Search results for "Restaurant garden" in Home Design Ideas

Outdoor garden patio for trendy ramen restaurant. Bucking the trend of large annual flower baskets that dominates in the neighborhood for perennial plants, succulents and edible flowers.

Outdoor garden patio for trendy ramen restaurant. Bucking the trend of large annual flower baskets that dominates in the neighborhood for perennial plants, succulents and edible flowers.
Find the right local pro for your project

Outdoor garden patio for trendy ramen restaurant. Bucking the trend of large annual flower baskets that dominates in the neighborhood for perennial plants, succulents and edible flowers.

Outdoor garden patio for trendy ramen restaurant. Bucking the trend of large annual flower baskets that dominates in the neighborhood for perennial plants, succulents and edible flowers.

Outdoor garden patio for trendy ramen restaurant. Bucking the trend of large annual flower baskets that dominates in the neighborhood for perennial plants, succulents and edible flowers.

The former mudroom became the pantry. A glass partition allows for the light to flow through.
Inspiration for a small industrial ceramic tile enclosed dining room remodel in Los Angeles
Inspiration for a small industrial ceramic tile enclosed dining room remodel in Los Angeles

Sponsored
Columbus, OH
Free consultation for landscape design!
Peabody Landscape Group
Columbus' Reliable Landscape Design & Contracting

Making a hanging wall garden. Art with plants.
Example of a tuscan balcony design in Charlotte
Example of a tuscan balcony design in Charlotte

Plant to Plate Restaurant and Rooftop Gardens
Inspiration for a large farmhouse home design remodel in Los Angeles
Inspiration for a large farmhouse home design remodel in Los Angeles

Sponsored
Columbus, OH
Structural Remodeling
Franklin County's Heavy Timber Specialists | Best of Houzz 2020!

July 2013, the garden was up and hoping, filled with Okra, Peppers, Asian Long Beans, Edible Flowers, and many Herbs.
Design ideas for a traditional landscaping in Austin.
Design ideas for a traditional landscaping in Austin.

Project: Palazzo Margherita Bernalda Restoration
Elements used: Encaustic Tiles, Antique Limestone, antique stone fountain, antique stone fireplace.
Discover the cuisine, wines and history of the Basilicata region at the luxurious Palazzo Margherita. Set in the village of Bernalda, the well-preserved villa is close to the region’s white-sand beaches and the famed Sassi caves. The property was recently renovated by the Coppola family with decorator Jacques Grange, imbuing its luxurious traditional interiors with modern style.
Start each day of your stay with an included breakfast, then head out to read in the courtyard garden, lounge under an umbrella on the terrace by the pool or sip a mimosa at the al-fresco bar. Have dinner at one of the outdoor tables, then finish the evening in the media room. The property also has its own restaurant and bar, which are open to the public but separate from the house.
Traditional architecture, lush gardens and a few modern furnishings give the villa the feel of a grand old estate brought back to life. In the media room, a vaulted ceiling with ornate moldings speaks to the home’s past, while striped wallpaper in neutral tones is a subtly contemporary touch. The eat-in kitchen has a dramatically arched Kronos stone ceiling and a long, welcoming table with bistro-style chairs.
The nine suite-style bedrooms are each decorated with their own scheme and each have en-suite bathrooms, creating private retreats within the palazzo. There are three bedrooms with queen beds on the garden level; all three have garden access and one has a sitting area. Upstairs, there are six bedrooms with king beds, all of which have access to either a Juliet balcony, private balcony or furnished terrace.
From Palazzo Margherita’s location in Bernalda, it’s a 20-minute drive to several white-sand beaches on the Ionian Sea.
Photos courtesy of Luxury Retreats, Barbados.

Saturday June 27, 4:00 to 5:30pm | Manhattan
Pool Farm by David Seiter of Future Green Studio
High above Midtown Manhattan, this transformed rooftop pool is now a farm-to-table restaurant, the Press Lounge, offering guests a dazzling view of the New York City skyline. From the 19th floor of Ink Hotel, a beautifully designed edible garden is meticulously cared for to create seasonal food and drink options from ingredients grown onsite. Utilizing themes of material reuse and urban infill, this custom design and fabricated system of wood terraced planters transforms an underutilized rooftop pool into a dynamic private dining experience. The project is inspired by the structure of a sushi mat- with flexibility in one direction and rigidity in the other, the mat rolls fluidly from deck to bench to planter to wall. In an effort to make the project sustainable and cost effective, ipe wood decking was salvaged from a recent renovation and repurposed. The planting palette was selected in consultation with the restaurant’s chef, professional forager and a rooftop farmer in order to orchestrate the edible garden with unique seasonal food and drink menus. A small slice of paradise has been found in Hell’s Kitchen. Photo by K•Taro Hashimura

Thomas Lynch Design
Inspiration for a farmhouse full sun vegetable garden landscape in Portland Maine.
Inspiration for a farmhouse full sun vegetable garden landscape in Portland Maine.

Thomas Lynch Design
Inspiration for a farmhouse full sun vegetable garden landscape in Portland Maine.
Inspiration for a farmhouse full sun vegetable garden landscape in Portland Maine.
7







