Software
Houzz Logo Print
flysooner9

Drastically different foundation repair quotes

6 years ago

In the process of buying a home in the Dfw area. During the normal inspection it was brought up there was some evidence of foundation movement and settling. House was built in 2005. We got a bid from a foundation company recommended by our agent. They want to do 37 piers! across the front of the house and in the garage itself. $21,000


seller got their own bid from another company And they want to do 13 piers at a cost of $5,900.


it’s concerning the two bids are so drastically different. I’ve attached the two bids. Tomorrow I am hiring an engineer coming to do another assessment and hopefully give me input on the two bids. curious if y’all had any thoughts on the drastic difference in bids?


Comments (5)

Sponsored
Buckeye Basements, Inc.
Average rating: 5 out of 5 stars40 Reviews
Central Ohio's Basement Finishing ExpertsBest Of Houzz '13-'21