Search results for "Breakdown" in Home Design Ideas

This pond has a 44 mil liner to ensure a leak free swimming structure. The liner material is sensitive to sunlight and will eventually breakdown over the years if it is exposed. As a result, our team spent 3 days meticulously covering the entire pond liner with stone. Each small boulder is hand placed to ensure a perfect fit and not tear the liner in the building process. The amount of patients and effort by our crew is incredible and the result is always beautiful! The waterfall which adds to the natural feel of the pond was created with large stone shelves and a bog for natural filtration. All of our water features use natural filtration processes and no chemicals. We create a simulated bog which the water is pumped into and cleaned naturally though various levels of sand, stone and wetland plants.
Find the right local pro for your project

Inspiration for a large contemporary freestanding desk light wood floor and beige floor home office remodel in Toronto with white walls

The bridge extends through the home and becomes a cantilevered deck. #FOASmallSpaces
Photo credit: Louis Habeck
Small industrial exterior home idea
Small industrial exterior home idea

The Flojet Inlet Strainer will keep your showers clean wherever you are. It's a handy little water filter that will keep the bugs and dirt out of your shower water. Featuring a 20 mesh stainless steel screen, the Inlet will also keep your pump pumping by preventing unnecessary breakdowns caused by particles in the water. A transparent housing unit allows for instant inspection and a screw off top makes for easy cleaning. Also very easy to install with a Flojet Water Pump.

A Carmel Valley pool deck rebuilt with 1,750 sq ft of large-format interlocking pavers, a natural gas fire pit, a 10 ft BBQ island with a raised bar, revised drainage, polymeric sand and sealing, with the pool, masonry, gas and electrical trades coordinated by IID. 12 working days for the hardscape build. Price range $95K to $115K. Full scope and cost breakdown at the link.

A Carmel Valley pool deck rebuilt with 1,750 sq ft of large-format interlocking pavers, a natural gas fire pit, a 10 ft BBQ island with a raised bar, revised drainage, polymeric sand and sealing, with the pool, masonry, gas and electrical trades coordinated by IID. 12 working days for the hardscape build. Price range $95K to $115K. Full scope and cost breakdown at the link.

A Carmel Valley pool deck rebuilt with 1,750 sq ft of large-format interlocking pavers, a natural gas fire pit, a 10 ft BBQ island with a raised bar, revised drainage, polymeric sand and sealing, with the pool, masonry, gas and electrical trades coordinated by IID. 12 working days for the hardscape build. Price range $95K to $115K. Full scope and cost breakdown at the link.

A Carmel Valley pool deck rebuilt with 1,750 sq ft of large-format interlocking pavers, a natural gas fire pit, a 10 ft BBQ island with a raised bar, revised drainage, polymeric sand and sealing, with the pool, masonry, gas and electrical trades coordinated by IID. 12 working days for the hardscape build. Price range $95K to $115K. Full scope and cost breakdown at the link.

A Carmel Valley pool deck rebuilt with 1,750 sq ft of large-format interlocking pavers, a natural gas fire pit, a 10 ft BBQ island with a raised bar, revised drainage, polymeric sand and sealing, with the pool, masonry, gas and electrical trades coordinated by IID. 12 working days for the hardscape build. Price range $95K to $115K. Full scope and cost breakdown at the link.

A Carmel Valley pool deck rebuilt with 1,750 sq ft of large-format interlocking pavers, a natural gas fire pit, a 10 ft BBQ island with a raised bar, revised drainage, polymeric sand and sealing, with the pool, masonry, gas and electrical trades coordinated by IID. 12 working days for the hardscape build. Price range $95K to $115K. Full scope and cost breakdown at the link.

A Carmel Valley pool deck rebuilt with 1,750 sq ft of large-format interlocking pavers, a natural gas fire pit, a 10 ft BBQ island with a raised bar, revised drainage, polymeric sand and sealing, with the pool, masonry, gas and electrical trades coordinated by IID. 12 working days for the hardscape build. Price range $95K to $115K. Full scope and cost breakdown at the link.

A curved paver walkway with a cobble border runs along the side yard past raised beds, a planted border and low-voltage path lights. Planting and irrigation covered 150+ plants on a WiFi controller. Project range $377,500 to $431,000; full scope and cost breakdown at the link.

A stacked-stone kitchen island with a 32 in. built-in grill, countertop pizza oven, refrigerator and storage under a Seville limestone counter, set at the edge of the paver patio beside the cedar pergola. Kitchen range $34,000 to $39,000 of a $377,500 to $431,000 project. Full scope and cost breakdown at the link.

A Carmel Valley pool deck rebuilt with 1,750 sq ft of large-format interlocking pavers, a natural gas fire pit, a 10 ft BBQ island with a raised bar, revised drainage, polymeric sand and sealing, with the pool, masonry, gas and electrical trades coordinated by IID. 12 working days for the hardscape build. Price range $95K to $115K. Full scope and cost breakdown at the link.

The pool side of the same Torrey Del Mar backyard: a stucco seat wall, a stone-veneer fireplace and new stained concrete around the existing pool, lit by part of the 30 up-lights. Part of a Mediterranean outdoor room with a 12 ft BBQ island, timber pergola and 1,145 sq ft of Angelus Courtyard Combo pavers. About six weeks. Price range $85K to $100K. Full scope and cost breakdown at the link.
6




