Two weeks into demo - Progress Report

16 years ago

We are two weeks into demolition. The kitchen and dining room are packed and stacked in various rooms. The cabinets have been removed and are gone. The structure that was the lunch bar has been disassembled. All the flooring is up. DH cut a trench in the slab for the wiring to the island; the conduit is laid and the trench patched. The new door to the laundry room from the living room has been cut and the walls removed to make a bigger laundry room from the original laundry room, closet, and refrigerator nook. The od door to the laundry room is down and the framing for the new kitchen wall up. Dry wall is up on the kitcehn side.

The electrician comes tomorrow (unless he get snowed out.) There is LOTS of dry wall repair work that needs to be done before I can paint next weekend. It will be a race to see if we can be rady for the cabinets instllation to start Februay 22.

Here is a before photo.

Here is a link that might be useful: More Before Photos on my Blog