the part that's going to get old is the fact that I also work from home and my office is adjacent to the kitchen (and our house small enough there's frankly nowhere to relocate to that makes any sense or wouldn't be annoying in other ways).... plus we have a live-in guest while this all goes on, to cook for and clean up after. There's no escaping.


    Good luck with everything! I'll remember this thread later down the line if I really start to tire of things. Hoping it'll be more of a feeling of excitement to see it coming together more than anything... we'll see. ;)

    Belvedere thanked T
  • 6 years ago

    It’s exciting, but also tiring lol. We moved in September and immediately started remodel. We live upstairs I have a 6 year old and a 7 month old. Things take longer than expected especially when mistakes are made! Working On staying positive, because I know we will eventually get there! Towards the end decision making does get hard, so many decisions to make!! Amidst it all I got bit by a poisonous spider, and couldn’t do much. So that was fun lol. Things like this are always more fun to look back on, but in the moment not so much. Haha

    Good luck on Your projects everyone. It doesn’t last forever thankfully

  • PRO
    6 years ago

    I have "remodel fatigue" from my NEIGHBOR's massive re-model that has been going on now for 9 months! They were promised 5-6 months - it's still not totally finished and I'm sick to death of the daily stream of trucks parked at the end of my driveway, making getting my car out difficult. They also park in my own pull-off in front. The entire neighborhood is sick of this remodeling job.

  • 6 years ago

    I have remodel/building fatigue ... and I haven't even started building yet!

    Belvedere thanked chispa
  • 6 years ago

    I can relate! We ripped out our kitchen in early May... and just finished the remodel last week! Seven months is a long time to go without a kitchen, but I'd do it over again (hopefully with fewer delays).

    Belvedere thanked T B
  • PRO
    6 years ago

    Remodel fatigue is a residential problem.


    When General Motors hires you to bust up the concrete, install and calibrate the front end alignment machines over a two-week Christmas shut down, you damn well better have it done on time. They'll take your children hostage before they'll lay off 2,000 people.


    Chase can turn a used car lot into a state-of-the-art bank in 90 days. I saw it with my own eyes.


    You are a peasant. Nothing bad will happen to your contractor. You will wait.

  • 6 years ago
    last modified: 6 years ago

    Totally feel you! We are into 7 mos of camping in our home. Much is completed, but we still have a pit for bathroom shower. Started in May and kitchen cabinets going in today. They were to "match" island we kept from the before kitchen. Match, they do not. So frustrating. Appliance people are wanting to complete and deliver and we have not shopped countertops. Oh well...We are in the mode of so-what. I may paint uppers cabinets. Even without the island they are so mis matchy...however well made. Just not digging the grain. Keeping calm and loving hubby through it. It is stressful for us both and we keep telling ourselved to focus on our little victories. I am sure everything is magnified to us at this point, everyone who visits are oblivious to the small things that are so huge to us. Promising to hold hands through this and remain nice people. :)

    Belvedere thanked vgrimm
  • 6 years ago

    I didn't go through having an unusable kitchen, but we definitely went through remodel fatigue when we finished our basement last year. We had to move 16 years worth of stuff from our basement to our dining room and garage. I couldn't believe how much we had accumulated in that time. I also was surprised at the fact that even though it was the basement that had the work done that the rest of the house was affected so much. Things like having the water turned off (no doing laundry on my day off) to having the electricity go on and off, to having the HVAC on and off and the constant people coming in and out the front door. We had started right after Labor Day, was supposed to be done by Thanksgiving, but weren't until 2 days before Christmas. I did love being able to pick out everything; of course the choices would have been different had I not had to take the opinions of my family members into consideration too :)


    I want to remodel my kids' bathroom and my husband is in no hurry. He still thinks about the mess from the basement and how long it actually took to go through everything and move it back downstairs (literally months after the contractors were finished). I had new countertops and backsplash installed earlier this year and my husband vividly remembers that mess and reminds me how much mess there is removing tile. I keep telling him we will be so happy with the result at the end, but sometimes it is hard to see that, especially when the previous construction mess is still fresh in his mind. Maybe this coming year :)

    Belvedere thanked chocolatebunny123
  • 6 years ago

    Yes, We have major remodel fatigue. Started in August on the kitchen-laundry-bar-powder project. Expect it will take ’til January 31. And that isn’t the ‘decorating’ part of it. I had forgotten how long kitchens take. I had tried to order everything in advance to speed things up. So much for that.


    Serious ‘irritation‘ is setting in, even though our contractor is diligent and thoughtful. He even offered to have his team put up our Christmas tree on Christmas eve (First he will have to move stacked up furniture to make space for one. ). Fortunately in 2018 we went through a complete remodel of our lower level so we have a nice place to camp. But still it’s a long time.


    I remember when I was a girl my parents, who had nine children living at home, went through a big kitchen and family room remodel. My mother cooked and fed us in the unfinished basement. I don’t know how she did the babies’ laundry or made the formula. When I think of that I’ve got nothing to complain about!

    Belvedere thanked J Inhof
  • 6 years ago

    I hear you... we are 4 months into a complete rebuild, living in a trailer on the property with our 2 dogs :-). And we’ve got a ways to go.... It’s a bit cozy but easier in a lot of ways than a previous remodel where we lived in the house during the project. No having to clean up the construction dust before going to sleep (or not as much of it!) and no doing dishes in the shower/tub...

    Belvedere thanked D Walker
  • 6 years ago

    OMG, @Anglophilia, our neighbors have been at 1+ year with an extensive remodel with no end in sight. I feel your pain, girl! The constant stream of trucks, materials, etc... they should have just built new.


    To the OP... remodel fatigue is rough. I felt it most towards the middle of the project when our kitchen table was in our family room, and cabinets were still strewn about. Even with a KD and GC on sight, there were still delays and mishaps along the way. We do not have the time or knowledge to DIY so that was out of the question. Once we were able to move our table back to the kitchen and our fridge and micro were installed and working, I felt so much better. Hang in there, it will all be over soon!

    Belvedere thanked megs1030
  • PRO
    6 years ago
    last modified: 6 years ago

    This is why I love the sink replacement business. One day and done, no fatigue:





    Belvedere thanked Joseph Corlett, LLC
  • 6 years ago
    last modified: 6 years ago

    Counters are in!!! Painting is almost done, now for the finish work. Soon I can unpack and move in!



  • 6 years ago

    Congratulations! It looks fantastic in there.