Shower stall dilemma

5 years ago
last modified: 5 years ago

Hi, we are doing a cabin reno and need an acrylic shower stall for our plumbing work starting in May. We are now being told everything has a 12-16 week lead time!! We have identified one unit that is available before May and might work, but the plumbing would have to be on the same side as the seat. Is this an issue?

We didn't actually want a seat and wanted a one piece unit, but do need a shower unit before 16 weeks so this might have to be the one.

https://www.homehardware.ca/en/gallery-2-piece-acrylic-tub-and-shower-less-cap-with-left-seat-white/p/3213025?page=search-results%20page


One other option is a 4 piece unit from Home Depot that doesn't have the seat - but there are more options for leaks.

https://www.homedepot.ca/product/maax-essence-sh-4834-48-inch-4-piece-sectional-alcove-shower-no-seat-center-drain-in-white/1001554116


Thoughts? Thanks!