Cabinet delivery question

10 years ago

Our cabinets are arriving on Monday! So excited! My only problem is that my husband is traveling and I have a meeting at work it will be difficult to reschedule. Is it ok to have our contractor receive the cabinets and then I inspect them for issues when I get home, or should I reschedule the delivery? We bought the cabinets ourselves.

Comments (11)

  • 10 years ago

    If they have to come back and pick up, you pay the delivery. That's what happened to me even though the store made the mistake.

    DC Reno thanked beachem
  • 10 years ago

    Did you get the wrong cabinets or did they have damage? That is my big fear!

  • 10 years ago

    No one has the eye for damage than the one paying for it.:)) But most issues aren't noticed until it's unwrapped and set in place mostly. So it's unlikely the delivery people will wait.for you to do a thorough inspection I'm guessing.

    If you have a good GC and trust him, he could take delivery. He wants to get paid too. :)) Tough call.

  • 10 years ago

    I have Medallion/Schuler cabinets. The delivery people would not wait for inspection which I understand as we had 30 cabinet boxes. I went ove the manifest as they were delivering the boxes and was told I had 30 days to note any damage or problems with the cabinets. Some of the boxes had damage on the outside and no damage to cabinets while other boxes were in perfect shape and there was slight damage to a cabinet or two. Let your GC accept the cabinets and take you time inspecting them. There is no way to pull them out of boxes and repack them in a short time period. The delivery men usually won't wait. anyway. as it takes hours.

  • PRO
    10 years ago

    If a carton has obvious damage, inspect it before you sign off, otherwise you may not be as covered as you might have been.

    Casey

  • 10 years ago

    This is where a cell phone camera becomes handy. If a crate or box has obvious damage, take a picture before you touch anything. Don't throw out the packing, either.

    The delivery inspection is really to make sure all the pieces ended up in the right place and that there are no missing units. Have your GC count the cabinets, make sure nothing is missing from the manifest and sign for the delivery. Later, you can go over everything yourself at your leisure. Some damage may not be apparent until the units are unpacked. That's something you can do later, too. But, don't wait weeks until you inspect them. The sooner you know there is a problem, the sooner it will be resolved.

  • 10 years ago

    For me it was the wrong tiles that were delivered. I had to pay for delivery back to the importer and for the new delivery. That was an extra $1100 that was not in budget.

    For the cabinets, you can't open the boxes but you count how many and check the manifest along with any boxes visibly damaged. At my cousin's, there were 3 boxes that were crushed looking. We opened those right away.

    I did check beforehand with the company about how they want to handle damages. You can do the same with your vendor. You may not have to be there if they will cover everything.

  • PRO
    10 years ago

    During delivery we only ever inspect things that show obvious damage. Anything else is covered under warranty without a problem (at least with who I deal with) so long as it is documented and submitted PRIOR to installation of the item.

    Who is supplying the cabinets? All my makers require that someone is responsible to check items, as they unload, against the packing list- for large orders I've had two checkers on hand. Before production ever began a detailed acknowledgement is sent to us to check-that (is supposed to ) matches the packing list.

    If for some reason there is a discrepancy between the acknowledgement and the order we won't discover that until later and it is covered. If we screwed up and made a mistake on the order, missed it in the acknowledgement, we won't know that until later either. That is also covered-by me.

    We also must have people to carry them into the house.

    DC Reno thanked MarkJames & Co
  • 10 years ago

    Thanks you all! Our GC told me the same when I just asked him - they will receive and sign for the cabinets and we can inspect together before they're installed. The kitchen is all ready for them so I'm hoping we will have a functioning kitchen in a week. Fingers crossed there are no issues with the cabs!!

  • 10 years ago

    No advice, but I'm SO excited for you!

    DC Reno thanked sheloveslayouts