Software
Houzz Logo Print
dpierro1

Patio design

12 years ago
Love the look of the patio. I had a few construction questions. Is it wet or dry set bluestone? And what kind of prep work was done (type of subbase, how thick, what stone was set on, how large are joints and what fills the joints)? Thanks for the info in advance.
DJ
Dover Home · More Info

Comment (1)

  • PRO
    12 years ago
    Thanks for the questions. The patio is dry set on a sub base of compacted perk pack that is 10" thick with a base of 1" of compacted stone dust under the bluestone. The joints vary between about 1/8 and 1/4 of an inch and are filled with stone dust.
Sponsored
Peabody Landscape Group
Average rating: 3.5 out of 5 stars8 Reviews
Columbus' Reliable Landscape Design & Contracting