Software
Houzz Logo Print
harry_gambleiii

landscape dilemma

6 years ago

I have this “what to do with?” area here between new deck and newly poured concrete area around the pool. Kind of wished I would have poured the concrete further to where the deck is, or built the deck to the concrete (with a step bc the two are not level). Both of those are still options, but prob the most costly options. Several thoughts: 1) use the antique bricks that I have pictured to fill the gap (with a step going up from deck to concrete) 2) use cross ties 3) fill with plants. This is in Birmingham, Alabama. Any thoughts appreciated!

Comments (7)