ihmike345

Ceiling Joist does not allow range hood to be centered properly...

2 years ago

We hired an architect, general contractor, and kitchen designer to renovate our kitchen as part of a larger renovation. The space was gutted to studs prior to being refinished. A new 6" metal exhaust duct was placed in the general location of where the stove was to be installed. We are 90+% complete but have one lingering issue. There is a ceiling joist centered above where the chimney hood duct work should go. We purchased a XOB chimney style hood ( XOB | XO Appliance ) . I have attached a picture of the current status and added a red line where the joist is. Our contractor has proposed to build a box using the cabinet crown molding which will allow them to transition the exhaust hood duct to the ductwork. That messes up the streamlined look of having the chimney run directly up to the ceiling. We are grasping at straws looking for a solution. Any thoughts?


Comments (9)

  • PRO
    2 years ago

    If it is a joist, and NOT a bottom chord of a truss, it can be framed out with additonal support, to move the duct. If it's the bottom chord of a truss, you need to pick a different hood, with a bigger chimney, that can hide the duct bend.

  • 2 years ago

    I had the same thought about switching to a different hood with a wider chimney. Sell or return the other one. Might not need to be this wide, but something this this?


  • 2 years ago

    Thteee is a second floor and room above that, so I would assume that it is a not the bottom chord of a truss. How much of the new Sheetrock would they have to cutout? I am assuming it could isolated to a small are near where the exhaust enters the ceiling?

  • PRO
    2 years ago
    last modified: 2 years ago

    With a second floor, there is a high chance that it is an engineered I joist that will need a structural engineer's written specifications to get the permit to cut into and re-support. Your GC should have the info for that.

  • PRO
    2 years ago

    Reframe; it ain't all that.

  • 2 years ago

    Joseph, are you saying that to reframe the joist to allow for the duct to be moved over is not a large project? Even though the ceiling has been dry walled and painted? That’s the resolution that we want, I just don’t know how much effort that would be and if it is realistic for me to expect our contractor to do so. Seems like they should have addressed when the room was demo’d to studs 🤷‍♂️

  • 2 years ago

    I would go with a wider chimney at this point. Easy fix without having to tear things up.

  • 2 years ago

    Wider vent plus wider chimney is the better solution all the way around. And a much better quality one as well.

  • PRO
    2 years ago

    Could have been addressed in the plans & engineering IF the hood was selected & everything built exactly per & ceiling opened up etc. BUT a few adjustments to cabinets & appliance sizes and suddenly the hood centerline is moved a few inches and a small chimney doesn't work anymore. Rare we do a chimney like this.