The stoop in the front door inclines towards the house and guides the water into the crawlspace. The stoop itself is outside the foundation wall of the house and is not fixed to it. The lower part of the rim joist is also behind the stoop under the front door. The photo was taken before the lifting. The owner re-did the siding and the trim under the front door to make them touch the stoop to hide the settlement problem.

I wonder if polyjacking the stoop can make its top a slope away from the house, thus to guide the water away. Some concrete jacking contractor made the stoop top level (slight slope toward the house technically) and refused to lift it more. They said the polyjacking was not typically used for water drainage problem. Is it correct? If yes, why? I know polyjacking is waterproof, and should be okay to use here. Isn’t polyjacking capable of making a slope? I did consult multiple large concrete companies before the project started, and did mention that I needed a slope. All of them sugguested polyjacking.

There is some background information I’d like to add. The contractor damaged my front door when they jacked the stoop for the first time, but that damage was caused by a misuse of a prybar, not the polyjacking itself. After I complained, they agreed to replace the door for me. However, they seemed very conservative since then, and refused to lift the concrete more, or told me there were many risks to lift more, e.g., damages to the foundation or wood structure of the house, and/or crack in the stoop, and asked me for all kinds of waiver to release their liabilities.



Comments (9)

  • 3 years ago

    Why not tear it out and fix it correctly? Do it right rather than continual band-aids. If you really want to know if it can be jacked again or more, get another contractor in to take a look. The first guy dug into his pocket for a new front door and doesn't want to take the chance again obviously, he is cutting his loses. Sometime you get more info by what people do not say then what they do say.

  • PRO
    3 years ago

    From the picture it looks like they jacked it back to the original position as it appears to touch the siding and bottom of the door. They physically can’t go higher.

  • 3 years ago
    last modified: 3 years ago

    @HALLETT & Co. This photo was taken before the lifting. The owner re-did the siding and the trim under the front door to hide the settlement problem. If I remove the lower vinyl panels and the trim, can they physically go higher?

  • 3 years ago

    @millworkman I did consult multiple large concrete companies before the project started, and did mention that I needed a slope. All of them sugguested polyjacking. Thus I suppose it's feasible?


    There's one thing I don't understand. Polyjacking did NOT cause the front door damage, and using a pry bar to remove the trim by brutal force did. Why they are so conservative about the former? Do they think they will damage other things by mistake like before?

  • PRO
    3 years ago

    Well then with new information I don’t know why they didn’t raise it another half inch or so. Were you not there when it was done?

  • 3 years ago
    last modified: 3 years ago

    @HALLETT & Co. I was there, but the sidings had not been removed and the subcontractor refused to do it. He asked me to remove them first and left. After I reported the door damage and removed the sidings later, the contractor who hired the subcontractor told me the contractor was not willing to raise it more as polyjacking was not typically used for water drainage problem, and told me many risks to lift more which they did not mention before the project.

  • 3 years ago
    last modified: 3 years ago

    Why they are so conservative about the former? Do they think they will damage other things by mistake like before?.....the contractor who hired the subcontractor told me the contractor was not willing to raise it more as polyjacking was not typically used for water drainage problem, and told me many risks to lift more which they did not mention before the project.

    Probably because the porch has already been jacked & there are possible/ probable voids under it now that weren't there when the original jacking was done. And probably because the porch is surrounded on three sides with house foundation and how more jacking could result in foundation damage.

    Add more expanding polyurethane under there which will expand in even more unpredictable ways into the new voids causing all kinds of havoc. Like cracking the porch, cracking or blowing out a foundation wall. And what all other risks they have warned you about.

    Plus, after having to replace the front door, the property has bad juju as far as the contractor is concerned.

  • 3 years ago

    @ci_lantro I did a bit more homework, and found that with the surrounding foundation walls, the lifting is still feasible. These are examples I found from one large concrete lifting company.

    https://www.ogburnconstructioninc.com/about-us/before-after/51663-concrete-leveling-in-glen-allen-va.html

    https://www.ogburnconstructioninc.com/about-us/before-after/73929-concrete-lifting-in-chester-va.html

  • 3 years ago

    " and found that with the surrounding foundation walls, the lifting is still feasible. "


    The internet can be a dangerous place, there are no absolutes. Your site and exact conditions will dictate if this can be done and what the possible repercussions would be.