Software
Houzz Logo Print
junk9face

Final product: Hall bath remodel

8 years ago

House was built in 1979 with compartment bath that was popular at the time. I removed the wall, widened and move the hall door. The fixtures were relocated. The tub was removed and replaced with a curbless, doorless shower. A wall hung vanity was used to increase airiness.


Before:






After:





The drain is hidden between the spaces in the stones:



Comments (19)

Sponsored
AIS Renovations
Average rating: 4.5 out of 5 stars15 Reviews
Custom Craftsmanship & Construction Solutions in Franklin County, Ohio