We are looking to possibly build a house. We have a lot in mind but are careful about running the numbers before we make the final decision. Are there any advantages of hiring a project manager to build your house - he could hire all the subs vs using an established builder? We have someone in mind that we trust and is very experienced. Would there be a significant cost savings or is it not worth the hassle?

Comments (19)

  • 11 years ago
    last modified: 11 years ago

    A project manager will typically save you significant costs but you also lose some of the protections that a GC offers. If you are going to go with a project manager you really need to make sure the specs are very robust and complete, even then some of the savings will be eaten up by reworks.

    jen1lynn thanked bry911
  • 11 years ago

    I've never seen a PM used on a residential home, only commercial. Why not simply hire a GC?

  • PRO
    11 years ago

    "...Are there any advantages of hiring a project manager to build your house - he could hire all the subs vs using an established builder?..." It's unclear what your concerns are and why you might want to do this. Is it because you know this person and trust her/him, rather than an "experienced builder"? At the end of the day, you will have to hire someone to build your house. That person will have to hire sub-contractors, purchase materials (except where sub-contractors do so), set-up and manage the site and construction, and deliver the completed house called for in the construction contract. In any type of construction contract, there are two basic parties: 1) the owner; 2) whomever provides the construction services. The important point is that each of the two parties always looks after their own interests. If you are unskilled at residential construction, and/or do not have time for proper construction contract administration and construction observation, then it may be in your interest to hire someone to represent you, with authority to direct the contractor. Will any of these options result in a "significant cost savings"? The only way to truly know is to spend adequate time getting quotations for services and construction from PMs and CMs and builders. My sense is that it may be unlikely to save much, if at all, on the total construction cost. But you may be able to get a higher quality construction result, and a more realistic schedule by using an experienced PM or CM, if that's an important issue. There are so many other options to achieve this end result, including hiring an architect or engineer as your representative during construction, or using a design-build firm for all services. Hope this helps. Good luck on your project.

    jen1lynn thanked Virgil Carter Fine Art
  • 11 years ago

    Very helpful information thanks!

  • 11 years ago

    For a longer answer than I gave last night. There are some advantages and disadvantages of using a project manager. The largest advantage is cost savings, which typically come from overhead, risk and profit reductions. Residential project managers often call themselves construction advisors, but regardless of what they call themselves they typically act as your representative to subs that you hire. They assist with the bidding process, handle scheduling, supervise day to day work and authorize sub payment. They do not, however, contract with or pay the subs themselves. Essentially you are the GC and they are your authorized agent. They will have little or no overhead, their liability is limited to negligence, and they have virtually no risk of loss at all.

    There can be some warranty problems but these are somewhat complicated. Legally a builder in a cost plus contract offers very few real warranty protections and some problems. However, in reality builders offer a lot of warranty protections. A good builder absorbs many costs that do not meet a discussed standard, many of these they really have no legal obligation to absorb and would win in court but they do absorb because it is good business. But one problem with this arrangement is you have no standing with subs. You can't sue a sub directly, they don't work for you. With a project manager you are a party to all sub contracts and retain standing. Realize though, the subs are not going to be held to a discussed pie in the sky standard, you either have to spell out the standards in the contract, or be held to "industry standard."

    So if you want a quality built home while seeing some savings, you have to use very detailed spec sheets. Quality must be controlled on the front end as you lose most of the ability to control quality effeciently during the build.

  • 11 years ago

    I've acted as a project manager a few times, as opposed to my usual route of building on spec and hoping not to go broke!


    In my case, the advantages to the clients vs. my acting as a builder/general contractor were that their cost was clear--no markups, no incentives to cut corners to increase my margin and greater flexibility to change finishes as we proceeded without endless recalculations of cost.


    Even though I was a project manager and the clients were the official "builders," the finished home was fully covered under the mandatory government warranty programme that I was registered in as a builder.


    The disadvantages to me were the profit I was forgoing--which I knew of in advance--and the blowback that came when the clients bounced cheques to the trades and suppliers that worked on the projects because they knew me and my reputation for prompt payment.


    In this type of arrangement, as important as the written contract is that the clients trust the experience, competence and honesty of the project manager.


  • 11 years ago
    last modified: 11 years ago

    *Removed since the replied to post was removed

  • 11 years ago
    last modified: 11 years ago

    **"A builder in a cost plus contract is a GC with the same warranty obligations to the owner as in a lump sum contract" **-

    This is simply inaccurate. If you want the short explanation skip the italics part.

    To understand exactly why it is not accurate some history of cost plus contracts is helpful...They were first widely utilized in WW2 to encourage companies to innovate for the war without risk of financial harm when the innovation wasn't as successful as possible. They were mildly successful but really hit their stride in the space race. Cost Plus contracts allowed contractors to be removed from quality decisions (and incidentally price decisions) so NASA could build rockets and not have to worry about contractors cutting corners to make profits. These two things, quality and price controls, are what led to their adoption in mainstream construction. The entire reason that cost plus contracts exist is to remove contractors from quality decisions.

    Since the customer picks the quality/price level of the subcontractors through the competitive bidding process in a cost plus contract, the contractor significantly indemnifies himself from quality of sub work lawsuits. The court's response is, the owner had control of the sub bids, and should have picked a better sub. You can't hold a builder to a high standard if he had no control of the subcontractor choice. Of course, he is still held to some standards but they are essentially only industry standards. This isn't really a problem if he agrees the work was substandard and initiates a suit against the sub or agrees to cover it, but it can be a real problem if he doesn't agree the work is substandard or doesn't want to engage in a legal battle as he provides a legal shield for subs. This is not an insurmountable shield but it adds a layer of problems.

    None of these problems really exist in a fixed price contract. He can be held to much higher quality standards, such as advertised standards, his typical standards, promised standards, etc.

    In short, while the differences may be subtle, and may never be noticed by most homeowners, they can be significant when things go bad.

    **I should point out that the OP asked about a PM who would hire the subs which makes him a General Contractor whether he calls himself one or not.** -

    You assume they are contracting with him to build the house rather than act as their agent. Something that would be highly unusual in their described situation. You can have people act on your behalf all day long while retaining your standing in a court of law. Representatives hire people daily without creating a liability shield. It is called agency and it is incredibly common, so common in legal matters that it approaches the standard arrangement.

  • 11 years ago
    last modified: 11 years ago

    >>>"Since the customer picks the quality/price level of the subcontractors through the competitive bidding process in a cost plus contract . . . . the owner had control of the sub bids"<<<

    I think these generalizations/assumptions are not necessarily correct for residential home construction.

    [edited to clarify: many contracts handle allowances as mini-cost plus arrangements. The allowances typically are there because, e.g., owner has not decided whether flooring will be wood or carpet, not because owner is going to pick the flooring sub.]

  • 11 years ago
    last modified: 11 years ago

    Those things, that you describe as generalizations, are the entire reason for a cost plus build, without them there is absolutely no reason for cost plus contracts.

    All contracts can be adjusted, but this entire conversation is on generalities. We can't comment at all on the OPs situation directly, without specific knowledge of the contract, the work, the location, the person they are considering and sub quality in the area. The only thing we can do is generalize.

    The whole legal thing is an interesting tangent, but as I indicated originally of little real bearing. So I am not sure if we should continue down the legal tangent.

    Edit in response to clarification: First, they are really not mini cost plus contracts, for that to be true then the owner would have to know the builder's profit, because if they spend less the return of savings would be the savings plus the markup (if you spent $2,000 less than the allowance and the builder had a 20% markup, then you would get $2,400 returned). That doesn't usually happen.

    Second, they are very rarely placeholders until owner decides on hardwood vs carpet. They typically allow the owner to select specific fixtures they want and it goes a long way to proving my point. Tell your builder that you have decided to go with cheap Chinese knockoffs from ebay since he has to warranty them just like they are quality supply house products. You will get a very clear explanation how the warranty is different if you pick crap than for his quality items.

  • 11 years ago
    last modified: 11 years ago

    *Removed as the replied to post was removed

  • 11 years ago

    I will make it simple - General Contractors are the most judgement proof guys on a job site. Yet in any builder relationship he is the only guy you have standing with.

    When things are good the relationship provides positive benefits for customers...when things go really south customers can be left holding the bag much more so than with a project manager.

    There are thousands of cases of builders not paying subs, building substandard houses, or just absconding with the money. These things don't exist in a typical PM relationship.

  • PRO
    11 years ago

    "...These things don't exist in a typical PM relationship..." Surely you're joking? Are you trying to tell us PM relationships are bullet-proof? I'm a former executive director of the Project Management Institute (PMI). I know better.

  • 11 years ago
    last modified: 11 years ago

    You guys are looking for a fight where there isn't one. No I am not saying that PM relationships are bulletproof. In fact, what I am saying is exactly the opposite, they are so full of entry points to begin with that they mitigate damage. They go bad just as often as builders, but your PM has fiduciary responsibilities, so while he can take off with his pot of gold, he can't leave with everyone elses.

    Which is the very small and very unlikely thing that I made a brief mention of, in order to qualify how insignificant it was. And then get drug into a 10 post argument on something I noted had no real effect. I have been trying to get away from this stupid tangent for several posts now. There are legal advantages to a PM rather than a GC. Which is incredibly important in very rare circumstances. Can we all agree that whether right or wrong it isn't applicable to the OPs post and move on?

    Edited because I was ruder than called for.

  • 11 years ago

    I suppose I would say that if one is more concerned that the potential GC is going to pose a higher risk than the subs, that the person is talking to the wrong GC.

  • 11 years ago
    last modified: 11 years ago

    In my experience a project manager acts in a fiduciary role where a G.C. does not. In home construction, they can and often do replace a contractor but that is not necessary, they may work alongside a contractor. Generally, you are employing an expert to make decisions for you and sometimes with you. In most contracts they are even referred to as "the owners' project manager" to illustrate, that unlike a builder, they have a fiduciary responsibility to the owner, where a general contractor is simply a party in an arms length transaction. I personally prefer them to a builder, because it removes the "principle-agency problem," from home construction. The fact that they save money is really a side effect, and arguably those savings come from somewhere - lesser "guarantees or warranties" are where those are cited. Maybe guarantees and warranties are the wrong words and that is producing the confusion - a G.C. will typically absorb rework costs when a decision he made or work he approved wasn't work that was desired by the client. A PM has no pool from which to absorb that, this warranty of acceptability by clients is what I am referring to.


  • PRO
    11 years ago

    Have we gone a bit overboard and beyond the OP's questions?

  • 11 years ago
    last modified: 11 years ago

    Lost me! But, then, I'm merely "a glorified GC with construction management skills, a list of subs and no truck". And I haven't pm'd any high-rises at Haavard. (BTW, I do have the truck.)

    The main reason I could save the owners money over a general contractor was that all unforseen costs for whatever reason were the owner's responsibility. So I didn't have to build it into my charges "just in case". As well, all bills were directly payable by the owners, so I didn't have financing costs while waiting for my money from the owner. Ironically, in a couple of cases my company lent money to clients as secondary mortgages or demand loans so they could finish the projects--and pay me.