Software
Houzz Logo Print
junk9face

Final product: Master bath remodel

8 years ago

Note - hall bath remodel is here: [https://www.houzz.com/discussions/final-product-hall-bath-remodel-dsvw-vd~5069621[(https://www.houzz.com/discussions/final-product-hall-bath-remodel-dsvw-vd~5069621)


This was a to-the-studs remodel. The ceiling was vaulted and the wall next to the toilet was removed to increase spaciousness. A wall hung vanity was used to make it more airy. The fixtures were kept in about the same location except the tub was reposistioned (in the before, the tub is disguised as a settee). The shower was changed to a curbless, doorless shower.

The entire back wall was tiled. The door on the back wall goes to the pool. The 6' x 12' closet is behind the vanity wall and was tiled with the same tile as the bath.


Before and after side by sides:





The drain is hidden in gaps between the stones:




Comments (13)