Software
Houzz Logo Print
bryan_hobbs36

Chimney Flashing HELP!

8 years ago

I just got my flashing on my chimney redone....and am less than happy. First, it is hideously white and HUGE! More importantly, I do not think it will stay water tight for very long. There is no counter flashing, they are laid on top of the tile, and everything was secured down with nails that have not been caulked over. I am not a roofer, but I thought that these are all necessities in chimney flashing.


Can someone please give me advice. I want to call the company and have them come back to fix it, but I want to make sure I am justified. I also have more pictures if necessary.


Notice the open slit in the material and the 2 FEET of FLASHING!


Comments (15)

  • 8 years ago

    Wow! That's a hack job for sure. I'm guessing you didn't get any references on these guys before giving them the job? Regarding your question about calling them back to do the job right: it appears they don't know how to do the job correctly. Maybe they aren't working under the owner's direction and the owner would be alarmed to find out the quality of work they're doing.

  • 8 years ago

    I have no idea what they were up to; it's the craziest flashing job I've seen. When you install chimney flashing you need to use a grinder on the mortar lines so the flashing can be tucked in between the bricks. It looks like they just cut flashing to mimic the look of proper flashing and glued it in place. And cosmetically the horridly done and inappropriate caulking is mind-boggling. Were they sober when they did this job?

  • 8 years ago

    It was a roofer the chimney place provided...they did some work on the chimney and included that.

  • 8 years ago

    The “chimney place” needs to see this picture. I’m guessing they will want to switch subs for this type work in the future. They should also “make it right” for you.

  • 8 years ago

    Thanks for responding, I am happy to hear that it wasn't just me and my wife being picky.

  • 8 years ago

    In the future definitely make sure that you specify things like flashing color before the job starts. Don't trust that a contractor has the same sense of aesthetics as you do, and make sure you get it in writing on the quote/proposal. As for the workmanship, as others have said this is clearly not well done.

  • 8 years ago
    last modified: 8 years ago

    "In the future definitely make sure that you specify things like flashing color before the job starts."

    Color, hell? Material more is more important ann aluminum is not it. That should be lead, and as stated above not even close to correct. Asthetics aside, the caulk at the top of trim coil as a weatherproofing is almost comical........................

  • 8 years ago

    Did you pay them already? Holy crap... that is ridiculous.

    Flannel Guy DIY - Youtube

  • 8 years ago

    Lead is really still used for flashing? Interesting. I had no idea.

    Sure glad I'm not a roofer. I hope they use gloves for handling it. I wonder what your dose would be if you didn't, then took your lunch break and smoked a cigarette or two.

  • 8 years ago

    Probably the same dose of copper you get counting your pennies. Don't worry though, you wouldn't be able to lift a roll of lead...

  • 8 years ago

    Hmmm...I'll take a dose of copper over lead any day.

  • PRO
    8 years ago

    Being in the construction industry over 30 years I never saw anyone using led for flashing or saw lead flashing being sold in any building supply store. Copper or Aluminum are most common products for that.

  • 8 years ago

    Really GN Builders, used here on Long Island all the time and sold at all of the lumberyards to this day to my knowledge.

  • 8 years ago

    I've never seen a masonary chimney that wasn't flashed with lead. Even the big box stores carry it here.