Hey everyone! I've been lurking here quite awhile and really love this site and all of the great info. I thought I'd share something we did recently that was such a great help in making some very important decisions. Maybe it's been suggested before. If so, I apologize for the repeat. If not, maybe it will be of some help to someone else.

We have been having issues deciding on our island size in a 15x20 kitchen reno (we took out the wall between the dining room and kitchen to make one big kitchen room). We tried the cardboard templates and that helped making a few decisions, but it still didn't answer enough questions regarding traffic patterns, since we already know that the space in front of the fridge is gonna be tight.

We took pieces of our old temporary subfloor and cut it out to make the size of our island that we wanted, and mounted it on roller stands to the counter height and placed it where we thought we wanted it. This enabled us to put chairs (from our counter height patio set) around it.

When we first put it in the empty room, we were in shock at how much space it took up. I was in tears for awhile, thinking I would have to give up on my dream of my huge island.

We decided to leave the temporary island up for a few days to see what solutions we could come up with. Honestly, we were ready to scrap the whole island idea and go back to the range facing a wall and just a table, which is NOT why I've been living through this 5 month remodeling project! I WANTED MY ISLAND!

Well, after a few days of living with and kind of using this temporary island we discovered a few things.

Originally, the cooktop end was to have a 36" cooktop base, with drawers, flanked by 2-12" drawer sets. I took that down to a 30" cooktop base and kept the 2-12's. Then directly behind the cooktop area there were supposed to be 4-24" bases boxed together with a 12" overhang on the far end. This plan left only 4" of overhang to push the chairs under the sides which obviously wouldn't work with the traffic pattern and the fridge would be too close. So we took out 2 of the 24's and put one 30" base in the middle of the other 2-24's and cut the overhang at the end down to 10". This gives us 13" of overhang at the last 34" of the island and the chairs fit under it, and the 10" overhang at the end works a lot better than the 12" did. It's amazing what a difference a few inches make.

Also, we concluded that we will absolutely have to spend the extra money to get a counter-depth fridge instead of the huge box I've had my eye on, to make the traffic pattern work.

Overall, the island will be 56x83, and that is plenty big for us, plus I still get the layout I want! And I get my island!

We had all of our previous plan, 62x85 island and full size fridge, put on paper and it looked right, and the kitchen people said it would work too. But actually putting in the temporary island top and walking around it and using it, answered so many more questions than a piece of paper ever could have.

Yes, I had to make a few changes, but at least I didn't wait until I had ordered my cabinets and bought the fridge I had in mind, only to get something that no matter how it looked on paper, would not have worked and we would have been so unhappy with the whole thing.

Yes, I'm gonna have to spend extra $'s on the fridge, but I saved $350 on my cabinet changes and I have a traffic pattern that will work very well.

Sorry this is so long, but maybe someone else will benefit from it. Sometimes taking a little extra time and doing a little extra work to make a temporary visual helps, instead of only seeing it on paper. At least it did in our situation.

Comments (6)

  • 18 years ago
    last modified: 11 years ago

    Thank you for sharing! I think what you did was such a good idea. The lesson here is if you want something bad enough you're "gonna find a way for it to work"!

  • 18 years ago
    last modified: 11 years ago

    Absolutely! While a taped-to-the-floor template may be OK for some projects, there's nothing like 'real-height' templates left in place over a few days to really get a feel for things.

    We had to do that to get our island overhang placed properly. Our island backs to the open family room on one side and open dining area on the other, with a 'pinch point' where the outside corner of the island comes close to the outside corner of the wall. We had no idea how wide that 'pinch point' needed to be to accommodate the busy foot-traffic patterns that pass through that area. So we mocked it up the actual bar stools and a cardboard 'top' on boxes that we moved back and forth a little bit each day until we found the 'maximum' kitchen space that didn't pinch at the corner. Then we simply backed out the overhang we needed and taped that spot on the floor for our cabinets - which then drove the details on cabinet sizes.

    When compared to the 'tape-on-the-floor' version, we were surprised to find that we needed about 6" LESS aisle space than we thought, since overhangs do not feel the same as 'walls'.

    We did the same thing with our vent-hood, so now when DH blames me for putting the hood 'too low' (he's much taller than I am and it's at the maximum recommended height above the cooktop), I can tell him that he tested it out himself and approved the design...

  • 18 years ago
    last modified: 11 years ago

    What a wonderful way of testing out your new kitchen! I think this is great for folks who are having layout questions. It sure answered flow decisions for you. Great advice for everyone! Good luck!

  • 18 years ago
    last modified: 11 years ago

    This all sounds very sensible, but I have a logistical question. Unless the project is diy, how do you wait until the kitchen has been gutted and the wall removed before you order your cabs and counters? I thought these need to be ordered well in advance of tear-out so there isn't a huge lag-time between tear out and installation. Am I missing something?

  • 18 years ago
    last modified: 11 years ago

    Sorry, forgot to mention that this is a DIY project. I sometimes forget that all people don't live this way. My husband is way too picky to let anyone else do construction for us. Of course, that's why we are into month five of this beast and have at least two more months to go. The price for perfection!
    Also, we are lucky in regards to our order time, because my cabinets only have a two week lead time and my slabs of quartz have been waiting for me since November.
    I just thought I'd share what we did in our situation to help us. I can only speak from our experience.

  • 18 years ago
    last modified: 11 years ago

    Sjerin--You're pointing to the very good reasons for setting up a temporary kitchen. DIY'ers particularly know that a renovation will be slow going and are willing to make provisions that perhaps others looking for a turnkey job don't consider. And, I suspect that lead times for cabinet delivery may have shrunk because of the slowdown in new construction. Also, the time of year that you're needing delivery will be a factor, esp. if you live in parts of the country that have a real winter and are shopping more or less locally.