Software
Houzz Logo Print
frank_ca2020

Basement insulation with drainage pipe on concrete wall

6 years ago

I framed my basement walls about 5 inch away from the concrete wall, since there is a drainage pipe in the middle. I am planning to install XPS boards, that ideally need to be cut in half and added on top and bottom of the pipe. Afterwards I am planning to add fiberglass insulation between the studs and close with drywall, without a vapor barrier. However, I have a few concerns, hoping someone can help me to find the best approach.


1) By cutting the XPS in half to skip the pipe will interrupt the protection of the XPS. How should I fill that, to make it closed from top to bottom?

2) After adding a 2 inch XPS behind the framing I still have a decent gap to fill. Fiberglass will be added within the studs but there is space between the fiberglass and the XPS, about 3 inch or so. Is it fine to leave that space? Will air circulation create any issues?

3) As some contractors suggested me, should I give up on XPS and install unfaced fiberglass within the studs and close with drywall. The fiberglass will not touch the concrete wall and will use the 5 inch space between the wall and fiberglass as a way to dry any possible moisture. Does it sound decent as an approach?


(See attached picture to have an idea of the setup. Note: this is taken from a youtube video, but it's exactly as my basement).


Thanks a lot for helping.




Comments (8)