learn_as_i_go

When can a builder provide a realistic estimate?

17 years ago

We built a home 8 years ago, and we're gearing up to start building another home. During our first home build, we got ballpark estimates from 5 builders just using the internet renderings. We moved forward with one builder who was able to honor his original estimate after we ordered the full drawings and the builder's in-house architect made minor modifications for code.

Fast forward to the current time...We got rough estimates from 3 different builders by sending them a stock internet plan and desired features (flooring, windows, etc.). Of course, the one builder that just could not give us a number is the one who is the sole builder in the neighborhood that we've now decided is the best location for us. He's going to live in the neighborhood and its relatively small (end result will be about 30 homes) so I'm trying to not hold the "sole source" issue against him. So far seems like a very nice upstanding builder, and he gets rave reviews from other in the neighborhood.

Issue: We told him that we have a strict upper ceiling of $625,000. At first he said there was "no way" he could build a home in this neighborhood at that price, but when we drilled down to the details he conceded that it's probably possible with the type/size of home we want to build. Still no price estimate, though. Then he had us walk through a home that was similarly sized (4 BR ranch + FROG) and told us that if we can keep our main floor of the ranch to a similar size then he thinks he can build within our budget. He sent us to an architect that he works with pretty consistently to have a basic plan drawn up. We thought this basic plan would be used to finally nail down a price...guess we were wrong. When we called today to report that the basic plan is done, he said we should go back to get more detailed plans showing joists, etc. so he can do an accurate pricing.

I personally would like a ballpark at this point just so we can know whether we need to throttle back on some features like the roofline, windows, and materials (or basement?!) before we go too far with these detailed drawings... The good news is that the builder is bearing the cost of architect at this point; cost is passed thru to us only if we go forward with a contract.

Comments (3)