Software
Houzz Logo Print
anita_sugumar

Need input to remodel kitchen.

5 years ago

Planning to remodel the kitchen before I move in. I am not a fan of angled counter top and bar style breakfast counter. Also this kitchen has the cooking space in a small island. Not sure what if it is functionally good. Looking forward to any ideas for remodeling

Comments (17)

  • 5 years ago

    We need an overhead plan with measurements of kitchen, walls, doors, etc. I'd move the cooktop to the perimeter run between the fridge and ovens.

  • 5 years ago

    Let me see if I can get iy

  • 5 years ago

    The room has a door near the pantry connecting to formal dinning. The two openings near the angled part is the living space. I don’t have picture but can take more soon and post

  • 5 years ago

    Should I keep the island? And make the angled part rectangle without the bar sitting style

  • 5 years ago

    That pillar and other wall are likely load bearing and have HVAC &/or plumbing in them. There may not be a lot you can do with the general footprint without a major remodel. How extensive are you willing to go? If you want to start moving walls, etc, I would add taller uppers, convert that built-in section to proper cabinetry, pop a hole into that pillar to see what’s going on inside it, try to get rid of the little island and change that peninsula to move it in closer for a bigger more functional island, even if you have to somehow keep that pillar. I would also make that counter height to visually open it up and also expand workspace. Lots of possibilities, possible structural restrictions. More info needed, including budget and your comfort level.

  • 5 years ago

    So you’re not moving in for a year? Because it will be challenging to even gett an appointment with a kitchen designer within 6 weeks, and then getting on a general contractor’s schedule can take 6-12 months. Cabinets are 12-24 months out for anything worth ordering.


    Move in. Start the ball rolling by finding a good Kitchen Designer. Prices are up 30% over last year at this time. Everyone is having rate hikes and delays.

  • 5 years ago

    I didn’t know that it would take that long. We thought possibly a month

  • 5 years ago

    @theresen not planning to make structural modifications. How about a straight counter between the two pillars? Not sure if I should remove island

  • 5 years ago

    Something like this

  • 5 years ago

    Oh dear, no! All the trades are crazy busy. We started demo on our reno in August 2020 (in earnest a couple weeks later) we personally know all our contractors as friends and we still had to wait. We are only now down to the home stretch. The kitchen was barely functional in December, but our wood flooring was only done at the very end of December, so it was a solid 4 months of dysfunctional chaos. I’m still feeling anxiety and fatigue at the tasks still ahead of us. This week we had our back utility area tiled. It’s 99% done, but we have to put the laundry and half bath back together which entails plumbing and ducting, installing range hood with ducting, millwork, patching & painting, and deep cleaning after this mess. Plaster messes get onto and into everything! Redoing ceiling texture is even worse. If you are able to stay somewhere else, that’s great, but either way you need to know what to expect, and then expect it to be 10x worse. It’s worth it, but it’s a hell of a process getting there. Plan as much as possible ahead of time, get quality help, and keep a bottle of wine handy, lol.

  • 5 years ago

    Please add more photos of views in different directions and scale drawings, too

  • 5 years ago

    The realtor says there is no drawings, I just sketched one but not to scale

  • 5 years ago

    Will this help?

  • 5 years ago

    Thanks on your input about the market. The contractor is our friend, but I am not sure about the material. Need to check with them. Don’t think we can afford two payments so need to move quickly

  • 5 years ago

    This is what I am thinking but lots more space between the island and counter

  • 5 years ago

    Wait to plan this until after you move in and lived with it for a while. It’s impossible to have this done until late fall or early winter. More planning equals a better result. This is a 70-90K expense, average, so you may find that you can live with less than perfect better than you think you can.

Sponsored
Mary Shipley Interiors
Average rating: 4.8 out of 5 stars34 Reviews
Columbus OH Premier Interior Designer 10x Best of Houzz