Crooked contractor?

6 years ago

So, we are renovating our outdoor space, and used a full service design/build firm. The project calls for a round Trex deck (10’ radius). The contractor claims that due to roots from my neighbor’s tree, the deck construction is not possible and must be done in pavers instead (Unilock), and that although the paver route is more expensive he is willing to eat the cost.

Now, I have a couple of issues:

  1. No digging was done to valid the presence of invasive roots
  2. My neighbor’s tree is far from my house (around 15 yards). The contractor claims that the branches overhanging on my property means there are roots mirroring them under the surface.
  3. No way that pavers is more expensive.

This all sounds like a bunch of foolishness to cut costs and pocket the full contract amount. What do you all think?

Comments (49)

  • 6 years ago

    The prep for the ground for pavers is extensive. Sounds mean but I would have them removed the roots and proceed with the deck..that parts sounds fishy to me.

  • 6 years ago

    Roots generally do extend to the drip line.

    Would footers be needed for the deck?

  • PRO
    6 years ago

    This contractor is full of crap.

  • PRO
    6 years ago

    I don't know why the deck cannot be built with the roots being there. You will damage more roots by doing pavers in comparison doing a footing for a deck.

    It's very simple and it's done all the time... You dig a footing and cut back a few roots that in the way, and you good to go.

    Much less work than pavers, because with pavers you have to grind all of the roots, replace the soil so the proper sub-base material can be installed and compacted.

    I think he is giving you a bunch of BS because he didn't account for a 10' deck radius, which is costly, you have to special order pre-bend boards (unless he can do it himself) and you have to order railings with specified radius and that will cost a little.

    Maybe he gave you a low-bid to get a foot in the door and now trying to veer-off from building the deck.

  • 6 years ago

    I agree with you all. The change is significant. We have small children & want to lay on a deck, not pavers!

    Even though I am beyond skeptical that what he is saying. I proposed building the deck without footers & needing to dig. He claims that building it without footers is an improper install. I’ve attached an image. Note: the concrete wall is behind the deck, not on the deck.

  • PRO
    6 years ago



    As others have said, excavation for pavers is going to be way more of an issue than a few post holes. For the screen porch above we were building right next to a 100+ year old oak (right side of the frame). We marked out footer locations and the arborist used an air spade to expose the roots and cleanly pruned the roots as we dug. But we were within 20 feet of the trunk. If you're 45+ ft away I would be surprised if an arborist would suggest such a tedious approach.


    It sounds like you have a vision in your head of how you'll use the backyard once the deck is in, and you're picturing you and the kids kicking back, chatting and watching the clouds go by. It doesn't sound like the patio will give you that. I feel like *crooked* may be too strong a word but there's definitely something going on that has caused the contractor to reconsider the plan. Your choice is to probe a little more to find out what that is, or to look for another installer.

  • 6 years ago

    Get a new contractor. This one is guaranteed to be a problem.

  • 6 years ago

    Thank you guys for your thoughts. I agree that it has nothing to do with the roots, he is now proposing a square/rectangular option. So this most likely has to with poor planning and/or budgeting.

    General question just for my information: is installing a small step up deck without footers improper?

  • PRO
    6 years ago

    "General question just for my information: is installing a small step up deck without footers improper?"


    It depends on the freeze-thaw cycle, if any, where you live. If you're in Alaska, you better dig 48" down. If you're in the desert, I'd build my deck on crushed gravel like a railroad bed.

  • PRO
    6 years ago

    Check your local code, if it's a ground-level deck and there is no ledger attached to the house, you don't have to install footings if the deck is under 400SF.

  • PRO
    6 years ago

    15 yards away, as in 45 feet? What the heck is this tree that it won't allow footings 45 feet away? Nuh-uh. And then the goal-post shifting to other?

    Get yourself a different contractor.

  • 6 years ago

    Find a contractor who will give you the deck You want, not the patio He wants.

  • 6 years ago

    I hope everyone enjoyed the holiday.

    I’m located in the Northeast so it sounds like above ground/floating deck isn’t ideal. I’m frustrated because work has already begun and I don’t really know what to do about this.

  • PRO
    6 years ago

    The contractor was still proposing on Sunday, but work has already begun as of today? Did you tell the contractor to go ahead with whatever they wanted?

    What to do? Tell them to stop putting in what they want. Tell them you want to have what you want. If they say no, say goodbye.

  • 6 years ago

    The work had already begun a week and a half ago. It was a week into the job that this “issue” was raised about being unable to dig footings for the round deck allegedly due to my neighbor’s tree

  • PRO
    6 years ago

    Oh, I'm sorry, I thought your project was still in the proposal stages, not that work had already started before you started this thread.

  • PRO
    6 years ago

    Ask them what they would need - arborist's evaluation, letter from neighbor - to proceed as originally intended. Outside of that, without seeing the overall plans and the contract it's hard to give a concrete set of next steps.

  • 6 years ago

    Also have to ask if your town requires a permit for this work and was it obtained based on the round deck. Some places have made people rip out nonpermitted decks/patios. You need to have them stop work and meet and get to the bottom of all this.

  • 6 years ago

    No permit is needed. This is truly embarrassing and I can’t believe we are having these troubles.

    Now, the contractor says that we can do a round deck BUT instead of footings, he will pour concrete and build the deck on concrete. It is an 11’ deck, 2’ tall, we are in the Northeast. Is this a proper install?

  • 6 years ago

    You need to get out of this contract, this guys sounds like an idiot.

  • 6 years ago

    For the screen porch above we were building right next to a 100+ year old oak (right side of the frame)

    You mean that much younger silver maple, with characteristic bark, trunk shape and distinctive silver backed, light green maple shaped leaves - the latter of which are visible in the top left of the frame?

  • 6 years ago

    Just tell him to dig the footers and build it like what is in your contract. The roots are not a valid excuse. You could even tell him that you will sign something to say that if the tree dies (which it won't) it isn't his fault.

  • PRO
    6 years ago

    @Embothrium what, you never have a brain fart when you're in the middle of the busy season? Nice catch.

  • 6 years ago
    last modified: 6 years ago

    a brain fart when you're in the middle of the busy season

    Sounds messy!

  • PRO
    6 years ago

    You have no idea!


    @JT Trent how goes it?

  • 6 years ago

    So, we are still moving forward. We put a nice chunk of change down as a deposit and work had already begun. We landed on doing the round deck, but having it built on a concrete slab. The deck is about a foot off of the ground. What do you think?

    As for everything else, progress is not being made as quickly as I would like, but I am being assured that we will meet our deadline 3weeks from now. So, fingers crossed.

    I’ll keep you guys posted.

  • 6 years ago

    Well guys. This project is going down the tubes. The contractor is requesting more $ even though milestones haven’t been met. We handed over $15k and have some demo a partial deck to show for it. I am at my wits end.

  • PRO
    6 years ago

    There's a lot to tease out to figure out where things stand. Feel free to message me. It's my anniversary so I'm shutting down for the day but I can reply back tomorrow.

  • PRO
    6 years ago

    Oh no, I'm sorry to hear that JT! That contractor needs to keep up their end of the contract, or give you a refund- 15K already paid out and that's all you got so far? How much is the total project supposed to be?

  • 6 years ago

    Happy anniversary @revolutionarygardens!!!

    It’s a $47k contract. He is claiming that he has used all of the funds plus some of his own $.

    The agreement is drafted such that we pay on milestones, not time period. He wants to revise.

    We asked for receipts showing where our $ went, and to speak to his sub contractor to make sure he has been paid (because they haven’t shown up here since 7/3). He has produced no receipts and said he doesn’t feel comfortable with us talking to the sub

  • PRO
    6 years ago

    Nope, nope, nope... sounds more like he spent money elsewhere and needs more- but not willing to give you even what you have paid for yet. Ouch. Do NOT let him revise, just no- if he had been stellar so far it might be worth considering, but at this point I think you are just going to open yourself to more... disappointment to put it mildly.

    You gotta put your foot down on this... I'm not sure what exactly you need to do, but there are folks around here that can advise like RG...


    BTW, happy anniversary RG!!

  • 6 years ago
    last modified: 6 years ago

    You can't pay this person another dime. Please, don't do it. Don't do it.

    Does anyone else smell a rat when a contractor goes on and on about how much he's spent of his own money? All of the reputable contractors I have had never complain about how much work they're doing, nor how much out of pocket they are. My favorite contractor was our pool builder, who, like they're supposed to, billed in installments when milestones were met. And they were MET before he asked for money. I also noted that his subs had worked for him for years, and the entire huge project came in on time and on budget. Your person is just red flag after red flag. I hope that you got a few bids, and so you can figure out where you're going next.

  • PRO
    6 years ago
    last modified: 6 years ago

    The contracts are always broken down into the payment schedule. Let's say down payment @ signing a contract and the 1st payment to complete the following scope of work before the 2nd payment is due.

    If something similar is in your case do not give another payment until the scope of work has been completed which was covered under the 1st payment and before the 2nd payment is due.

    If he has no more money left and the promised scope of work is not completed that is his problem, not yours., don't give any more money.

    @Revolutionary Gardens Happy Aniversary!

  • PRO
    6 years ago

    Thanks for the anniversary wishes! Or as I call it, the festival of my wife's questionable judgement :D


    Agree with GN, milestones are important. I'm a firm believer that it' not our job to finance your job, HOWEVER, I also believe that milestones should be set up in a way that ensures we have the cash flow needed to keep moving forward, while being fair and reflective of the work installed to date. It doesn't sound like that's the case here.


    Keep us updated. I had foot surgery today so I'll be laying in bed with my foot elevated for 3 days, I can use the distraction.



  • PRO
    6 years ago

    the festival of my wife's questionable judgement :D


    I'm flat out stealing that. My hubby's judgement.. but spot on, lol.

  • 6 years ago

    Haha @ festival of my wife’s questionable judgment. I hope that your recovery is speedy @revolutionary gardens. I sent you a message (I hope I did it right, the button said “contact” instead of “message”.

    The contract called for payment tied to milestones, however, the contractor is claiming that milestones he agreed to no longer make sense. BUT, asking for more payment when I basically only have some demo and some framing to show for $15k.

  • PRO
    6 years ago

    @Revolutionary Gardens I hope everything goes well and have a speedy recovery!


    @JT he is the one who came up with a payment schedule, therefore he is the one not making any sense asking you for more money before the work is done before the next payment is due.

    Like I said before it's not your problem that he cannot figure out the payment schedule for his projects.

  • PRO
    6 years ago

    I got it! Glad you said something bc I didn't get an alert, which is weird.



  • PRO
    6 years ago

    I don't believe there is such thing as a "perfect" contract.


    If the milestones agreed in the contract no longer make sense because of the contractor's inexperience writing contracts, that "learning" can be incorporated in the next contract the contractor writes.


    f the milestones no longer make sense due to extenuating circumstances--and those things happen even absent a worldwide pandemic-- the contractor could submit a written change order proposing revisions to the milestones for client approval. Reasonable people, whether contractor or client, always have the option to act, well, reasonably.

  • 6 years ago

    Are you all ready for a doozy?

    The last update was that we asked for receipts evidencing where and how our money was spent. He sent us a long BS email and we weren’t having any of it. 4 days later (This morning) he sends along “receipts”. One was for pavers (dated 2019 if you look closely), another was from his sub. So we called the sub. Turns out the receipt was a fake AND the sub is also owed money. The GC was telling the sub we didn’t pay him and telling us that we needed to give him more money in order to keep the project going.

    How do people like this sleep at night?

  • 6 years ago

    I repeat


    millworkman

    You need to get out of this contract, this guys sounds like an idiot.

    3 Likes Save July 8, 2020 at 10:00AM

  • 6 years ago

    100% @millworkman. A lot of you all called it. It’s time to call in the lawyers.

  • PRO
    6 years ago

    From the get-go, you can tell that this guy is full of it by trying to switch scope of work, by giving you BS excuses why this or that can't be done and trying to milk you for more money.

    See what your legal options are and get your money back.

    Good luck and keep up posted, please.

  • 5 years ago

    Hey guys! Just providing an update as promised. Our year long nightmare is over & the project is done.

    We got some money back from the original crooked contractor and found someone competent to finish the job. That firm was good, but there were a few delays along the way (to say the least). But they were focused on customer satisfaction and did right by us. We are very pleased.

    Thank you guys for your help!

  • 5 years ago

    Can you put in a picture? I would love to see the finished results.

  • 5 years ago

    Sorry! I’ve been trying to put a pic and having the hardest time.

  • 5 years ago
    last modified: 5 years ago

    Very happy for you and it seems it’s been completed just in time to enjoy it. Have a great summer.

  • 5 years ago

    Thank you Anna! Same to you.