Pool Slopes too fast

3 years ago

We're putting in a 18x36 inground pool. We wanted a sports pool but the slope on one side of the pool was significant and they said it would cost a lot to raise up that side so that we could have a sports pool. Plus, they said we'd have to make it longer because of the tanning ledge. I wanted the sports pool for pool games. Anyway, we elected to do a 6ft deep end instead. My issue is that there is no flat surface anywhere in the pool other than the tanning ledge. It starts sloping down as soon as you get off the stairs. I want at least one flat area in the pool to be able to play games and such. Is it possible to repour it or is it not worth the cost?

Comments (12)

  • 3 years ago

    Is it already in the ground? What stage are you in?


    When my pool designer first showed me our final plan, it too was just a slope from one end to the other, shallow to deep. And she initially gave me some kind of bs about length of pool and slope angle, etc. But I just kept saying no (bc who wants to feel like they are on an angle the whole time?) and talked to someone else with the company.


    Also, check at troublefreepool.com I posted my plan there and got great feedback and information I took back to my pool builder. In the end I have one half that runs about 3.5-4.5/5 ft, and around 5 feet there is a significant drop about a foot and the rest is 6-7 ft deep.


    georgiagirl70 thanked justcallmepool
  • PRO
    3 years ago

    A structural engineer will conform to a certain slope ratio based on the proposed depths and transitions.

    The client would provide the depth(s) they would prefer, the PB would convey this information to the structural engineer and design accordingly. It will include the concrete thickness and other specs, the type of rebar and their placement/spacing and may also so skimmer details in relation to wall thickness and also rebar placement.


    Generally depths will vary from the shallow end, the break, and the deep section.

    Constant depth pool are designed differently and structural engineer will design based on that.

    Ad yes, a tanning ledge can take up a significant portion of the shallow section which results in a short distance to the break point. We have made pools longer because of this aspect in order to provide a longer section before the break.

    georgiagirl70 thanked Mystic Pools, LLC
  • 3 years ago
    last modified: 3 years ago

    I went back through all my communications and photos from the builder and there is not one single photo that shows the slope scale. I only have generic photos of the layout. And this isn't the only thing he has made decisions on his own about. He added a deep end swim out without even asking us if we wanted it, where we wanted it or how deep we wanted it. Plus he never asked me how deep I wanted the tanning ledge. Nor did he ask where I wanted our 3 led lights placed. Plus, I wanted glass waterline tile and he tried to tell us it would cost an additional $5000. I know that tile is more expensive but it's only about $900 more, so now I have a tile that I hate. I am so angry over this entire build.

  • 3 years ago

    By the sound of it I think it's a finished pool in the ground already?


    I think you need to talk to the pool builder about your unhappiness and see if anything can be done. The tile can probably be redone to at least something you love. I'd maybe use someone else unless he offers that at no cost.


    If it's any consolation regarding the slope, most of the time we are on a float of some kind so not really walking along the bottom anyway.

    georgiagirl70 thanked justcallmepool
  • 3 years ago

    @justcallmepool the pool is not complete yet, just gunite and tile so far. I am going to talk to him today. Thanks for the feedback!

  • 3 years ago

    definitely get the tile you want at least

    georgiagirl70 thanked justcallmepool
  • PRO
    3 years ago

    It sounds like you have a very difficult problem. I don’t see a good solution. Once the permits are pulled and the basic structure is in place, i don’t see how the structure itself can be changed. Any change in that would require Re permitting at least in our neck of the woods (Gulf coast Texas). Have you paid in full? Do you still owe money? Negotiate best deal you can and hopefully the finished product will hold water and give you years of fun. Hard lessons—in today’s world, you have to get very knowledgeable and deeply involved to pull off any home project. Not saying you did this, but avoid low bidder too. Talk to previous client’s and folks those people know to fully vet contractor. Pools are tricky business for sure!!

    georgiagirl70 thanked Flo Mangan
  • 3 years ago

    @Flo Mangan we interviewed several pool companies, talked to previous customers, read reviews, checked BBB, and they were not the lowest bidder, more mid-range, but had excellent customer feedback. They do good work, but their project manager needs to learn some actual project management skills lol.

  • PRO
    3 years ago

    Great. You’ve done everything right. Get a face to face meeting with pool company owner and discuss your concerns and desires. Pool companies are in high demand and good craft are hard to find. Hope you can figure out a satisfactory resolution. As I said, wasn’t saying you didn’t do your due diligence but rather for others to gain from your experience. Best of luck.

    georgiagirl70 thanked Flo Mangan
  • 3 years ago

    @Flo Mangan we are paying in stages too, so I told him this morning some things need to be addressed before another payment is dispersed.


  • PRO
    3 years ago

    Perfect. You have some leverage. Try to be as logical as possible. Think through what your “desired outcomes” are. No need to reveal them but good to be clear in your own mind about what would satisfy you.

    georgiagirl70 thanked Flo Mangan