Software
Houzz Logo Print
nysteve

Construction Update (pix!)

15 years ago

First, I have to apologize for having gone radio silent. With the amount of help I got from GW, I should have been posting updates all along as this project has progressed.

Since it's been a while, let me recap:

This is a major renovation, taking out walls etc and changing the main floor of the house from this:



to this:



which obviously opened up the floor plan.

Thanks to much help from GW, we ended up with basically this kitchen design:

Demo began on May 10.

After some minor plumbing mishaps, we had the beams installed to replace the walls being removed, new framing, roughed electrical and plumbing.. and then finally, the sheetrock was completed and the floors were installed. On Tuesday, the cabinets were delivered. They sealed the floors under where the cabinets and appliances would be and then today, the cabinets got installed. Here we are:







and finally, the breakfront:

The appliances are in as well, and the granite folk are coming to template next week.

This is very exciting...but has been going vvvveeeeerrryyyyyy sloooooowwwwwwwlly at times. The original cabinet delivery date was June 6 but we had to move it because we weren't ready! Good thing that the cabinet vendor was willing to store things for us.

The granite is Sienna Bordeaux, and the backsplash will be a tumbled marble with accents and borders drawn from the glass/metal tiles from the 4x4 in this picture:

And it turns out that we took several GW'ers advice, and turned that bay window into a "walkout bay" -- which really adds to the character of the room.

It's been a fun ride... more details and construction pix to follow, but I did want to give everyone an update. Thanks to everyone who contributed comments and suggestions as these plans evolved!