Software
Houzz Logo Print
filiz_seeborg

shower wall mold damage repair

4 years ago

We discovered shower pan leak that caused partial mold damage in the bathroom. Pan and the whole shower floor was removed and the shower walls were removed by about 2-3 feet from the floor. Water restoration company treated the mold etc. We do have extra tiles so instead of demolishing the whole shower wall we would like to replace the tiles that were removed. But the hardiebacker and the water proof membrane are partially removed while removing the tile for mold treatment. So is it safe to patch the hardiebecker and install the tiles in place of the tiles removed? One of the contractors said he wouldn’t give me guarantee and thought we should demolish the shower wall entirely and rebuild because of the disruption of the water proof membrane. The other contractor said it could be patched. By the way insurance will be covering most of the work minus deductible. I am worried and don’t know which contractor to listen to.I have attached the pictures before the mold treatment and the extent of the tile removal. Thank you for all your suggestions in advance.

Comments (4)