Software
Houzz Logo Print
jamawass

Electrical inspection

17 years ago

Hi all

I got my rough electrical inspection which passed. However the inspector put a note saying that since my basement has hvac roughed in with registers, that it should have a full electrical install done by completion of the house. I installed a geothermal system and the unit covers both the basement and first floors which was advised by all the quotes I got.

What are my options? I have no intention of doing full electrical in the basement at this stage, can I appeal this?

Thanks for all input in advance.

Comments (5)