OT:please help prioritizing future projects

14 years ago

Sorry this is not really kitchen related but I got such wondeful help here before I though I'd take a chance on your collective wisdom...

Living in an older home as we do, we have no end of projects (some fun, some just necessary). My problem is that I just can't decide which one(s) to do this year and which ones can/should wait.

1) Move the door to our powder room out of the dining room and into the front hallway. This one I think will definitely be done as it is not so expensive and the bathroom itself does not have to be redone, just one wall patched up and one wall cut up.

2) Renovate the master bathroom and the boys' bathroom upstairs. They are both in fair shape, though the grout is definitely going bad on the shower tiles in both and the boys' sink is pitted and stained...they were probably last done over in the late 70s-early 80s with some fixture updates in the master bath within the last 10 years or so. I'm sure we can get by another year if we have to.

3) Refinish or replace the hardwood floors. They are original pine floors from 1873, and in some places the finish (not sure what it is exactly) is entirely worn off. Since we moved in 2.5 years ago, we have done a number on them, finish is flaking off in major traffic patterns and there are a few corners with dry rot and some pretty wide gaps. Two bedroom floors are painted, and the front stairway and two other bedrooms have carpet we would like removed (the floor under the carpet is also painted). I frankly don't even know yet whether the floors can be saved or if we have to put down new ones. This would certainly be the most time consuming and disruptive project, esp if they are refinished what with sanding and coating. Again, we could probably get through another year if we needed to.

Between the bathrooms and the floors, which would you do first? Thanks!

Comments (6)

  • 14 years ago

    It depends on how eager you feel and how big the budget is.
    The most bang for the buck would be the kids' sink, with the bathroom entrance downstairs coming in second.
    I'd worry about the rot in the floor first. It may be a symptom of a larger problem. I'd also attend to any gaps in the grout by adding caulk in the showers because you don't want water damage.
    The best way to decide is to get estimates for everything so you can compare known quantities.

  • 14 years ago

    Tough call between dry rot and failing grout. Water damage, rot and potential for mold or termites raise the priority level. I'm thinking bathrooms, but if the rot on the floors is bad, you might need to go that route. You really need to do that one that will best prevent future or further damage.

  • 14 years ago

    You always start with the top in any reno. Get the roof dry and then you can fix the foundation issues, etc. That's why I'd start with the master bath first since that is on top of the other bath. If there are any problems with it, they will extend downhill and potentially damage the lower bath's ceiling and walls. No point in doing the lower bath only to have it damaged from a problem from above.

    There are several topical acrylic coatings that can give you a temp protection for your floors if the problem there isn't in danger of becoming worse from some underlying reason. Holloway House sells one that I used for several years in my old Foursquare. I never did get around to refinishing it but periodically coating made it look great right through resale.

  • 14 years ago

    Thanks for the advice. The rot in the floor (just one section in a DR corner) was probably due to an old termite problem but we do not have one now. The bigger issue is really that our simply walking around the house, even in socks, is wearing/flaking away the finish and exposing the bare wood underneath.

    I do have some concern about what is behind those bathroom tiles. The boys' bathroom is probably the easiest as it is very small and the layout would have to stay the same, just new everything. The master is a different story, it has quite an odd layout and wasted space, so a major redesign is probably in the cards. I just have to figure out if I'm up to it! :-)

  • 14 years ago

    I'll second or third the notion of attending to the grout. When we moved in 14 years ago, we found that the tiled wall of the master bath shower/tub was leaking, as it probably had been for many of its 70 years. The first thing I did to the house was to fix that. This year, when we gutted the kitchen, we found, as expected, extensive water damage below the bath. I literally dismantled many of the studs with my bare (well, gloved, actually) hands.

  • 14 years ago

    I'd prioritize based on what is going to cause problems if left undone, and it sounds like the bathrooms could be the one - if you don't already have water getting were it does not belong, you soon could.

    You also should plan that you aren't going to mess up a "fixed area" when working on another area. We left the kitchen to last as it's central, and we knew we'd be hauling supplies through the middle of it when working on the two story addition of the house. We had to wait until our Son moved out to do that, as we had to do the entire section (both levels) at one time and had to move everything (including our bedroom) out into other areas of the home.

    We started in 2004 and may actually finish up this year.