Software
Houzz Logo Print
front_gw

Tips for Kitchen DIYers. Any advice?

16 years ago

I guess I'm looking for tips from people that designed, ordered, and installed their own kitchens. I'm more than likely going to purchase Kraftsmaid cabinets. What would you have done differently? Do you have any advice for the planning stage? I'm in the process of designing the layout and ordering cabinets now. Did you miss anything during the planning stages?

Thanks

Comments (21)

  • 16 years ago

    Work out your budget first. If you don't do that, the money is just going to trickle away on a series of "while we're at it"-type items. That means setting priorities. Maybe you have your heart set on a pricy backsplash tile, or pricy countertop. That means you'll sacrifice on cabinets, or not changing the footprint, or moving plumbing or gas, or appliances.

    Know what your "must haves" are and what doesn't really matter. For me, my countertop and backsplash were "must haves" and I couldn't care less about the sink and the faucet. I was fine with the location of the sink and range, so no need to move expensive plumbing or gas lines. I knew that I didn't want the microwave on the counter anymore, but I didn't want an OTR microwave. I went back and forth on the new drawer models but in the end decided just to rehome the existing cheapo MW in the pantry.

    We did IKEA cabinets. I tweaked that plan for almost a year before I finally decided I was done and we pulled the trigger. At that time IKEA had its semi-annual kitchen sales going on and the fall sale was happening. It was do it then, or wait until spring. So that set a fire under me. By doing all that planning ahead of time, I was very settled in my decisions and we had NO changes to make during the install process (important, because IKEA is 150 miles away).

  • 16 years ago

    I agree with jakabedy about working out the budget first and to set priorities.

    For us priorites were rearranging the layout so that it worked better, and adding gas to the kitchen for the range. We moved the stove and refrigerator, leaving the sink where it was. We also wanted nice looking cabinets, counter, and backsplash. We did all the work ourselves, except for running the gas line from the basement to the kitchen.

    We spent a lot of time on the layout, using the large Kraftmaid catalog (which we sort of'swiped' from Lowes)to know what all the available cabinet dimensions were. Make sure you leave space between cabinets and walls, and order the filler strips for that space, otherwise your cabinet doors will not open all the way.

    A lot of the decisions are the same as for the people who aren't DIY'ing.

    Read this forum paying attention to the details that people who don't DIY have to also think about - where are the outlets (we installed plug-mold, which I LOVE); do you want under cabinet lights, and what kind; what kind/size of sink do you want; how large a stove you want, or do you want a cook top and wall ovens, etc.

    Decide on every detail and price out every thing, not forgetting about framing, ducting, wiring, and plumbing materials. Tweak as necessary to meet your priorities and your budget.

    We did get Kraftmaid cabinets, pricing them at Lowes and at a business we found on-line, which is where we got them to save about $1500.

    I researched appliances and figured out what I wanted, priced them out online, but then got a local Bray and Scarff appliance store to match the price.

    We did our kitchen in 2003 and I'm still 100% in love with it. It was a fair amount of work and there were frustrations, like figuring out how to run the range hood vent duct work across the kitchen to the outside wall, but it all turned out great.

    If you've got good home improvement skills you'll do great as long as you plan the details before you start.

  • 16 years ago

    We are just about finished with our (mostly) DIY kitchen with Thomasville cabinets purchased at Home Depot.
    Sadly, I didn't find the GW site until after the design and cabs were ordered. People post their designs and get great feedback regarding layout etc. The best advice I can give is spend a lot of time at GW! You, too, can become addicted to "Kitchen Porn"!

    Two things that were essential to the installation were a good quality laser level and the "EZ Level" system purchased on line. Our house was built in 1885 and is anything but level, so having level cabinets for the granite install (not DIY) was essential. My DH doesn't part with money easily even if he does like tools and he said we would definitely use the EZ level system again. I have no affiliation with the co, just passing along our experience.

    Installing the crown moulding was the most difficult. He added the cleat to the cabinet top before installing the cabinet.

    DIY can be done. We saved probably 1/3 of the budget by DIYing.

    Best of luck and keep us posted!

  • 16 years ago

    To the good advice already offered, I'll add my two cents worth. Make an honest assessment of your talents. Almost everyone is capable of taking things apart, but may not be very good at putting things back together. If so, demolition, disposal, and daily job site cleanup are an easy DIY task.

    In our case we did the rough wiring and plumbing, but hired a plumber to do the finish work. We also used an electrician to make certain all was proper, but installed the fixtures, switches, etc., ourselves. We hung the sheetrock, and then hired a pro to do the taping and hard coat stucco finish which had to match existing walls and ceilings. Painting is another job almost anyone can do.

    I'm a pretty good carpenter, so we installed all the cabinets, crowns, wood trim, etc., ourselves. There are a number of DIY sites on the internet that will give you some good ideas on how to install cabinets. I used three and six foot levels with wood shims to get everything exact: side to side, front to back, and on both diagonals. This took a lot of fussing, but in the end the granite guys were very pleased. Mitering crown is a piece of cake, but coping is another story. It takes practice, and frequently doesn't come out perfect and has to be redone. Consider ordering an extra length of crown to be on the safe side. Of course you can also miter inside corners, but not everyone agrees this is the best way. If you are not sure of your capabilities, or you have a complicated layout, you might hire someone just to install the crown.

    We had an existing tile floor so I didn't have to deal with that. I've never done tile and am not sure if I would have given this a try. We are going to do a bathroom soon, and I might have a go at it. Had we required a wood floor, I'd have done that.

    I'm pretty fussy, and I've seen many jobs where you can tell it was a DIY. So make certain that if you aren't able to do high quality work on certain phases, then hire a pro who can. Your finished project will be all the better for it.

  • 16 years ago

    All the above andâ¦
    Know what your good at and know who is going to do what. This is important because it will curb many a disagreement. The only problem that husband and I had during the remodel is when he tried to do my jobs and it caused me more work because I had to re-do the whole thing. Seek mentors with knowledge on things you are unsure of. Study and read about things you are unsure of. If the diy is a couples or partners project have a firm grasp of the order of events. For diyâÂÂs its more important to do the job well than worrying about finishing on an exact date. Figure out ahead of time how to address your mate if you are unhappy with his or her work (very important). One really good thing I learned here after reading many posts is not to leave all the little things and touch-up things to the end. Do them as you go. Being that you will be very burnt out at end those little things could otherwise float around unfinished forever.
    In the beginning you will feel both overwhelmed and excited over your project, that passes and you just feel overwhelmed, that passes and you are excited, that passes and you are fed upâ¦if you know this in the beginning it will keep you going until the next stage of the roller coaster ride. Take days off to do others things around your home that need doing, if you donâÂÂt that will add to the overwhelming remodel work.
    Oh, and warn your friends that every time they see you for the next few months all you may talk about is how exhausted you are lol.

  • 16 years ago

    What excellent advice, all of you!!!

    Make sure you take pick-me-up breaks even if you don't feel the need.
    Walk away from the work area, sit in a relaxing spot and even if it's just a glass of orange juice, you need to keep the furnace stoked. :)

    At the beginning of the day you are filled with energy overload.
    DON'T wait until you are exhausted to stop work at the end of the day.
    Stop work BEFORE you think you are too tired at the end of the day.
    We would stop work and give ourselves a half hour for clean-up of the area.

    If you continue working when tired, Accidents Happen! And so do many more Mistakes!*don't ask how I know!*

    Give yourselves enough time for clean-up of area, of yourselves and time to enjoy the evening.....unwind, re-group, step back and see what you've done, where you are....but don't continue working late into the night when you are tired.

    P.S. A lot more bickering goes on when you're tired. Again, don't ask. :)

  • 16 years ago

    There are a lot of details, take enough time to go over most of them now.

    How will you install new outlets?
    What sort of trim will the cabinets have, the windows and door openings, the baseboard or crown?
    Is your ceiling level or do you need to do a two part crown?
    If you're installing a new floor, does that change the ceiling height?
    If you're doing new drywall, the recommended way is to do all of the drywall and then order the cabinets in case the total width changes. If you aren't doing that, make sure you have a little slack - between an inch and three inches - in both height and cabinet runs to allow for "Surprise!".
    Take your measurements using three different heights when measuring widths or get three different samples along each wall when measuring heights. Always use the smallest one.
    When looking at paper, double check allowances for trim or placing cabinets too close to doors and windows. While your still looking at paper, also check that all of your appliances have enough room for their door swings.
    Do you need permits?

    Some popular mistakes:
    Having a corner where the cabinet doors or drawers on one side either can't open or run into the other side.
    Having a range or ref that sticks out from the counter close enough to a corner that the cabinets on the other side have difficulty opening.
    Forgetting the hinges on the top of the ref when calculating total height.
    Not realizing that your walls, ceilings or floors are not level, square or plumb - which affects your total lengths and heights.
    Wall or tall cabinet doors that hit lighting fixtures.
    Choosing a cabinet with a top drawer too shallow for what you'd like to store there.

  • 16 years ago

    I will agree with the above poster classicalone about the cabinets.

    We priced our Kraftmaid at a big box store then searched the internet for an on line retailer. We found a great company on line and they worked with us on a design and layout which was close to the design that we got at the big box store. The difference was about $7000.00 in cost. We were very pleased.

    All it takes is a little research and some phone calls..

  • 16 years ago

    Be sure to check out the first time/newbie thread here.

    Assessing your talents is a biggie and realizing it will take you longer, you have to accept this and move on (DH has an issue with this as part of our renovation, we may do it all in 9 weeks and he thinks it should have only been 7 LOL) - if you aren't sure about plumbing/electrical/etc, get started finding people. Maybe I had a bad experience because I have no idea about timelines since we've never had to hire anyone but a month for a roofer?

    We had 7 recommendations for someone to come out to put in the flashing for a new vent pipe, range exhaust and flashing failed in another part of the house(the pitch of our roof was uncomfortable to us or we'd gladly do it).

    We called all of them and only heard back from 2 in a 2 week period(one made an appt for one day, no call/no show/I called to follow-up and no call back - they called a week later to tell us they were coming, what!?) The company we went with took another week to get back to us after we signed the contract. In the end, it was a month before any of that was done.

    This is a great thread for DIY info, all of you hit the points we've been learning along the way. I wonder if we can get this put someplace where we can keep it handy for future questions.

  • 16 years ago

    billp 1 ~~

    Would you share with us the on line retailer that you found such a good price for your cabinets? I don't know where to even start looking on line.
    THANKS!

  • 16 years ago

    Be sure you're not biting off more than you can chew. Many people can bring some DIY talent to the picture, but it's rare that anyone can DIY the whole project to the same level. And, it's usually the design and install of the cabinets that gives the most trouble. You really need to understand how to measure (3x in every single dimension) and what those measurements will mean for your clearances for the different types of cabinets. Partial overlay and full overlay or frameless have different design considerations for those clearances. Be sure you understand that during the design phase and not the install phase.

    Don't be afraid to seek professional help. To do a successful kitchen design, you have to understand measurements, clearances, code questions, and the entire 400 page spec book of the cabinet line you choose. Most people don't do a kitchen reno but once or twice in a lifetime and playing catchup with all of that info is frustrating and leads to mistakes. Kitchen Designers do this on a daily basis and most of the time the cost of professional help is folded into your cabinet order. Either way, even a $500 consult with a professional designer could be the best money you spend for the whole project. :)

    A good quality cabinet install can take 10K worth of cabinets and make them look like 100K. The reverse is also true. A bad install can take 100K worth of cabinets and make it look like builders grade crap. If you don't have extremely good finish carpenter skills and understand scribing things to fit, and cutting and installing complex molding, then leave this portion to a professional. If you have fairly good skills in this area, then before you start go and buy some cheap molding from a box store to practice on before you cut that $150 a stick cabinet molding. It's not "measure twice", it's "measure 5x" before cutting once. :)

    You'll save some money yes, if you DIY, but only if you already own plenty of tools. YOu'll need: air compressor and brad nailer, compound miter saw, good quality 18V cordless drill, laser level, plumb bob, chisels, hammers, screw drivers, tile saw, notched trowel, grout float, lots and lots of clamps, stud finder, caulking gun, drywall taping knife, and not to mention all of the plumbing and electrical tools like wire strippers and pipe cutters. THe biggest tool you'll need will be a truck to be able to haul your supplies home. Most construction supplies don't don't fit into an Accord. :)

    The biggest element that you'll need for a DIY remodel is plenty of time and patience. This will take more than twice as long as if you hired professionals, and doing a kitchen remodel with pros takes 6-12 weeks on average. You'll also need a lot of patience and not get flustered easily. If you're an aggressive Type A personality, you may be suited to the demo, but doing the tricky small cutting for a backsplash will drive you crazy. This goes back to know your limitations.

  • 16 years ago

    This is a great thread. Taking notes madly here!

  • 16 years ago

    We purchased our Kraftmaid cabinets on line from Designer Cabinets. We live in New York and they are located in Lexington KY. I found them from a past posting on this site.

    It took a few phone calls and Emails to do the design and order but it was worth it to us.

  • 16 years ago

    Wow. Thanks for all the advice. Some of the comments made me realize things that I was overlooking. I will definitely have a better kitchen because of you guys. Thanks again

  • 16 years ago

    OMG. I just read live wire oak's post about the tools. T H E TOOLS! We actually already had all of those tools (we have a barn/shop -- DH believes it is his destiny to fill it with tools and/or old cars). But oak is right -- factor in the cost if you don't already have them!

    And also factor in all that "stuff" that doesn't fit neatly in the "fun" part of the planning:

    Rough carpentry (nails, screws, concrete screws for studs, shims, sandpaper, proper drill bits, maybe a paddle bit, maybe a new blade for the saw, plywood and blocking for reinforcement between studs for the range hood)

    Drywall (drywall screws, sharp utility knife, extra blades, tape, corner bead, joint compound, jack (or home-made drywall "T" to hold up the ceiling pieces while screwing in), sanding block, special saw blade for cutting ceiling outlet holes, primer, paint)

    Finish carpentry (trim, crown, backing blocks, stain, putty/filler, caulk, glue)

    Tile work (tile, backer board, tile saw, tile nippers, special nippers for glass tile, mastic/thin-set, proper trowels, stirring paddle for drill for thin-set and grout, grout, grout float, sponge, knee pads)

    Plumbing (I don't know what to put here, buecause I always pay a pro to do this)

    Wiring (proper wire, citrcuit breaker for new circuit, voltmeter, wire strippers, proper boxes, covers, outlets, switches, wire nuts, electrical tape, brackets to hold the wire to the studs)

    All that extra stuff needs to be budgeted.

  • 16 years ago

    Check with the online companies as they can save you thousands of dollars. Most are RTA but there are a few that sell fully assembled and deliver nationally.

    http://www.fourlesscabinets.com

    Here is a link that might be useful: kitchen cabinets

  • 16 years ago

    Just want to second live wire oak about the need for extreme patience and also building in an expectation that everything is going to take longer. My DH works on the kitchen a couple of hours a day -- the rest of the time he is doing other things around the house and garden, taking care of the dogs, fixing things that need fixing elsewhere. You cannot spend all your time on the kitchen or you will go crazy -- and get burned out and make mistakes.

    My DH is meticulous and he knows a lot but he is still amazed at everything he has to learn on this project (we are rebuilding our own cabinets and reusing old gumwood for the fronts). He is also amazed at all the tools and materials he has had to add to what was already a pretty good toolchest. Most recently he sprang for something called a Fein Multimaster.

    He is quite patient (I am much less so): his greatest frustration is that it is not going to be as perfect in every way as he would like it to be. Almost goes with the DIY territory.

  • 16 years ago

    We're mid DIY kitchen remodel. We're taking it UBER slow and have truly benefited from it, however, if I could do one thing over, I'd have *another* place to go after we are done working for the day. We bought a home, moved into the upstairs (bedrooms/baths) and den thinking that our living space, kitchen, dining room would be under construction and we'd kinda do "the rest of it", once we got done with the kitchen/dining remodel. Now we have every square inch of our home "not finished". I don't have an escape really and find that I need that, desperately. So, I am assuming your home isn't new to you, but if there are any small projects in your living spaces that is undone, I would certainly get them done so that you have 100% completion in the area you can rest in!

    D

  • 16 years ago

    Having to buy new tools for the reno is not a downside. It's a great excuse to buy new tools!

  • 16 years ago

    One thing to keep in mind with a DIY, it seems that most of the work gets done in the beginning rather quickly. You are on fire...go go go. And then real life will start to creep back in and you slow down a bit while tending to other projects. That's ok, there is sommething special about this part too--each time something is knocked off the punch list it seems like you just invented sliced bread, again.

    So stay patient. It has been a lonnnng time since we started our kitchen, and right now, I'm looking at some shoe molding that is tucked behind our sofa--it was supposed to be installed awhile ago, but you know--the upstais shower developed a leak, and well--the new ceiling has a hole in it now...(ok, so dh just got the drywall up last weekend to finish up the fix).

    Lots of pictures, before, during and after. You will want to look back at them. You might also want to have them on a digital photo frame, running in the new kitchen--I know some people have done that.

    Of course wine is good (so is whine--that is one thing we at GW can certainly help you with!) If the reno gets into the hot weather months--I'd suggest the Margaritaville Frozen Concoction Maker too.

  • 16 years ago

    I kept a log on my DIY kitchen - my total was about 850 labor hours spread over two years. In my case, I built or refaced all of the cabinets, so in many ways, each cabinet was also a "mini woodworking project". My initial estimate was 400 hours over 1 to 1.5 years. My point is that it will take longer than you think (which many previous posters have noted.

    There is a bunch of other good advice here. I'll add a few (may be repeats).

    + Write very detailed task lists that break down every step of a job or of a day's labor. Really think about each step. This will help you remember to buy tools or materials you don't have, and will help keep you focused and not miss steps. I usually started the "next list" while I was still on the last job, and when things would come to me, say in the shower, I would add them to the list.

    + When you gut the existing kitchen you have a *huge* opportunity to access infrastructure (plumbing, electrical, joists, etc.) that you don't normally have. Really, really think about what you might do while the walls are exposed and you can get behind them. This also makes the design so important - you don't want to come back later and think about that outlet you wish you had added, or that island sink you didn't plumb for.

    + Measure how level your floors are, and if they are really out of level, what is the reason and can it be fixed? Level floors make a big difference to the ease of cabinet installation, and benefit the final result. We had one section of floor that dropped 3/4 inch from the baseboard to the cabinet front (24 inches), near the double oven. Since we were replacing our 100 pound double oven with a 350 pound Electrolux monster, I used jack posts under the kitchen both to raise and to permanently support this section.

    + You are very likely to damage your cabinets in some way after they are delivered. Think and plan how you will keep from doing that. That could mean putting tape around tool handles, wearing non-scuff shoes, having a safe place to store the cabinets, not picking them up by the doors, using a lifting device to place and hold upper cabinets, hiring stronger people to move them, etc.

    + Instead of wedges and 2X4's, I used adjustable leveler legs from Rockler on all my new cabinets. At $13 per set, they are not cheap, but not expensive compared to the cost of cabinets, of my time saved, and of the ability to fine tune the level. You can find them here:

    http://www.rockler.com/product.cfm?page=5217