christd1_gw

GC Threatening Lien on Property

19 years ago

I need some advice... Live in Iowa and we had our basement finished but the total bills came in at $21k vs. an estimate of $11-13k. We laid out a floor plan but all of the agreements were verable. Before the work started, we removed a hallway and finished another 10x12 room (estimated to increase the cost by 10%). As the work was going on we became worried about the cost as it seemed to be taking more time (6 weeks vs 4 planned) than originally discussed. Contractor said it may be a little higher but didn't expect any major surprises. Well we were surprised when we saw the bill.

1st big issue is that he is saying the electrician wasn't included in his quote. I specifically told him to sub contract HVAC, plumbing, electrician (it should be noted that this guy is a popular sub and does some other projects out on his own). This rang up to $2k but even w/o that we were 32% above the estimate.

We paid the electrician and $11.7k to the contractor and the remaining cost was being negotiated up to this point.

He provided me the bills for materials (not marked up) and his labor hours ($50 per hour which included him and a clean up/gopher guy) and wanted us to sign a contract. We said that we would review the info. He came back today saying that he is going to the courthouse. What should I do???

Comments (16)

  • 19 years ago

    Well, from what I'm reading he gave you an estimate, not a flat bid. Unfortunately an estimate is just that and as costs change thru the job, so will the estimate.

    We never work with a contractor unless it's a flat bid and any changes/extra costs have to be discussed as work progresses. Hourly charges, especially his $50/hr can add up quickly once they go over an estimated plan.

    Unless you have a contract showing everything you agreed to I think it's going to be difficult to fight him in court.

    The main question is: are you happy with his work and the final outcome?

    Here is a link that might be useful: lien questions

  • 19 years ago

    Whatever you do, don't sign a contract now. That's not a thing to do AFTER construction. You should have done so before the job ever started, including things like "the electric is included in this bid, etc."

    At this point, you have an estimate, and your "discussions" with changes, but that's all you have. You could have forced him to a written change agreement with guaranteed costs at any time during the project, but instead you just went with a "spoken" agreement, which won't hold up in court.

    I think you're lucky it wasn't worse, and I'd suggest paying the bill. It's really your fault at this point, considering you never did get an agreement together.

    And $50 per hour is pretty cheap. We're looking at $70.00 per hour for the lead and one man, and an additional fee for other man hours....$50 would be a bargain.

  • 19 years ago

    I am not a lawyer, but the courts tend to go with "quantum meruit," what was the work worth. He has records of hours worked and materials that he is charging at reasonable rates. You have nothing in writing (that's bad for you.)

    You have the power of owing him money and he has the power of a stronger case. Neither of you wants this to go to court. You should think of a concession that would help you, perhaps his agreeing to be paid over time. He probably won't agree to a small discount, but he might agree to avoid a hassle. Even if he liens you, he has two years to start a foreclosure, or his lien expires. That's not too attractive for him. Your credit gets gobswacked --that's bad for you.

    In meaner parts of the country you could have been hurt a lot worse. You don't want to pay more than the estimate. He wants to be paid for his inputs. So the courts would ask: what's the job worth. It's not worth his estimate. It's worth what he put into it.

  • 19 years ago

    Estimates are in no shape way or form legally binding. Contracts are. You don't have a contract. You have completed work, that is documented by materials bills and labor charges. Pay the contractor. And learn from the experience. Whenever embarking on a project, have the job already figured out, with all of the particular materials and finishes you will need. Then, get several bids from different contractors and pick one. Sign a contract that specifies the work to be completed and the materials to be used and what the proceedure is for any change to that contract. Then, if you have an honest contractor, you are more or less protected, or at least you are in the right if it does end up in court and can expec a ruling in your favor (after a bunch of $$ has gone to the lawyers, of course.)

  • 19 years ago

    Laws vary by location, but just because someone puts a lien on your property doesn't mean they are automatically taking you to court. In my state, they have a year to renew the lien and then another year to file in court. After that, the lien just sits on the record, but can't be filed as an action against you. In my state, a contractor can walk in and put a lien against your property without even proving he/she worked on the place. Our state doesn't notify you if you have a lien. It only costs them $25 and can make a pretty good scare tactic.

    You are running $8,000 above the estimate. You've already make a good faith payment of almost $14,000. Most likely that would mean the contractor would only take you to small claims court since any type of attorney would eat up his profit fast. The worst that can happen in small claims is that the judge tells you to pay the money. You wouldn't be getting stuck with his attorney fees in small claims.

    Verbal agreements are binding where I live. We've done a complete addition with only a verbal agreement before. Every job we've had done has pretty much been a verbal agreement. Depending upon where you are, they can hold up in court.

    What did you verbally agree on? A flat amount or to pay by the hour? I really prefer not to pay by the hour, since it really slows down the work. With a flat fee, they quicker they are done, the more they make on the job. Unless you plan to sell your house within the time the contractor can take you to court after putting the lien against the house, I'm not seeing huge consequences.

    I would tell him you want to work with him on this and then I'd be on the phone quick and find out the laws for liens in your area. The biggest question is do you think the work is fair and what you agreed upon, and did you only agree for a flat fee or to pay hourly. A contractor's lien wouldn't scare me much.

    Gloria

  • 19 years ago

    very nice perspective Gloria. Another reason why I love the different/unique views on this forum!

  • 19 years ago

    I don't think a lienholder can demand foreclosure on the property unless the amount owed meets or exceeds the value of the property itself. I'd imagine your property is worth much more than what you owe the guy.

    If its installed and you accept it, then you should pay for it. To do otherwise is akin to theft in my mind.

    No one should ever hire a contractor who is willing to work without a contract. Doing such is a mandate for a disaster, either for the contractor, the homeowner or both.

    Here in my state there is a limit on the amount of claim that can go to small claims court, above that the matter is taken to higher court which oftentimes requires an attorney to represent you.

    Every contract should have a very clear change order procedure and it should be followed. Every time I've had a customer not want to honor my change order procedure, they've been someone out to put the screws to us. Not to say that you are, but I am amazed that any experienced contractor would not give you an accounting of the change requested and have a signed agreement on it prior to proceeding.

    Also, $50 an hour is cheap. We bill at $65 for Time and Materials work, plus an upcharge for management or other fixed costs. Change orders are always Time and Materials and I will charge an additional fee for the cost of extra work, compiling quotes from subs, extra design work, engineering or if the customer needs an incentive to cool their heels and get back on earth.

    Also, you talk of delays the project, but did you consider the extra time involved in the changes and how they would effect the overall project schedule? The contractor's cavalier 'oh not much' response sounds like you two didn't do a sit down and really hash each portion of the project out, including changes.

    If the guy is willing to give you a clear accounting of the costs and labor, you are happy with the work (which apparently you are as you haven't complained), then pay up and take it as a lesson learned.

  • 19 years ago

    Foreclosure laws vary from state to state as well. In our state a lienholder can move to foreclosure. You are then forced to pay up, or sell if the lien holds up in court. The lien must be proven though (with receipts, contracts etc.). We had to put a lien on the place we purchased because the guy selling was trying to break contract. It wasn't terribly hard, but we did know that we had to back it up with the purchase contract in hand when it came time to forclosure. Your guy does not have a contract either, but he does have more than you apparently have to back his side of the case.

    I hired a contractor without a contract on an hourly rate, with a verbal "approximate total bid" once. And ONLY ONCE! I was planning on a contract and went into the hospital for a significant period of time. When I got out the bid (with no change orders) had gone up 35% and we had to shove him out the door without the work being finished because he'd not followed directions (he moved a wall a foot over because it was "easier for him"). Anyhoo, I did pay him in full, and blamed myself for the error. As newengland says, never hire a contractor without a written agreement on what's to be done, and how much it's to cost at minimum! I never will again :)

  • 19 years ago

    Interesting how lien laws vary by state. Where I live, someone who files a mechanics' lien has six months to act on it. Six months expires with no action, then it's not enforceable in court. That's the good news. The bad news is, expiration does not remove the lien from the books. The only way to get a dud lien off of your property is that you either have to convince the lienholder to voluntarily remove the lien, or else you have to sue for slander of title. I'm about to have to go through that.

    And quiltglo, as in your case, the law here demands no proof whatsoever before filing a lien. I could get out the phone book and file a lien against every property in town. And here also, the state does not notify property owners that a lien has been filed against their property. The only way to find out is to pay for a title search.

  • 19 years ago

    As a follow up.... I contacted our county court house today and no lien has been filed.
    I have been of the same opinion as most of you... I should have demanded more documentation upfront, the work quality was good even if the communication wasn't and the receipts are there to show the expenses.
    My wife, however, is of the opinion that the contractor has an obligation to manage their business and we frequently inquired about the expenses and were told that we were on budget. The contractor even admitted that he didn't know how much he had spent until a couple weeks after the construction was complete.
    So we are at a stalemate. I am hoping we can come to some middle ground, my wife doesn't want to pay more than the estimate plus the 10% and the contractor wants it all. I guess at this point it will go to small claims.

  • 19 years ago

    The Mechanic's Lien law in Iowa gives the contractor 90 days to file the lien after completion of the work and two years to file suit (although you can demand a filing within 30 days). However, Iowa law also requires that he send you a written notice of the lien law within 10 days of commencing his work. So it is open to question whether or not he could file a valid lien against your property. Regardless, it doesn't really matter because if he wants to sue you he can file a suit for breach of oral contract and/or quantum meruit with or without the lien. All the lien does is act as security for payment if he wins. Because of the costs involved in suing you and the amount in dispute it's unlikey that he would do anything but to take you to small claims. You should check what the maximum jurisdiction for the small claims court in your area - it's unlikely that it's more than $5,000. If you can't settle for what you think is reasonable, I'd let him file. Courts will often side with the homeowner if they have been reasonable and verbal contracts are enforceable although they are hard to prove. While his $50 per hour rate may be reasonable, who's to say that he worked efficiently - maybe he billed you for more hours than it should have taken. Just don't let the lien threat scare you, contractors love to use that since it doesn't cost them anything and sounds really scary. Good luck.

  • 19 years ago

    I hate to digress a little...what's better in a new contract: dispute resolution via binding arbitration or an open contract that allows litigation via small claims court, etc?

  • 19 years ago

    I wouldn't do anything with binding arbitration. You need a whole 'nuther document to make sure you have how you'll choose an arbitrartor, how he/she will be paid, timelines, etc. I probably wouldn't go with anything limiting me to small claims either. It's $10,000 here, but a screwup can cost way more than that. Why limit the amount of compensation? The contract could just state that the laws in your jursidiction will be followed in case of dispute.

    Gloria

  • 19 years ago

    There are valid arguments on both sides of this issue. However, as the homeowner I would not agree to aritration, which by default, leaves the court system. The reason is that litigation in the courts is more time consuming and expensive and if you control the money correctly, if there's a dispute, it's more likely that the contractor will be suing you, so why make it easier for him to do so. Also, there's no appeal from a bad arbitrator's decision as there would be from a judge's decision.

  • 19 years ago

    Just to wrap this up.... We paid the GC a mutually agreed upon settlement of an additional $4400. Neither party was happy but we negotiated to it w/o a lien or any lawyers getting involved.
    The really bad part is that we now have had water in the basement which has damaged dry wall and woodwork. I don't know that we have a good solution to fix this.

  • 19 years ago

    Is this the 1st time water has been in your basement? If not, then obviously that should have been take care of prior to finishing it off. Typically the best way & most expensive way to fix this is excavating around the perimeter of the house & installing French drains & water-proof wraps on the exterior basement walls below grade.

    Cheaper ways include installing sump pumps inside & managing the water that way. And if the leaks are not too bad (& you don't expect them to get worse) you could remove the interior walls & use some type of sealant on the concrete block walls. I've heard of a new one that is available that supposedly functions much better than the previous generations however I've forgotten the name of it.